Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹5.1 L+₹1,028.06 (0.20%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹5.2 L+₹3,598.20 (0.70%)Rejected-AOC | L3 | Rejected-AOC L3 bidder |
Tender Value
Refer Docs
EMD Value
₹51,400
Closing Date
11 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Nagarpalika Parishad Noorpur
Construction of 03 Seater Public Toilet and 02 Urinal near Moradabad Road (01 Ladies, 01Gents and 01Disable Person/child)
2026_DOLBU_1200110_5
717/EO/2026-27
Open Tender
Civil Works
Percentage
Nagarpalika Parishad Noorpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
E.O.
₹51,400
23 Nov 2026
23 Oct 2026
12 Nov 2026
23 Oct 2026
11 Nov 2026
23 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (Where machine con not reach/move) For building work only,(Excluding royalty) | 16.99 | Cum | 200 | ₹3,398 |
| 2 | Cement Concrete with 4cm gauge approved Stone ballast coarse sand and cement in proporation of 1:4:8 inculuding supply of all materail labour and T&P etc.required for proper completion. | 2.76 | Cum | 6,850 | ₹18,906 |
| 3 | M-150 brick work in 1:3 with (one cement and six fine sand of 1.25 F.M mortar) in Superstructure i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work. | 7.99 | Cum | 5,310 | ₹42,426.9 |
| 4 | R.C.C lighter beam having spans upto 6M work and in colom with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | 0.91 | Cum | 8,445 | ₹7,684.95 |
| 5 | M-150 brick work in 1:3 with (one cement and six fine sand of 1.25 F.M mortar) in Superstructure i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work. | 10.41 | Cum | 5,310 | ₹55,277.1 |
| 6 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material ,labour and T&P etc.required for proper completion of work | 96.85 | Sqm | 215 | ₹20,822.75 |
| 7 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.50:3 in slab excluding supply of reinforcement. | 3 | Cum | 8,295 | ₹24,885 |
| 8 | Mild steel or iron in plain work such as concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work. | 3.07 | Qtl | 7,050 | ₹21,643.5 |
| 9 | Supply & fixing 6 to 8mm thick ivory or light shades vitrefied tiles 600x600 mm size in flooring and skirting with 1:3 approved cement and coarse sand mortar finished with in its cement colour slurry, jointing and polished of approved quality complete including supply of all materials labour tools and plants etc. | 15.6 | Sqm | 1,480 | ₹23,088 |
| 10 | Supply & fixing 6mm thick China glazed tiles of first quality at wall or skirtting with 1.3 cement coarse sand mortor with white cement slurry jointing and polishing including supply of all material,labour and T&P etc.required for proper completion of work | 82.89 | Sqm | 1,095 | ₹90,764.55 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2270042.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .