| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 25 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD SOUTH DELHI DELHI 110044 | SOUTH EAST DELHI | DELHI | 110044 | Admitted-Finance |
| 2 | Rejected-Technical C 59 GAUTAM BUDH NAGAR PHASE II SECTOR 80 GAUTAM BUDDHA NAGAR UTTAR PRADESH 201305 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201305 | Rejected-Technical TECHNICALLY NOT ACCEPTABLE |
| 3 | Rejected-Technical PLOT NO 1080 BIRLA AURORA LEVEL 21 DR ANNIE BESANT ROAD WORLI MUMBAI MAHARASHTRA 400030 | MUMBAI | MAHARASHTRA | 400030 | Rejected-Technical TECHNICALLY NOT ACCEPTABLE |
Tender Value
Refer Docs
EMD Value
₹25.5 L
Closing Date
5 May 2023, 3:00 pmClosed
BALAKRISHNAN RANGARAJU
TECHNIP ENERGIES INDIA LTD, CHENNAI
SUPPLY OF MV SWITCHGEAR (DRAWOUT TYPE)FOR NUMALIGARH REFINERY EXPANSION PROJECT
2023_NRL_739706_1
TP/082176C/NRL/PQ/100
Open Tender
Electrical Goods/Equipment
330 days
NUMALIGARH
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹25.5 L
Yes
4 Oct 2023
9 Feb 2023
6 May 2023
9 Feb 2023
5 May 2023
7 Mar 2023
MV SWITCHGEAR 415V, 1000 A, 50kA (1 Sec) NREP MAIN SUBSTATION (SS#10): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 1000A, 50kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 50kA (1 Sec) NREP MAIN SUBSTATION (SS#10): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 50kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 50kA(1 Sec) NREP MAIN SUBSTATION (SS#10): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 50kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 800 A, 50kA (1 Sec) NREP MAIN SUBSTATION (SS#10): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 800A, 50kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 50kA (1 Sec) NREP MAIN SUBSTATION (SS#10): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 50kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 800 A, 50kA (1 Sec) UTILITY SUBSTATION (SS#13): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 800A, 50kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) UTILITY SUBSTATION (SS#13): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) UTILITY SUBSTATION (SS#13): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) UTILITY SUBSTATION (SS#13): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 1000 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 1000A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 1000 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 1000A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR
MV SWITCHGEAR 415V, 1000 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 1000A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR
MV SWITCHGEAR 415V, 800 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 800A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 4000 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 4000A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 4000 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR - 415 V AC, 3Ph, 4W, 50Hz, 4000A, 65kA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 1600 A, 65kA (1 Sec) ETP & COOLING TOWER SUBSTATION (SS#14): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 65Hz, 1600A, 65KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 1250 A, 65kA (1 Sec) OFFSITES-I SUBSTATION (SS#17): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 1250A, 65KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 4000 A, 65kA (1 Sec) OFFSITES-I SUBSTATION (SS#17): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 4000A, 65KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 4000 A, 65kA (1 Sec) OFFSITES-I SUBSTATION (SS#17): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 4000A, 65KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) OFFSITES-I SUBSTATION (SS#17): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 800 A, 65kA (1 Sec) OFFSITES-II SUBSTATION (SS#18): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 800A, 65KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 65kA (1 Sec) OFFSITES-II SUBSTATION (SS#18): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 3150A, 65KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 3150 A, 50kA (1 Sec) OFFSITES-II SUBSTATION (SS#18): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 3150A, 50KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 800 A, 50kA (1 Sec) OFFSITES-II SUBSTATION (SS#18): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 800A, 50KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 800 A, 50kA (1 Sec) CDU/VDU SUBSTATION (SS#15): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 800A, 50KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR.
MV SWITCHGEAR 415V, 1600A, 50kA (1 Sec) SWITCHYARD SUBSTATION (SS#21): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 1600A, 50KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR
MV SWITCHGEAR 415V, 2000A, 50kA (1 Sec) MCR-2 (DCU): MV SWITCHGEAR – 415 V AC, 3Ph, 4W, 50Hz, 2000A, 50KA FOR 1 SEC, DRAW-OUT TYPE AS PER SLD, FEEDER LIST & TENDER DOCUMENTS ATTACHED WITH MR
Special Tools and Tackles for the entire package for Erection, Installation, Testing, Commissioning, Operation & maintenance as per OEM recommendations As per Manufacturer’s recommendation
Pre-Commissioning / Commissioning / Start-Up Spare Parts for entire MV Switchboards - 415V As per Manufacturer’s recommendation
Training to 2 Nos. of Owner personnel at OEM’s factory for 1 Week for the entire Package (Including Condition monitoring).
Training to 10 Nos. of Owner personnel at NREP Site for 1 Week for the entire Package (Including Condition monitoring).
Supervision services for Installation, testing and commissioning for the entire package and Commissioning / Support Engineer from OEM shall be stationed at NREP Site for the duration of 1 month from the date of commissioning & handover for the entire package
Cost for Additional Warranty period of "24 months after commissioning or 36 months after dispatch whichever is earlier” as per Note 12.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid