Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-Finance | ₹2.9 Cr | L1 | Accepted-Finance Admitted |
| 2 | L2₹2.9 Cr+₹6.1 L (2.11%)Accepted-Finance 283 PAPPARAPATTI VILLAGE POST PANNANDUR VIA POCHAMPALLI TALUK KRISHNAGIRI DISTRICT | ₹2.9 Cr+₹6.1 L (2.11%) | L2 | Accepted-Finance Admitted |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
12 Jun 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri District PMGSY III 2019 20 Batch I Upgradation and 5 Year Maintenance of the 1Road in Veppanapalli Block Package No. TN 29- 111
2020_RDTN_92369_1
TN29111
Open Tender
Civil Works - Roads
Piece-work
270 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5.8 L
DRDA Krishnagiri
29 Jun 2020
13 May 2020
12 Jun 2020
13 May 2020
12 Jun 2020
13 May 2020
5 Jun 2020
Amount
Improvements to the road from MRL03-NH7 to Kundharapalli Veppanapalli road (via) Billanakuppam, Pachiganapalli, Pethampatti, B.Kothur km 0/0-3/390
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, sprading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause 301.5 (Carted Earth)
Granular sub-base/surface course with local materials(Table 400.13) by mix in place method normal Construction of granular sub base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per Technical Specification Clause 408
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (Grading II)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Grading III)
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Providing laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 for CC Road Ch 2510-2690m
Construction of CC Pavement
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC Grade M10
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of caorse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in appropriate weigh batcher using approved mix design, laid in approved fixed side formwork(steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing),spreading the concrete with shoovels, rakes, compacted using needle, screed and plate vibrators and finsihed in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, selant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound(where specified) and water finishing to lines and grade as per drawing and technical specification
Providing and fiing of Logo Board as per Standard Drawings
Reinforced cement concrete M15 Grade Kilometre Stone/Local Stone Standard design As per IRC 8 fixing in position including painting
Reinforced cement concrete M15 Grade Hecta metre Stone/Local Stone Standard design As per IRC 8 fixing in position including painting
Providing and fixing of Cautionary sign board as per standarded Drawings
90cm Equilateral triangle cautionary sign board
Reflector
Bus stop 60 x 45 cm
Providing and fixing of citizen information board
Providing and fixing of Name information board
Providing and fixing of Maintenance board
Cross Drainage Works 1.5m Span @ ch 9m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 90m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 278m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 419m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 447m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 758m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 816m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 2m Span @ ch 1171m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and laying Kraft Paer barring between deck slab and bed block to the full width of seating
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 1234m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 1360m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 1516m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 1883m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 3m Span @ ch 1440m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and laying Kraft Paer barring between deck slab and bed block to the full width of seating
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 2062m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 2126m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 2305m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 1.5m Span @ ch 2360m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Cross Drainage Works 3m Span @ ch 3195m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Below sill
Above Sill
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Super structrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and laying Kraft Paer barring between deck slab and bed block to the full width of seating
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Construction of Drain @ ch 1760-1880m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Construction of Protective works @ ch 1140-1150 (L/s), 1320-1330m (L/s), 1336-1440 (L/s)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of Protective works @ ch 2780-2830m (L/s), 2860-2900m (R/s)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:5:5
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Sub Structure Nominal mix 1:2:4
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch90
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch278
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch758
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch1234
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch1360
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch 1440
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch 2062
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch 2126
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch2305
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch 3195
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Cut Stone / RCC Culvert over RR Masonry @ch 1171
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removal of cut stone slabs & RCC Slabs for cut stone / RCC Slab
Dismantling of Existing Pipe Culvert @ch 9
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and dismantling of masonry works as per Technical Specification clause 202
Dismantling of Existing Pipe Culvert @ch 419
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and dismantling of masonry works as per Technical Specification clause 202
Dismantling of Existing Pipe Culvert @ch 447
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and dismantling of masonry works as per Technical Specification clause 202
Dismantling of Existing Pipe Culvert @ch 1516
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and dismantling of masonry works as per Technical Specification clause 202
Dismantling of Existing Pipe Culvert @ch 1883
Dismantling of Brick / Stone Masonry in Cement mortar walls under 3m High
Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and dismantling of masonry works as per Technical Specification clause 202
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SPS Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .