Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.3 LAdmitted-Fee/PreQual/Technical/Finance TAMIL NADU TAMIL NADU TAMIL NADU | COIMBATORE | TAMIL NADU | 638459 | -21.50% | ₹27.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹27.8 L+₹48,701.36 (1.78%)Admitted-Fee/PreQual/Technical/Finance AMBEDKAR 3RD CROSS STREET ANNA SALAI ANNA SALAI 1ST CROSS STREET AMBED | ERODE | TAMIL NADU | 638001 | -20.10% | ₹27.8 L+₹48,701.36 (1.78%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹28.2 L+₹90,793.25 (3.32%)Admitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | -18.89% | ₹28.2 L+₹90,793.25 (3.32%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹29.6 L+₹2.3 L (8.29%)Admitted-Fee/PreQual/Technical/Finance SUBRAMANIAN NAGAR 1ST STREET SUBRAMANIAN NA | TIRUVANNAMALAI | TAMIL NADU | 604407 | -14.99% | ₹29.6 L+₹2.3 L (8.29%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹29.6 L+₹2.3 L (8.29%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹29.6 L+₹2.3 L (8.29%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹34.8 L
EMD Value
₹34,800
Closing Date
2 Jul 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E2/3668/2026 IMPROVEMENTS AND MINOR REPAIR WORK OF STORM WATER AND SIDE DRAIN AT VARIOUS STREET IN DIVISION-191, UNIT-43, ZONE-14.
2026_CoC_682910_1
Z.O.XIV.C.NO.E2/3668/2026
Open Tender
Civil Works
Works
90 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹34,800
3 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
2 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of RCC Slab (reinforcement is being co...torm Water Drain - Steel is declared unfit for use | 12.06 | CUM | 2,220.9 | ₹26,784.05 |
| 2 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).BEAM | 131.4 | SQM | 1,267.76 | ₹1,66,583.66 |
| 3 | Providing And Laying. In Position, Standardised Co...The Department For The Excess Usage of Materials). | 19.71 | CUM | 9,539.34 | ₹1,88,020.39 |
| 4 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 1,773.9 | KGS | 98.7 | ₹1,75,083.93 |
| 5 | Supplying and fixing of 24” SFRC Gully Gratings of...ll be painted with anti corrosive bitumastic paint | 180 | EACH | 6,305.4 | ₹11,34,972 |
| 6 | Construction of cast -in- situ Silt Catch Pit of i... the finishing work etc., cost per each number. | 121 | EACH | 14,770.45 | ₹17,87,224.45 |
stage.html
html • 0.03 MB
finance_820947.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
3668.pdf
Tender Documents • 1.70 MB
BOQ_820947.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .