| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance | -6.28% | ₹16.1 L | L1 | Admitted-Finance |
| 2 | L2₹16.1 LAdmitted-Finance | -6.27% | ₹16.1 L | L2 | Admitted-Finance |
| 3 | L3₹16.1 LAdmitted-Finance | -6.26% | ₹16.1 L | L3 | Admitted-Finance |
| 4 | L4₹19.1 LAdmitted-Finance BARMER | RAJASTHAN | 344001 | +11.11% | ₹19.1 L | L4 | Admitted-Finance |
Tender Value
₹17.2 L
EMD Value
₹34,400
Closing Date
14 May 2026, 6:00 pmClosed
EXECUTIVE ENGINEER PWD DN BANSWARA
EXECUTIVE ENGINEER PWD DN BANSWARA
Rate Contract for BT Patch Repair and Maintenance Works on various Roads in PWD City Sub Dn. Banswara.
2026_CEPWD_557918_1
NIT 02/2026-27 EE PWD DN BANSWARA
Open Tender
Civil Works
BANSWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
AS MENTIONED IN NIT AND CONDITIONS
₹34,400
Yes
25 May 2026
9 May 2026
15 May 2026
9 May 2026
14 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means
In area of non-thorny jungle | 1 | Hec. | 10,374 | ₹10,374 |
| 2 | Maintenance of Earhen shoulder (stripping of excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and MoRTH Specification Clause 3003 | 2,800 | Sqm | 7 | ₹19,600 |
| 3 | Maintenance of Earthen shoulder (filling with fresh selected soil)
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRTH specification Clause 3003 | 2,200 | Sqm | 18 | ₹39,600 |
| 4 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002. (B) Mechanical Means | 750 | Cum | 93 | ₹69,750 |
| 5 | By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | 150 | Cum | 407 | ₹61,050 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Manual Means | 236.5 | Cum | 1,109 | ₹2,62,278.5 |
| 7 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat with bitumen emulsion, 20 mm thick pre-mix carpet using catonic bitumen emulsion and seal coat type B with bitumen emulsion as per MoRTH specification Clause 3004.2 | 6,000 | Sqm | 196 | ₹11,76,000 |
| 8 | Maintenance of Road Furnitures Painting two coats with superior grade synthetic enamel paint of approved quality to give an even shade including writing lettering and figures with synthetic enamel paint as per IRC specifications.Traffic Sign Boards (cautionery, mandatory & informatory) | 15 | Each | 147 | ₹2,205 |
| 9 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. | 56 | Sqm | 424 | ₹23,744 |
| 10 | Maintenance of Road Furnitures Painting two coats with superior grade synthetic enamel paint of approved quality to give an even shade including writing lettering and figures with synthetic enamel paint as per IRC specifications.Direction & Place Identification sign boards including painting of posts. | 28 | Each | 258 | ₹7,224 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 14.23 MB
BOQ_993258.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid