Tender Value
₹44.8 L
EMD Value
₹89,699
Closing Date
7 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE OFFICER
NAGAR PANCHAYAT BABUGARH HAPUR
2 - RS farm se Bismillah dhaba Tak nale ka Nirman karya
2026_DOLBU_1194168_2
579/NPBabugarh-E-Tender (Construction) /2026-27 Dated 5-10-2026
Open Tender
Miscellaneous Works
Percentage
180 days
Babugarh
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹5,310
NAGAR PANCHAYAT BABUGARH
₹89,699
7 Oct 2026
7 Oct 2026
7 Nov 2026
7 Oct 2026
7 Nov 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches not exceeding 1.50 m width or 10 Sq.m. on plan or drains not exceeding 1.50 m in width or 10 Sq.m. on plan including dressing of sides and ramming of bottoms, lift upto G.L. m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Supply of all material, labour T&P etc. complete required for the completion works. (0.0m to 1.5m) | 300 | cum | 267.85 | ₹80,355 |
| - | Providing and laying in foundation of drain cement concrete 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) including centering, shuttering and supply of all materials, labour, T&P etc. complete required for the proper completion of works. (Base) | 67.5 | cum | 6,300.9 | ₹4,25,310.75 |
| - | Reinforced concrete work in foundation of drain and mass concrete M-20 (1 cement: 1.5 coarse sand: 3 stone aggregate 20 mm nominal size) including cost of centering, shuttering & binding wire and excluding cost of reinforcement. Including supply of all materials, labour, T&P etc. complete required for the proper completion of works. (In Bedding) | 58.5 | cum | 11,536.45 | ₹6,74,882.33 |
| - | Reinforced cement concrete (1 cement: 1.5 coarse sand: 3 stone aggregate 20 mm nominal size) in walls (any thickness) including finishing and plastering the exposed surfaces with cement mortar 1:3 (1 cement: 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface including cost of centering, shuttering & binding wire and excluding cost of reinforcement. Including supply of all materials, labour, T&P etc. complete required for the proper completion of works. (In Walls) | 89.78 | cum | 11,536.45 | ₹10,35,684.8 |
| - | Reinforced cement concrete in Slab of Drain including finishing and plastering the exposed surface with cement mortar 1:3 (1 cement: 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but including cost of centering and shuttering and reinforcement. (In Slab) | 10.5 | cum | 11,536.45 | ₹1,21,132.73 |
| - | Reinforcement of RCC work including cutting, bending, binding and placing in position complete of MS/TMT bar Including Thermo-Mechanically Treated bars and supply of all materials, labour, T&P etc. complete required for the proper completion of works. | 124.64 | Qtl | 9,007.98 | ₹11,22,740.21 |
| - | Barricading of roads, night lamps and watch and ward of site. including supply of all material & T&P etc. complete required for proper completion of the work. temporary barricading at site as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. (Note: One time payment shall be made for providing barricading from start @50% of Total length) | 300 | Rm | 200 | ₹60,000 |
| - | Making Temporary bunds for totally dry up working space and dismantling of the same after completion of work with placement of sand filled bags (plastic/gunny) at every 30 m spacing or as per actual site condition or as per direction of E/I. Including loading, unloading and carting etc. complete, supply of all materials, labour, T&P etc. complete required for the proper completion of works. | 5 | Nos | 2,000 | ₹10,000 |
| - | Shifting or repairing of house water connection complete with in all respect. Replacing of G.I. Pipe if needed with fittings. Including excavation and replacement of damaged material such as all fittings or saddle, hdpe pipe DN-20 PN-12.5, PE-100GI, pipe 15mm DIA medium quality, elbow, socket, tee, union, tape and all material, labour, carting, loading, unloading etc. complete required for the proper completion of the work or as per direction of E/A. | 10 | No | 1,500 | ₹15,000 |
| - | Repairing of leakage of water mains as disturbed during work. Including excavation and replacement of damaged portion of pipe line including all type of specials D-joints, tailpiece and pipe and all fixing materials etc. complete or as per actual condition of site (80 mm dia to 160 mm dia). | 20 | No | 2,500 | ₹50,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_2254241.xls
BOQ • 0.30 MB
TD_579_02_T2.pdf
Tender Documents • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .