Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Finance | -20.00% | ₹9.1 L | L1 | Admitted-Finance |
| 2 | L2₹10.3 L+₹1.2 L (13.1%)Admitted-Finance H NO 243 TILAMOL QUEPEM GOA | QUEPEM | GOA | -9.55% | ₹10.3 L+₹1.2 L (13.1%) | L2 | Admitted-Finance |
Tender Value
₹11.4 L
EMD Value
₹22,795
Closing Date
21 Aug 2026, 3:00 pmClosed
Executive Engineer
WD VI DDW Margao Goa
Urgent strengthening to existing 400mm DI Pipeline network near Tilamol circle and surrounding area of Curchorem constituency.
2026_DDW_31074_1
DDW/WD-VI/TN/2026-27/10 line 02
Open Tender
Civil Works - Water Works
Percentage
90 days
WD VI DDW Margao Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹22,795
11 Sept 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in over areas in saturated soil upto a depth of 0.6m including pumping and bailing out water and disposing of excavated soil lead upto 20 m and lift upto 1.5 m. Extra for earthwork in excavation in saturated soil for every 0.3m or part thereof over .60 m depth including pumping or bailing out water. | 181.44 | Cu. M | 1,298 | ₹2,35,509.12 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 30.24 | Cu. M | 2,211 | ₹66,860.64 |
| 3Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | All works upto plinth level | 10.08 | Cu.m | 6,192 | ₹62,415.36 |
| 4Centering and shuttering including struttings, propping etc. and removal of formwork for : | |||||
| 4.01 | Foundations, footings, bases for columns and mass concrete. | 302.04 | Sq. M | 407 | ₹1,22,930.28 |
| 5Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | |||||
| 5.01 | All works upto plinth level | 98.27 | Cu.m | 6,635 | ₹6,52,021.45 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.06 MB
Tendernotice_3.pdf
PDF • 0.63 MB
Tendernotice_4.pdf
PDF • 0.68 MB
BOQ_31472.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .