Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | Admitted-Finance |
| 4 | Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Admitted-Finance |
Tender Value
₹8.6 L
EMD Value
₹9,000
Closing Date
20 Jan 2022, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC ALIGARH
LAL DIGGI ALIGARH
Carriage Shifting AND Erection of New 40 MVA, 132 33 KV Power T F at 132 KV Substation Aliganj under ETD Mainpuri
2022_UPTCL_673956_1
SHORT TERM E-TENDER NO. ETC-50/2021-22
Open Tender
Electrical Works
Item Rate
30 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC ALIGARH
₹9,000
14 Apr 2022
8 Jan 2022
20 Jan 2022
8 Jan 2022
20 Jan 2022
8 Jan 2022
120 days
Amount
Loading of 40 MVA T/f 132/33 Kv T/F at 132 KV S/S Boner including all accessories on truck/trailer the work includes jacking the T/F tank for placing the wooden sleeper under the tank and simultaniously lifting the tanktill wodden plateform come in the allingment of trailer bed then shifting the tank from wooden plateform to trailer bed . Removal of rails etc. from under the tankon trailer bed withthe help of wire ropeand heavy turn buckel for safe transportation.
Safe carriage of 40 MVA T/f 132/33 Kv T/F from 132 KV S/S Boner to 132 KV S/S Aliganj( Distance approx 135 KM )including all accessories on suitable capacitytrailer/ truck to be arranged by the contractor at hisown cost. Inssurance will be got done by contractoras per direction of supervising engineer, if required whichshall be reimburssed at actual by UPPTCL on production of papers.
Unloading of 40 MVA T/f 132/33 Kv T/F at 132 KV S/S Aliganj including from truck/trailer ,the work includes opening of laces ,jacking the T/F tank for placing the rails under the tank, shiftingit to wooden sleeper to be prepared adjacent to trailer removing the rails from under the tank on wooden plateform of sleepers. lowering the tank towards the ground by slowly removing the sleepers from under the tank plateform under the tank
Shifting of main tank of 40 MVA, 132/33 KV Transformer from unloading site to plinth 20 meters distance including turning of tank, if required, including all T&P and all other works required to complete the job satisfactorily at 132 KV S/S Aliganj.
Additional shifting of main tank of new 40 MVA T/F, to safe distance 5 Mtrs or part there of if required.
Complete erection of new 40 MVA, 132/33 KV Transformer by shifting & erection of radiators, conservator tanks, all bushings, their turrets, connecting all pipe lines, cooling fans, motor drive mechanism of tap changer, RTCC panels, marshaling box etc. to complete the job satisfactorily including first filling of oil and topping up of transformer oil (Not circulation) in tank radiators, oil pipe lines, conservator tank etc. and all other associated works for satisfactorily completion of work. 132/33 KV, 40 MVA T/F accessories provided by UPPTCL.
Carriage of Oil tank capacity 20 KL from available S/s to 132 KV S/S Aliganj and same from 132 Kv S/S Aliganj to available S/S including loading and unloading.
Draining out of Complete T/F oil from T/f in empty oil tank capacity 18 KL Apprx
Attanding leakage of 40 MVA T/f by replacement of old & damaged Gasket
Main Tank cover By lifting Cover plate and winding upto 20 cm from its present level and replacing gaskete with standard procedure as per direction of supervising engineer
Radiator Pipe Flandge, Valve Gaskete, air plug gaskte, other Gaskte
Inspection Window
Complete evacuation of 40 MVA transformer main tank and filling of Dry Nitrogen/dry air of dew point-50C better in vacuum up to pressure of 0.25Kg./Cm2 and the again evacuating the transformer tank after required time interval (approx 12/24 hrs.) using centrifuging machine the work shell including connecting pipe of machine as required measuring due point values of N2/Dry Air after every cycle till the required value is achieved.
Create the vacuum inside the tank for 24 Hrs at 760 mm per Hg
Filling of T/f oil into T/F from 20 KL Oil tank
Flusing of main tank core and winding by hot Centrifused T/F oil
Centrifuging of fresh transformer oil and filling of balance oil into transformer by centrifuging machine having skilled operator and to achieve & provide final BDV & PPM Testing results as per norms. T/F oil provided by UPPTCL.
Transformer oil sample collection testing of T/F oil at CPRI/ERDA lab Noida /Bhiwadiprefer CPRI & finishing test report for a- DGA test -02 , B- BDV test -01, Water PPM test-01
Earthing of new 40 MVA 132/33 KV transformer body & neutral , including Marshaling Box, RTCC panel etc. with MS flat size 50X6 mm / 75X10 mm and connecting the same with main earthmat at two places as required including painting of such MS flats with green enamel paint above ground surface.MS flats provided by the UPPTCL.
Delta earthing of 40 MVA T/f neutral by additional welding and interconnection using 75X10 mm MS plate ( MS plate provided by Department)
Termination work of Control Cables of T/F in Marshalling Box by providing Cable Glands, Lugs, Ferrules, Cable Ties and Lugs etc. including making necessary holes in glands plates or box wherever required, supply and fixing of cable glands of appropriate size, supply and providing ferrules and nos. for each core of cable and its termination with crimping Type Lugs of Dowell/Coma/Jackson Make and all other associated work to complete the job successfully as per technical specifications.
Installation of new RTCC panel , new 40 MVA T/F work includes its shifting from yard/designated place to installation site & its proper earthing as per direction of supervising engineer
Proper cable termination of RTCC panel, cooling fan etc after making cable schedule ferruling properly ferrules will be provided by contractor only at his own cost.
Jumpering of 40 MVA T/F with moose/panther conductor ,between LA and CT, Bushings (HV and LV)
Providing and fixing of MS wire mesh of size 7 Mtr x 3.2 Mtr wire mesh size 1x1" of 14 SWG between 40 MVA T/F and 33 KV Lighting arrestor work includes fabrication of frame of MS angle of size 65x65x6 mm, supported by vertical MS angle of size 50x50x6mm at two place at equidistance, similarly providing MS flat of size 50x6mm at two places at equidistance frames must be fabrication with 02 Nos. legs of length 2x4 mtrs of size65x65x6mm MS angle each leg will be provided with a cleat of size 50x50x6 mm MS angle of length 150mm grouting of legs will be done with concrete ration of M15 up to 700mm with a chimney size 300 mm x 300mm also earthing of wire mesh at two places with main mat through 25x6 mm MS flat.
Fixing of 33 KV Post insulator on frame by making proper poles wielding etc. work also includes proper jumper of twin ACSR Moose conductor over post insulator from LV bushing of 40 MV T/F to 33 KV Current T/F as per direction of supervising engineer.
Painting of wire mesh with two coat of good quality red oxide paint & two coat of light grey colour paint of good quality as per direction as supervising engineer.
TAJ ENTERPRISES
Versha and Brothers
Perfect Power Transformer Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .