Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | ₹5.1 L | 1 | Accepted-AOC L1 BIDDER |
| 2 | 2₹5.2 L+₹10,400 (2.04%)Rejected-AOC | ₹5.2 L+₹10,400 (2.04%) | 2 | Rejected-AOC NOT L1 BIDDER |
| 3 | 3₹5.8 L+₹73,476 (14.4%)Rejected-AOC | ₹5.8 L+₹73,476 (14.4%) | 3 | Rejected-AOC NOT L1 BIDDER |
| 4 | 4₹7.0 L+₹1.9 L (36.5%)Rejected-AOC | ₹7.0 L+₹1.9 L (36.5%) | 4 | Rejected-AOC NOT L1 BIDDER |
| 5 | 5₹7.0 L+₹1.9 L (37.0%)Rejected-AOC | ₹7.0 L+₹1.9 L (37.0%) | 5 | Rejected-AOC NOT L1 BIDDER |
Tender Value
₹6.5 L
EMD Value
₹6,517
Closing Date
19 Aug 2019, 3:00 pmClosed
GGM(HW)
ROC -I Plot No 1 Sector 29 Gurugram
Pavement Structural Evaluation using Falling Weight Deflectometer for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and Feeder Routes to improve the efficiency of Freight Movement in India
2019_RITES_29875_1
RITES/HWD/NHAI/RT300-00035
Limited
Survey
Works
60 days
RITES Ltd
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,517
Yes
7 Feb 2024
5 Aug 2019
20 Aug 2019
7 Aug 2019
19 Aug 2019
7 Aug 2019
Amount
Pavement structural strength evaluation using Falling Weight Deflectometer (FWD) as per TOR
P. K. Engineers
Sri Infotech
M/s Highway Engineering Magnitude Consortium
Translink Infrastructure Consultants Pvt. Ltd.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .