Closing Date
31 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er Onkar Singh
EXECUTIVE ENGINEER PROVL DIV PWD BR BATHINDA
NEW CONSTRUCTION OF ROAD FROM KOTHE KAME KE TO KOTHE ARORAYA KE
2025_CEPW_156573_1
PB/BTI/109
Open Tender
Civil Works - Roads
Percentage
120 days
DIST BATHINDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹41,644
21 Apr 2026
25 Dec 2025
1 Jan 2026
25 Dec 2025
31 Dec 2025
25 Dec 2025
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER PROVINCIAL DIVISION, BATHINDA
NAME OF WORK:- NEW CONSTRUCTION OF ROAD FROM KOTHE KAME KE TO KOTHE ARORAYA KE
Contract No: CIVIL Works
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Work Name Item Code / Make Quantity Unit Rate Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
Dismantling brick edging as per CSR 8.5 (i) 0.000 Cum Full Conversion INR
Compaction of earth work & Prepration of Sub grade including loosing,leveling ofearth 225mm thick top layer, rough dressing of soil, final dressing of earth to givelevel camber,watering,rolling with road roller,compacting the bed to achieve minimun dry density as given in Table 300-2 as per technical clause 305 of MORT&H specifications (in case of link roads earth work to be done by villagers.) as per CSR 24.4(c) sqm Full Conversion INR INR Ten Thousand Seven Hundred & Fifty One and Paise Twenty Only
Construction of granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORD technical specifications CSR-24.7 Cum Full Conversion INR INR Three Lakh Two Thousand Four Hundred & Ten and Paise Forty Two Only
Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications (without screening for low volume Roads/undersigned) 24.11(ii) Cum Full Conversion INR INR Two Lakh Eighty Three Thousand Five Hundred & Ninety One and Paise Seventy Four Only
Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical specifications (without screening for low volume Roads/undersigned) 24.12(ii) cum Full Conversion INR INR Two Lakh Eighty Three Thousand Five Hundred & Eighty Six and Paise Sixty Four Only
Providing and laying surface dressing in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG-10 @ 1kg per sqm laid on prepared surface after cleaning the road surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications CSR 24.24 sqm Full Conversion INR INR One Lakh Forty Four Thousand Five Hundred & Forty Five and Paise Eighty Seven Only
Tack coat with Bitumen VG-10 Providing and applying tack coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specifications sqm Full Conversion INR INR Thirty Eight Thousand Nine Hundred & Ninety and Paise Thirteen Only
Providing, laying and compaction of open - grade surfacing of 20 mm thickness consisting of crushed stone aggregates of specified grading premixed in a Continuous type hot mix plant with bituminous binder VG-10 @ 1.46kg per sqm, laid with Paver Finisher Mechanical and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades complete as per technical clause 510 of MORT&H specifications CSR24.25(a) Sqm Full Conversion INR INR Two Lakh Fifty Seven Thousand Four Hundred & Thirty Three and Paise Fifty Two Only
Providing and laying of premix sand seal coat premixed in Continuous type hot mix plant using specified fine aggregates and penetration grade bitumen VG-10 @ 0.68kg per sqm, laid to the specified levels, grade and cross fall complete as per technical clause 511 of MORT&H specifications CSR 24.28(c) sqm Full Conversion INR INR One Lakh One Hundred & Twelve and Paise Nine Only
Providing and making rumble strips 15-20mm high at centre, 250mm wide placed at 1m centre to centre over freshly laid bituminous layer by using close graded premix surfacing material type B at approved locations to control speed and marked with 100mm wide white strips of thermoplastic road marking paint. The close graded premix surfacing material type B shall conform to technical clause 512 and thermoplastic road marking paint shall conform to technical clause 803 of MORT&H specifications as per CSR 24.62 a Mtr Full Conversion INR INR Nine Hundred & Ninety Eight and Paise Eight Only
Toe wall Mtr Full Conversion INR INR Eight Lakh Sixteen Thousand One Hundred & Eighty Only
credit of material brick bats csr 3(12d) cum Full Conversion INR INR Minus Thirty Five Thousand One Hundred & Ten and Paise Twenty Eight Only
credit of material brick Nos. Full Conversion INR INR Minus One Lakh Sixty Six Thousand Seven Hundred & Forty Eight Only
videography of road Nos. Full Conversion INR INR One Thousand Only
cultural cess 1% Percentage Full Conversion INR INR Twenty Thousand Six Hundred & Sixteen and Paise One Only
Total in Figures INR Twenty Lakh Eighty Two Thousand Two Hundred & Seventeen and Paise Seventeen Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.29 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.64 MB
SBD109.pdf
Tender Documents • 20.75 MB
Technicalcondition.pdf
Additional Documents • 4.92 MB
BOQ_317423.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .