Loading…
Loading…
Tender Value
₹59.0 L
EMD Value
₹1.2 L
Closing Date
17 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
GSUBKN
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIII, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or(iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Similar nature of work:- Any work involving supply, Installation testing & commissioning of IP based Video Surveillance system. OR Any work involving provision of IP-MPLS/VoIP based System/Data Comm Equipment/video conferencing system including installation & commissioning of switches/routers.
Note: A work experience certificate from aprivate individual shall not be considered.However, in addition to work experiencecertificates issued by any Govt. Organization,work experience certificate issued by Publiclisted company having average annualturnover of Rs 500 crore and above in last 3financial years excluding the current financialyear, listed on National Stock Exchange orBombay Stock Exchange,incorporated/registered at least 5 years priorto the date of closing of tender, shall also beconsidered provided the work experiencecertificate has been issued by a personauthorized by the Public listed company toissue such certificates. In case tenderersubmits work experience certificate issued bypublic listed company, the tenderer shall alsosubmit along with work experience certificate,the relevant copy of work order, bill ofquantities, bill wise details of paymentreceived duly certified by CharteredAccountant, TDS certificates for all paymentsreceived and copy of final/last bill paid bycompany in support of above work experiencecertificate. As per Clause No. 10.1 of TenderForm (second Sheet) of Annex.I of Part-I ofGCC2022, with up to date correction slip
6 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
If the bidder fails to submit copy of audited balance sheet alongwith the offer then contractual turnover of that year will be treated as NIL
Augmentation of facilities of Good Shed along with the provision of CCTV at Kolayat station of Bikaner Division.
SNT-GS-BKN-2025-26-04R1
SNT-GS-BKN-2025-26-04R1
Open
Works - General
6 Months
Bikaner, Rajasthan
₹0
₹1.2 L
17 Apr 2026
25 Mar 2026
3 Apr 2026
27 items across 3 schedules · ₹14,40,298.01 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| direction drilling/boring without of surface road /track using Auger machine). The bore shall be mm dia & shall be done at the minimum 1200 mm from the ground ground level shall be considered the bank height of the bank of the length of the bore shall be 4 Mtrs long. This include insertion dia DWC-HDPE pipe/ GI pipes etc. as per direction of Engineer In Note:- Pipe Supply is not covered item. Contactor shall provide all required for boring and adequate labours for proper laying of cables bore. Cable shall be laid cautiously it should not get damage due to handling & pressure on cable. Consignee Inspection Charges: Payment Terms: 100% after Execution. | Metre | 150.00 | 1,202.97 | 1,80,445.5 | |
| 2 | Drilling by using manual pushing at minimum depth of 1.5 meter formation level of earth as per of Engineer in charge .Pipe Supply is under this item Inspection: Inspection Charges: None. Terms: 100% after Execution | Metre | 50.00 | 122.74 | 6,137 |
| 3 | galvanized cable markers as per Drg.No.CSTE/NWR/SOR/15. Inspection: Inspection Charges: None. Terms: 100% after Supply. | Numbers | 30.00 | 241.28 | 7,238.4 |
| 4 | at site and Fixing of cable markers as per Drg.No.CSTE/NWR/SOR/15. Inspection: Inspection Charges: None. Terms: 100% after Execution | Numbers | 30.00 | 60.32 | 1,809.6 |
| 5 | of cable trench as per cable route Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. bottom as per RDSO sketch No. LAYING/003 or latest alongside in normal (all type) soil/strata, to distances as per cable route refilling. This work includes clearing from bushes etc, covering of cable trench by loose soil for a layer of thickness approximately before by bricks. The work shall be done as extant practice on North Western and instructions of Railway Engineer case 1.2m depth of trench is not due to site conditions, specific of JA grade officer will be required site where trench depth of 1.2m is Without the approval of JA officer, no payment for trenching will for trench depth less than 1.2m. Consignee Inspection Charges: Payment Terms: 100% after Execution( Cubic Meter) | cum | 500.00 | 274.28 | 1,37,140 |
| 6 | of cable trench 0.3 Mtrs. Deep and Wide on Asphalted Platform / Road / area. Refilling with earth leveling & restoring the original surface of sharp edges will be out in bottom of the chase and leveled properly. In hard rocky ground cables will be laid normally on layer of earth of 0.05 mtrs thickness deposited at bottom of the trench will be covered with layer of sand earth of 0.1 mtr thickness. In case edges of rocky ground can not be from shifted earth then GI/ CI /PVC HDPE pipes will be used, if numbers of small.In case number of cables are duct will be used. In isolated can be given smooth surface by either masonry bricks or cement A row of bricks shall then be placed wise on the top and jointed with mortar and layer of concrete with plaster shall be provided on top of Note: This item in hard rocky area operated only where normal depth is not possible and it will be by site engineer/unit officer incharge Inspection: Consignee Inspection None. Payment Terms: 100% after Unit is Cubic Meter) | cum | 100.00 | 503.04 | 50,304 |
| 7 | S&T Cables of various cores/ pairs/ trenches/ GI pipes/ RCC pipes/ DWC Trunking. This also includes laying of track crossings & road crossings. includes provision of labels of coloured adhesive tapes or any other material on each cable to give the number at each Gantry post.(Cables will be before and after its laying by under supervision of Railway and he will submit the report of each testing). Length of laid includes the length of the cable termination purposes. Inspection: Inspection Charges: None. Terms: 100% after Execution(unit is meter) | Metre | 1500.00 | 9.1 | 13,650 |
| Schedule total | ₹3,96,724.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Bidcapacitycertificate.pdf
ATTACHMENT
TelecomCircularNo09.pdf
ATTACHMENT
JPOforCableCut.pdf
ATTACHMENT
Contractore-MB.pdf
ATTACHMENT
GCC ACS 6 21.12.2023
ATTACHMENT
GCCACS81.pdf
ATTACHMENT
2022AdvanceCorrectionSlipNo_4ACS-
ATTACHMENT
GCCACS3.pdf
ATTACHMENT
GCCACS9.pdf
ATTACHMENT
acs5dt20-10-2023GCC.pdf
ATTACHMENT
GCCACS114.07.2022.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo_4ACS-4_1.pdf
ATTACHMENT
GCC2022AdvanceCorrectionSlipNo_6ACS-6.pdf
ATTACHMENT
GCCACS213.12.2022.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
GCC-2022-UPTOACS09.pdf
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
GCCACS112.pdf
ATTACHMENT
TenderDocument-SNT-GS-BKN-2025-26-04R1_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .