Tender ID
Tender Value
₹1.8 Cr
EMD Value
₹2.1 L
Closing Date
17 Apr 2026, 6:00 pmClosed
EE HPSAMB
EE HPSAMB
Construction of roofing work between the Apmc office building and sabzi mandi shops complex building at APMC Solan, Distt. Solan H.P.
2026_HPAMB_133948_1
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Percentage
120 days
Solan
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹2.1 L
6 Jun 2026
10 Apr 2026
18 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | - | cu.m. | - | - |
| 2 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work in foundation footings, basis of columns etcetera and mass concrete, including carriage of materials. Within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | - | sq.m. | - | - |
| 3 | Providing form work with steel plates 3.15mm(three point
one five millimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finish including centering ,shuttering, strutting and propping etcetera with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in vertical surfaces such as walls(any thickness) partitions etc. including attached pillasters buttresses, plinth and string cources and the like etc. as per HP.PWD. Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government | - | sq.m. | - | - |
| 4 | Providing form work with steel plates 3.15mm(three point
one five millimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finish including centering ,shuttering, strutting and propping etcetera with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in Beams, cantilevers, girders and lintels, sides of soffits of beams, beams haunchings, girders, cantilevers, bressumers and lintels upto any depth /heights upto all floor level as per HP.PWD. Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government | - | sq.m. | - | - |
| 5 | Providing form work with steel plates 3.15mm(three point
one five millimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finish including centering ,shuttering, strutting and propping etcetera with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in Columns, pillars post and struts (square rectangular or polygonal in plain in any heights / thickness/depths etcetera upto all foor level as per HP.PWD. Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government | - | sq.m. | - | - |
| 6 | Providing and laying mechanically mixed and vibrated cement concrete 1:3:6 (one cement isto three sand isto six graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | - | cu.m. | - | - |
| 7 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in all works upto plinth level complete as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals.The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | - | cu.m. | - | - |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in all works above plinth level upto floor V level complete as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals.The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | - | cu.m. | - | - |
| 9 | Providing and laying Tor steel reinforcement of TATA, sail , Rashtriya Ispat or its substantial equivalent make for Reinforced Cement Concrete work including bending, binding and placing in position complete including cost of binding wire and other incidentals due for its completion up to all floor level complete as per HPPWD specifications or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | - | kg | - | - |
| 10 | Stone soling properely hand packed filling interstics with spalls and consolidating with manually roller to the requested gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100mm spread thickness (finished work including materials and labour). including carriage of materials in all leads and lifts. | - | cu.m. | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
SBD_1_Roofing_Solan.pdf
Tender Documents • 7.08 MB
BOQ_198036.xls
BOQ • 0.38 MB
extension_Solan.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .