| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC Lowest Quoted Rate |
| 2 | L2₹1.6 Cr+₹4.1 L (2.58%)Rejected-Finance | ₹1.6 Cr+₹4.1 L (2.58%) | L2 | Rejected-Finance Highest Quoted Rate |
| 3 | L3₹1.6 Cr+₹4.7 L (2.93%)Rejected-Finance | ₹1.6 Cr+₹4.7 L (2.93%) | L3 | Rejected-Finance Highest Quoted Rate |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
28 Jun 2023, 3:00 pmClosed
Project Director DRDA Tiruppur
DRDA Tiruppur Collectorate
Upgradation / Strengthening/ Renewal of 1 road including 5 years routine maintenance after completion under Package no. 82/MGSMT/2022-23 in Kundadam Block of Tiruppur District under MGSMT 2022-23
2023_RDTN_329229_8
DIPR/3001/TENDER/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
KUNDADAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.6 L
Yes
DRDA Tiruppur Collectorate
24 Jul 2023
20 Jun 2023
28 Jun 2023
20 Jun 2023
28 Jun 2023
20 Jun 2023
21 Jun 2023
Amount
1)Strengthening to the road from Thumbalapatty to N.Kungumamapalayam Km 0/0-4/0 Part A - Construction Work Clearing the light / Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete. MORD Specification 111, 112, 201 km 0/0-4/0
Earth work excavation and depositing on back with an initial of 10m and lift 2m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc., as per SS 20 B including laying and spreading in layers of 250 mm loose thick each, sectioning , watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content as determined in occurrence with complete as per MoRD 111, 112, 202, 900, 301, 304 km 0/0-4/0
Providing and laying Gravel including cost and conveyance of gravel from approved sources to work site including labour for spreading , watering and compacting by power roller to achieve the required protect density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.(Shoulders) MORD Specification 111, 112, 401, 900 Km 0/0 - 1/0
Picking of Old matelled / B T surface up to 10 cm thick as directed by the departmental officers
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in subbase/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. MORD Specification 406
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
Tack coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 111, 112, 501, 511, 513, 900
Bituminous Concrete (BC) BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 MORD Specification 111, 112, 501, 507,900 km 0/0-4/0
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design (size 1.65m x 0.45m x 0.15m) as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 Ordinary Kilometer Stone (Precast) specification Clauses 1703
HM stone (precast) - (size 0.90m x 0.15m x 0.15m)
RUMBLE STRIPS COVERED WITH BITUMINOUS SURFACE Provision of 1 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking. Rumble strips - 3*3.75 0.25-2.81 Sqm Km 0/0-4/0
Providing and fixing of typical PMGSY informatory sign board/ CIB with Logo and Maintenance board as per detailed specifications and drawing attached with the tender document.
Star sign stickers providing and fixing of retro -reflectorised cautionary star sign made out of high indensity to hecinatic grade reflective seating sticked over CRC 0.2mm / 32G thickness with black enamel paint firmly fixed on the trees with 1 1/2 x 144
Providing and fixing of retro -reflectorised cautionary,mandatory and information sign as per IRC: 67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting ,1.5mm thick supported on a mild steel angle iron post 75mmX75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmx450mmX600mm,600mm below ground level as per drawings and Technical Specification Clause 801 900mm Equilateral triangle or Size as per IRC :67-2001.
ROAD MARKING WITH HOT APPLIED THERMOPLASTIC COMPOUND WITH REFLECTORISING GLASS BEADS ON BITUMINOUS SURFACE Providing and Laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass breads as per IRC 35. The Finished surface to be level, uniform and free from streaks and holes etc complete as per MORTH specification No :803 km 0/0-4/0
Construction of 1.5m span slab culvert at ch 1800 m Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.Clause 305.1
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Clause 802, 803, 1202 & 1203
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Below sill level
Above sill level
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Clause 802, 803, 1202 & 1203
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Clause 802, 803, 1202 & 1203
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.Clause 802, 803, 1202 & 1203
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contactor.Clauses 1002, 1005, 1010 & 1202
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.Clause 1204.3.8
Providing and fixing 20mm thick Bitumen pad in expansion joint Between Dirt wall & Deck slab
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenance I year
Maintenance II year
Maintenance III year
Maintenance IV year
Maintenance V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PRASATH AND CO
maniandco
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .