Tender Value
₹1.5 Cr
EMD Value
₹3.6 L
Closing Date
28 Jul 2026, 5:00 pm
GM-(CIVIL)
Main Administrative Building Sector-6 Noida
O/M of Sewer line and MSPS/SPS at Expressway (Renovation of Panel/DG set building, boundary wall Internal road along with raising of level of MSPS-1 Campus at Sec.136) Noida)
2026_NOIDA_1169086_1
16/SM(JAL-OA)/26-27
Open Tender
Civil Works - Others
Fixed-rate
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.6 L
15 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 65.69 | Cum | 779.76 | ₹51,222.43 |
| 2 | Demolishing mud phaska in terracing and disposal of material within 50 meters lead. | 20.8 | Cum | 345.99 | ₹7,196.59 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 213.11 | Cum | 1,347.16 | ₹2,87,093.27 |
| 4 | Extra for cutting reinforement bars manually/ by mechanical means in RCC or RB work (payment shall be made on the cross sectional area of RCC Or RB work) as per direction of E/I | 18.67 | Sqm | 469.57 | ₹8,766.87 |
| 5 | Dismantling door, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :of area 3 Sq metres and below | 5 | Each | 144.97 | ₹724.85 |
| 6 | Dismantling door, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :of area beyond 3 Sq metres. | 9 | Each | 199.21 | ₹1,792.89 |
| 7 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of E/I | 365.4 | Kg. | 1.45 | ₹529.83 |
| 8 | Dismantling barbed wire or flexible wire rope in fencing including making rools and stacking within 50 metres lead. | 88.22 | Kg. | 13.95 | ₹1,230.67 |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kings of soil. | 24.6 | Cum | 144.93 | ₹3,565.28 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 24.6 | Cum | 93 | ₹2,287.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
TD.pdf
Tender Documents • 2.49 MB
C.xls
Additional Documents • 0.05 MB
BOQ_2193803.xls
BOQ • 0.35 MB