| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.4 L+₹19,708 (2.15%)Rejected-Finance NOT AVAILABLE | ₹9.4 L+₹19,708 (2.15%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.6 L+₹39,417 (4.30%)Rejected-Finance WARD 18 RAJPUR GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹9.6 L+₹39,417 (4.30%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical all requried not complete |
| 5 | Rejected-Technical | - | - | Rejected-Technical all requried not complete |
Tender Value
₹9.9 L
EMD Value
₹29,563
Closing Date
16 Feb 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Work of drain and CC from Modern Planner to Anil Kumar in Ward-59 Navyug Market.
2026_DOLBU_1113580_8
107/Nirman/2025-26 Date 16.01.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹29,563
22 Jun 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 2.76 | M3 | 4,000 | ₹11,025 |
| - | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) | 9.49 | M3 | 5,170 | ₹49,086.05 |
| - | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) | 83.91 | M2 | 200 | ₹16,782 |
| 4 | S/S of 22.4 to 53mm gauge stone ballast with stacking for measurment etc. all complete as per the direction of Engineer in charge (AS PER PWD SOR 2020 RMR) | 50.39 | M3 | 2,151.2 | ₹1,08,389.42 |
| - | Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR | 9.07 | M3 | 2,050.2 | ₹18,594.09 |
| - | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405 | 50.39 | M3 | 690 | ₹34,766.04 |
| - | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause
1501. | 73.83 | M3 | 8,050 | ₹5,94,291.25 |
| - | Cement Concrete with 2 cm. gauge stone grit instead of 4 cm. gauge stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work. | 0.31 | M3 | 7,050 | ₹2,172.81 |
| - | GST | 18 | Percentage | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2062287.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .