| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.7 L+₹526.90 (0.07%)Admitted-Fee/PreQual/Technical/Finance NO 1 208 NEW COLONY PASAR VILLAGE TITTAGUDI TALUK CUDDALORE DISTRICT 606304 | CUDDALORE | CUDDALORE | TAMIL NADU | 606304 | ₹7.7 L+₹526.90 (0.07%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | T.SELVAM SELVAMANI CONSTRUCTIONS L1 | Alagamuthu & co L2 |
|---|---|---|---|---|---|
| 1.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers | 0.5 | m3 | 5,599 ₹2,799.5 Lowest | 5,600 ₹2,800 |
| 2.00 | Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 1.5 | M3 | 7,486 ₹11,229 Lowest | 7,486 ₹11,229 Lowest |
| 3.00 | Manufacturing, supplying and fixing in position of RCC Jally of 5cm thick in cement concrete 1:2:4 using 20mm machine crushed stone jelly (excluding cost of reinforcement steel) including cost of mould, finishing, curing, lifting, fixing in position etc., complete complying with standard specification and as directed by the departmental officers. | 3.78 | M2 | 1,338 ₹5,057.64 Lowest | 1,338 ₹5,057.64 Lowest |
| 4.00 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 117 | Kg | 107.8 ₹12,612.6 Lowest | 108 ₹12,636 |
| 5.00 | Manufacturing supplying and fixing of Fully Panelled steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames, stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter. 3nos. of Steel Parliament Hinges of Size 125mm x 150mm in case of single leaf and 6nos. of Steel Parliament Hinges of Size 125mm x 150mm in double leaves shutter to be provided. 6nos. of holdfasts 200 mm in length made of angle section spliced at the ends are welded to the outer frames of the door. Tower bolts 3 nos, one at the top, one at lock rail(Inner) and the other at the bottom are provided 1no. Aldrop is provided at lock rail section in the door 2 Nos of 200mm handle are to be provided. One rotaing locking arrangements for the inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter t conceal the gap between the two shutters. at an appropriate place in the door. A tie bar is provided at the bottom of the frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of work, loading, un loading and all other incidental charges etc., complete complying with standard specification and as directed by the departmental officers | 21 | Kg | 5,549 ₹1,16,529 Lowest | 5,549 ₹1,16,529 Lowest |
| 6.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 371 | m2 | 289 ₹1,07,219 Lowest | 290 ₹1,07,590 |
| 7.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 66 | m2 | 331 ₹21,846 Lowest | 333 ₹21,978 |
| 8.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 220 | m2 | 39.75 ₹8,745 Lowest | 39.75 ₹8,745 Lowest |
| 9.00 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 1,150 | m2 | 275.4 ₹3,16,710 Lowest | 275.4 ₹3,16,710 Lowest |
| 10.00 | Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 106 | m2 | 148 ₹15,688 Lowest | 148 ₹15,688 Lowest |
Tender Value
₹9.2 L
EMD Value
₹9,200
Closing Date
17 Sept 2026, 3:00 pmClosed
COMMISSIONER VIRUDHACHALAM
VIRUDHACHALAM MUNICIPALITY
Repair and Maintenance to Toilet at Ward No.05 Bus Stand in Virudhachalam Municipality
2026_MAWS_699112_1
3815/2026/E1-1
Open Tender
Civil Works
Works
60 days
WORKS
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,200
Yes
17 Sept 2026
29 Aug 2026
17 Sept 2026
29 Aug 2026
17 Sept 2026
29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers | 0.5 | m3 | - | - |
| 2 | Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 1.5 | M3 | - | - |
| 3 | Manufacturing, supplying and fixing in position of RCC Jally of 5cm thick in cement concrete 1:2:4 using 20mm machine crushed stone jelly (excluding cost of reinforcement steel) including cost of mould, finishing, curing, lifting, fixing in position etc., complete complying with standard specification and as directed by the departmental officers. | 3.78 | M2 | - | - |
| 4 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 117 | Kg | - | - |
| 5 | Manufacturing supplying and fixing of Fully Panelled steel door with the following specification MS angels of size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames, stiffeners with 32 x 6mm M.S flat is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact. M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter. 3nos. of Steel Parliament Hinges of Size 125mm x 150mm in case of single leaf and 6nos. of Steel Parliament Hinges of Size 125mm x 150mm in double leaves shutter to be provided. 6nos. of holdfasts 200 mm in length made of angle section spliced at the ends are welded to the outer frames of the door. Tower bolts 3 nos, one at the top, one at lock rail(Inner) and the other at the bottom are provided 1no. Aldrop is provided at lock rail section in the door 2 Nos of 200mm handle are to be provided. One rotaing locking arrangements for the inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter t conceal the gap between the two shutters. at an appropriate place in the door. A tie bar is provided at the bottom of the frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of work, loading, un loading and all other incidental charges etc., complete complying with standard specification and as directed by the departmental officers | 21 | Kg | - | - |
| 6 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 371 | m2 | - | - |
| 7 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 66 | m2 | - | - |
| 8 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 220 | m2 | - | - |
| 9 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 1,150 | m2 | - | - |
| 10 | Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 106 | m2 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_840428.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .