Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.8 LAccepted-Finance 804 2 P BLOCK KAKADEV KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.8 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹9.8 L+₹883.88 (0.09%)Rejected-Finance | ₹9.8 L+₹883.88 (0.09%) | L-2 | Rejected-Finance L_2 |
Tender Value
₹9.8 L
EMD Value
₹98,209
Closing Date
20 May 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Improvement of road by HMP from Chitranshi chauraha to Motilal khediya school and Vima chauraha to Samarpan clinic in Vishnupuri ward-40 under zone-6.
2026_NNKAN_1129986_2
884/AA-6/2025-26
Open Tender
Civil Works
Percentage
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,209
26 May 2026
16 May 2026
20 May 2026
16 May 2026
20 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete | 12.6 | cum | 3,671 | ₹46,254.6 |
| 2 | Prov./applying tack coat with bitumen using at the rate of 0.30 kg per sqm as phalt before B.M.& S.D.C.layer including etc.all complete. | 1,890 | sqm | 18 | ₹34,020 |
| 3 | Dense Graded Bituminous Macadam (DGBM) (average) bituminour macadam with 60-90 THP batch type HMP type hot mix plant producing an average output of 75 tonnes per hour crushed aggregate of specified grading permixed with bituminour binder@ 4.5 per cent of mix and filler transporting the mix paver finisher etc. all complete work. | 24.84 | mt | 4,940 | ₹1,22,709.6 |
| 4 | Prov./laying bitumious concrete (BC) 25 mm thick (average) with computrised HMP type hot mix plant producing an average output of 75 tonnes per hour crushed aggregates of specified grading permixed with bitumenour binder (CRMB) @ 5.4 per cent of mix and filler transporting the mix with paver finisher etc.all complete work. | 114.21 | mt | 5,510 | ₹6,29,297.1 |
| 5 | TAX18% | 1 | TaX | 1,49,810.77 | ₹1,49,810.77 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.08 MB
BOQ_2151993.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .