| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L4₹47.2 L+₹1.7 L (3.83%)Accepted-AOC | ₹47.2 L+₹1.7 L (3.83%) | L4 | Accepted-AOC Lowest vaild/Bonafide Bidder |
| 2 | L1₹45.5 LRejected-Finance | ₹45.5 L | L1 | Rejected-Finance invalid/ Non Bonafide Bidder |
| 3 | L2₹45.8 L+₹29,055 (0.64%)Rejected-Finance | ₹45.8 L+₹29,055 (0.64%) | L2 | Rejected-Finance invalid/ Non Bonafide Bidderr |
| 4 | L3₹47.1 L+₹1.6 L (3.43%)Rejected-Finance | ₹47.1 L+₹1.6 L (3.43%) | L3 | Rejected-Finance invalid/ Non Bonafide Bidder |
| 5 | L5₹50.4 L+₹4.9 L (10.8%)Rejected-Finance | ₹50.4 L+₹4.9 L (10.8%) | L5 | Rejected-Finance Other than Lowest Bidder |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
12 Feb 2020, 6:00 pmClosed
GE NARANGI
GE Narangi C/O 99 APO Guwahati
OUTSOURCING OF SERVICES FOR OPERATION OF SEWAGE TREATMENT PLANT, CENTRAL AC PLANT FOR ACM1, ACM 2 AT FAD DEPOT, CENTRAL AC PLANT NBC SHED AT ABOD, FIRE FIGHTING AT VEH COY AND SWIMMING POOL UNDER GE NARANGI
2020_MES_315774_1
8513/B/E8
Open Tender
Civil Works
Item Rate
337 days
GE NARANGI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE NARANGI
₹94,000
Yes
12 Mar 2020
17 Jan 2020
15 Feb 2020
17 Jan 2020
12 Feb 2020
1 Feb 2020
Amount
SCHEDULE 'A' PART-I
Outsourcing of services for continuous running of Sewage Treatment Plant by logging of running records, minor day to day repairs, upkeep of installation 01 x FGM (Semi Skilled labour) each shift consisting of STP, pumping sets, DG Sets, Air compressor, chlorination plant, Sluice valve and reporting the occurences at the installation on all working days inlcuding sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs located at the following installation for a period of 337 Days
Outsourcing of services for continuous running of Sewage Treatment Plant by assisting in unkeep of installation 02 x Helper / Mazdoor each shift, cleaning of installation premises consisting of STP, pumping sets, DG sets, Air compessor, chlorination plant, Sluice valves on all working daysincluding sundays & holidays complete all as directed.The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs located at the following installation for a period of 337 Days
Outsourcing of services for continuous running of Central AC Plant for ACM 1 & ACM 2 at FAD including logging of running records, minor day to day repairs, upkeep of installation 01 x Refrigerator Mech (Semi Skilled labour) each shift and reporting of occurences at the installation consisting of 3X25.1 capacity chiller expansion type with all connected accessories such as compressors, AHU's, pumping sets, cooling towers, panel board and DG sets etc. on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs 3rd Shift : 2200 Hrs to 0600 Hrs located at the following installation for a period of 337 Days
Outsourcing of services for continuous running of Central AC Plant for ACM1 & ACM 2 at FAD by assisting in upkeep of installation 01 x Helper / Mazdoor labour each shift, cleaning of installation consisting of 3X25.1 capacity chiller expansion type with all connected accessories such as compressors, AHU's, pumping sets, cooling towers, panel board and DG sets Etc by keeping clean installation premises on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows: - Shift timing will to be directed by Engr-in-Charge as per site requirement located at the following installation for a period of 337 Days
Outsourcing of services for continuous running of Central AC Plant NBC Shed at Advance Base Ordanmce Depot including logging of running records, minor day to day repairs, upkeep of installation 01 x Refrigerator Mech (semi Skilled labour) each shift and reporting of occurences at the installation consisting of 3 x 52 TR capacity direct expansion type with all connected accessories such as Compressors, AHU’s, pumping sets, cooling towers, panel board and DG set etc on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs 3rd Shift : 2200 Hrs to 0600 Hrs located at the following installation for a period of 337 Days
Outsourcing of services for continuous running of Central AC Plant NBC Shed at Advacne BAse Ordance Depot by assisting in upkeep of installation 01 x Helper / Mazdoor each shift and cleaning of installation consisting of 3 x 52 TR capacity direct expansion type with all connected accessories such as Compressors, AHU’s, pumping sets, cooling towers, panel board and DG set etc by cleaning installation premises on all working days including sundays and holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows :- Shift timings will be directed by Engr-in-Charge as per site requirement located at the following installation for a period of 337 Days
Outsourcing of services for continuous running of fire fighting installation 01 x FGM ( Semi Skilled labour ) each shift and Stand by DG Set at Veh Coy including logging of running records, minor day to day repairs, upkeep of the installation and reporting the occurences at the installation on all working days including Sundays and Holidays. The outsourcing shall be measured shift wise in sequence as follows::- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs 3rd Shift : 2200 Hrs to 0600 Hrs located at the following installation for a period of 337 Days
Outsourcing of services for continuous running of Swimming Pool (size 50mx21m) and diving pool including logging of running records, minor day to day repairs, upkeep of installation 01 x FGM ( Semi Skilled labour) each shift consisting of pump sets, chemical dozing plants pressure filter, suction swiper and other connected machineries and reporting the occurences at the installation on all working days including Sundays and Holidays complete all as directed. The outsourcing shall be measured shift wise in sequence as follows:- 1st Shift :- 0600 Hrs to 1400 Hrs 2nd Shift :- 1400 Hrs to 2200 Hrs located at the following installation for a period of 275 Days (02 FGM per day)
Note:- (i) Staff employed by the contractor shall carry out daily carefully cleaning, greasing of pumps, motors, panel boards, DG sets and internal portion of pump house building, outdoor panel boards and maintain pump house in presentable condition all time all as specified and directed. (ii) The contractor shall carry out routine check and maintain check sheet daily/weekly/monthly and upkeep the installation, rectify normal troubleshooting, replacement of gland packing of pumps, motors and sluice valve in pump houses and delivery valves of overhead tank and minor parts like nut, bolts, washers, coupling rubber, star packing etc. (iii) Contractor/ Rep of Contractor will maintain log sheet daily and submit to department duly completed along with attendance sheet and payment register. (iv) Contractor shall submit the requsite certificates and experience before commencement of work all as specified and directed. (v) The rate of petty stores i.e nut bolts, washer, coupling rubber, star packing, gland rope, grease are included in above quoted rate. (vi) No T&P will be issued by the department for doing the above work, it shall be arranged and provided by the contractor like PH testing kit, chlorine test kit, tubidity test kit, pipe wrench, screw driver, sluice valve opening/ closing kit, cutter plier, digging tools etc at his own cost basis. (vii) The contractor shall provide a proper uniform for the tradesmen which will be specified/ directed by Engr-in-Charge.
Jitu Enterprise
OM CONSTRUCTIONS
KAKWANI BUILDERS
G.K. TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .