| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.5 CrAccepted-AOC | ₹69.5 Cr Quoted ₹73.2 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 695242017.38 Only |
| 2 | L2₹73.9 CrRejected-Finance | ₹73.9 Cr | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹74.2 CrRejected-Finance FLAT NO 5 IIND FLOOR IIIRD B 2 NEHRU NAGAR GHAZIABAD UP 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹74.2 Cr | L3 | Rejected-Finance Rejected due to higher Rates |
| Sl No | Description | Qty | Unit | M/S R P INFRAVENTURE PRIVATE LIMITED L1 | M/S SOBTI INFRATECH LIMITED L2 | JSP PROJECTS PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 62,630 | Sqm. | 2 ₹1.3 L | 2.5 ₹1.6 L | 2 ₹1.3 L |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 16,300 | Cum. | 50 ₹8.2 L | 55 ₹9.0 L | 50 ₹8.2 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 3,21,300 | Cum. | 200 ₹6.4 Cr | 205 ₹6.6 Cr | 201 ₹6.5 Cr |
| 4.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 28,545 | Cum. | 100 ₹28.5 L | 110 ₹31.4 L | 100.5 ₹28.7 L |
| 5.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 69,630 | Cum. | 200 ₹1.4 Cr | 200 ₹1.4 Cr | 201 ₹1.4 Cr |
| 6.00 | Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MoRT&H clause 401(b).(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 24,955 | Cum. | 2,000 ₹5.0 Cr | 2,100 ₹5.2 Cr | 2,100 ₹5.2 Cr |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 29,645 | Cum. | 2,285 ₹6.8 Cr | 2,200 ₹6.5 Cr | 2,430 ₹7.2 Cr |
| 8.00 | Providing and applying primer coat with SS-1bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 75,165 | Sqm | 26 ₹19.5 L | 24 ₹18.0 L | 26.13 ₹19.6 L |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with Machenical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. Grading-II (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 5,095 | Cum. | 8,000 ₹4.1 Cr | 9,500 ₹4.8 Cr | 8,040 ₹4.1 Cr |
| 10.00 | Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 1,10,585 | Sqm | 12 ₹13.3 L | 10 ₹11.1 L | 12.06 ₹13.3 L |
Tender Value
₹74.7 Cr
EMD Value
₹75 L
Closing Date
16 Jan 2026, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and strengthening of two lane service road of Inner Ring Road to 4 lane road and construction of approach road and rotary for Integrated Manufacturing Cluster (IMC) in Agra district
2026_CEAGR_1104734_1
6046/14M-AC/2025-26 dated 20-12-2025
Open Tender
Civil Works
450 days
Agra
Widening and strengthening
2 documents required · 2 mandatory
₹2,360
₹75 L
Agra
4 Feb 2026
9 Jan 2026
16 Jan 2026
9 Jan 2026
16 Jan 2026
9 Jan 2026
12 Jan 2026
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MoRT&H clause 401(b).(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and applying primer coat with SS-1bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with Machenical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. Grading-II (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying Bituminous Concrete with batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG-30) @ 5.4 % of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with Machenical Control to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 509 complete all respects. Grading-II (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. (For toll Both Section)
Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design not less then M40 grade concrete, transported to site, laid with a fixed form or slip form paver, pread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing (For toll Both Section)
Construction of RCC Retaining wall, Box culvert and Drain Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Plain Cement Concrete (M-15) in Open Foundation complete as per Drawing and Technical Specifications.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Plain Cement Concrete (M-20) in sub-structure complete as per drawing and Technical Specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Reinforced Cement Concrete (M-20) in sub-structure complete as per drawing and Technical Specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Reinforced Cement Concrete (M-25) in sub-structure complete as per drawing and Technical Specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Furnishing and Placing Reinforced/ Prestressed cement concrete (M25) in super-structure as per drawing and Technical Specification (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth and above level.Thermo-Mechanically Treated bars of grade Fe-500D or more as pers DSR 5.22.6 etc.complete as per Drawing and Technical Specifications. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical Specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Drainage spouts as per drawing & Technical Specification, as per MORT&H specification 2705 as per SOR Ch.6 S.No.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. as per morth 2504.2(13.010) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concert bedding. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of RE wall Construction of embankment with Flyash conforming to table 1 of IRC: SP: 58 obtained from coal or lignite burning thermal power stations as waste material, spread and compacted in layers at OMC, all as specified in IRC: SP: 58 and as per approved plans.(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Construction of sub surface drain 200 mm dia using geotextiles treated with carbon black with physical properties as given in clause 702.2.3 formed in to a stable network and a planar geocomposite structure, joints wrapped with geotextile to prevent ingress of soil, all as per clause 702 and approved drawings including excavation and backfilling (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Facing elements of RCC Reinforced Earth Retaining Wall (Reinforced earth retaining walls Pre-cast RCC M-35 facing elements of size as per design and 18 cm thick for 75 sqm. Reinforce not less then HYSD steel @ 7 kg / sqm (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain etc. complete and as directed by Engineer - In - Charge. 150 kM (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with minimum Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius corresponding to 12 % strain etc. complete and as directed by Engineer - In - Charge. 200 kM (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Reinforced cement concrete M35 in sub-structure complete as per drawing and Technical Specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Furnishing and Placing Reinforced/ Prestressed cement concrete (M35) in super-structure as per drawing and Technical Specification (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying Filter material with graded stone aggregate underneath pitching in slopes complete as per drawing and Technical specification as per Morth 2504(16.05) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Cast in Situ Cement Concrete M 20 Kerb with Channel Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per Morth 1300 & 2200 (13.10) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Supply & Laying of I shaped precast lnterlocking tiles of thickness 80 mm (Rubber molded Coloured) (Compressive strength not less then 30Mpa and weight 4.50k9) lncluding 0.30mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. as per SOR Ch. 5 No. 17 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M30 Reinforced Cement Concrete with HYSD reinforcement conforming to conforming MoRT&H Specification and as per details given IRC -5 (Fig.-5, b) including dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc.., as per approved drawing and at locations directed by the Engineer, all as specified. (Area-0.243 Sqm. /Meter, Single Face) (For toll Both Section)
Part-B Maintainance Charge including @ All Items as per Direction of E/I for the period of Five Years from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Part-B Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 42)
Part-B Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 42)
Part-B Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 42)
Part-B Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 42)
Part-B Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 42)
M/S SOBTI INFRATECH LIMITED (BID ID -5805788)
JSP PROJECTS PVT LTD (BID ID -5806547)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_2038591.xls
BOQ • 0.33 MB
SBDAddendumIMCRING.pdf
Tender Documents • 2.52 MB
SBD_IMCRINGROAD.pdf
Tender Documents • 2.72 MB
Download all tender documents and submit your bid