| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.9 LAccepted-Finance V P O NALPUR P O KHARKHODA DISTT MEERUTH UP | MEERUT | UTTAR PRADESH | 245206 | ₹8.9 L | L-1 | Accepted-Finance Found L-1 |
| 2 | L-2₹10.5 L+₹1.6 L (18.5%)Rejected-Finance | ₹10.5 L+₹1.6 L (18.5%) | L-2 | Rejected-Finance Not found L-1 |
| 3 | L-3₹10.6 L+₹1.7 L (19.2%)Rejected-Finance | ₹10.6 L+₹1.7 L (19.2%) | L-3 | Rejected-Finance Not found L-1 |
| 4 | Not Admitted-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | - | - | Not Admitted-Finance Not qualified for AOC |
| 5 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | R B SALES UNIT L3 | SHIVAN ENTERPRISES L2 | Sh. Dinesh Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00Preparation of Detail Project Report for F S S M. system including estimation of quantities and cost, carrying out confirmatory field digital survey and KML file, all the studies related to establishment of system, process, hydraulic & structural design of all the components involved in the unit operations & other contingent costs related to preparation of DPR including cost of supplying of 4 (four) sets hard copies of DPR & getting the same approved from the competent authority complete to the satisfaction of Engineer-in-Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired effluent standards of pollution board authorities, like CPCB and HPPCB. | ||||||
| 1.01 | Survey and investigation for providing FSSM facility for Establishment of FSSM System for treatment of Faecal Sludge Generated from Household Sanitation Facilities with State- Of-Art Technology for various panchayats in Haroli Constituency Distt. Una, Himachal Pradesh (Phase-1 Haroli), with using advanced survey technology including Differential Global Positioning System (DGPS)/ Total Station with precession limit of 0.5 cm for preparation of Site Plan, Geotagging of Households, Marking of Proposal, Preparation of L-section and X-section as required, for site condition in complete form. Reconnaissance survey should be conducted for preparation of contour plan in digital form with contouring interval of 1.00 meter showing features such as houses, HT lines, roads and any other required major benchmarks. FSSM facility at different locations latest norms along with engineering drawings and details Drawings shall be prepared with AUTOCADD and nicely binded 04 (Four) copies of set of drawings shall be in hard & in soft format, complete in all respect as per directions of Engineer in Charge | 6.62 | Sq.Km | 69,950 ₹4,63,069 | 69,500 ₹4,60,090 | 59,000 ₹3,90,580 Lowest |
| 1.02 | Preparation of Detailed Project Report (DPR) for establishment of FSSM System for treatment of Faecal Sludge Generated from Household Sanitation Facilities with State- Of-Art Technology for various panchayats in Haroli Constituency Distt. Una, Himachal Pradesh (Phase-1 Haroli) with using advanced technology. Marking of Proposal, Preparation of L-section and X-section as required, for site condition in complete form. The detailed project report should contain complete proposal with detailed design of FSSM System along with all components and latest authentic references. DPR should contain the drawing, details of measurements and abstract of cost of all FSSM components, including Inlet Chamber, Screen Chamber, Grit Channel, Distribution Box, Sludge dewatering and drying systems in the shape of planted and unplanted SDBs, Solar Deactivation unit, Constructed Wetland (Rootzone System), Polishing pond, Multi Media Filter, Chlorine Contact Tank, Fencing Panels around the STP Yard, Steel Gate, Interconnecting Path, Railing and Access Ladder, Plant Building/Chowkidhar Room, manhole chamber, inspection chamber, etc. Drawing shall be prepared with AUTOCADD and nicely winded 04 (Four) copies of set of drawings shall be in hard & in soft format, complete in all respect as per directions of Engineer in Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired effluent standards of pollution board authorities, like CPCB and HPPCB | 6.62 | Sq.Km | 89,800 ₹5,94,476 | 89,250 ₹5,90,835 | 75,000 ₹4,96,500 Lowest |
Tender Value
₹9.0 L
EMD Value
₹17,909
Closing Date
17 Oct 2025, 5:00 pmClosed
Executive Engineer Jal Shakti Divn Haroli
Executive Engineer Jal Shakti Divn Haroli
Preparation of DPR and survey and investigation for Establishment of FSSM System for treatment of Faecal Sludge Generated from Household Sanitation Facilities with State-Of-Art Technology for various gram panchayats in Haroli Constituency Distt. Una,
2025_HPIPH_117468_1
No. JSV/ Haroli/ TA/ tender/25- 6387-6410 dt 10-10-25
Open Tender
Civil Works
Item Rate
90 days
Haroli Consty
as per NIT
6 documents required · 6 mandatory
₹500
Yes
Executive Engineer Jal Shakti Divn Haroli
₹17,909
31 Oct 2025
10 Oct 2025
18 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
10 Oct 2025 - 17 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.65 MB
Tendernotice_3.pdf
PDF • 0.20 MB
Tendernotice_4.pdf
PDF • 0.14 MB
BOQ_171780.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .