Directorate of Municipal Administration
Erection of 11KV Link Line and Continuous Power supply near from Kargal Chiana Gate Circle to TP Pump house and Jackwell in TP Jog Kargal Limits
DMA/2025-26/EL/WORK_INDENT53472
DMA/2025-26/EL/WORK_INDENT53472
Open
Electrical
DMA Town Panchayat Jog-Kargal
6 documents required · 6 mandatory
Simillar Work Done Certificate 50 percentage of tender amount
GST Registration Certificate
Annual Turn Over Certificate
30 Percentage of Bankers Certificate
Electrical Contractor Registration Certificate
₹500
₹37,600
23 Jan 2026
9 Jan 2026
27 Jan 2026
22 Jan 2026
Erection of 11KV Link Line and Continuous Power supply near from Kargal Chiana Gate Circle to TP Pump house and Jackwell in TP Jog Kargal Limits
02 00 120-Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg WL
02 00 006-PSC Pole-9.0M Long 200 kg WL
02 00 105-RCC Pole-9.0M Long 145 kg WL
Special 3 Pin Cross Arm, clamp and Bolt & Nuts for RCC Poles MS
02 79 020-11kV Horizontal X Arms - Mild Steel (MS)
02 79 510-PSCC Polele (200 Kg WL) clamp - MS
07 33 616-Bolts & Nuts Size 16X65mm-MS
02 79 092-HT ST Support MS
07 33 628-Bolts & Nuts Size 16X150mm-MS
Double Pole Structure 10 Complete including 5 KG 8-SWG G.I.wire for Structure
Grounding - For 9 Mtr RCC Poles 145 kg WL - (without pole)
02 79 149-H - Frame Set for 11kV, 200 Amps Single Break GOS Mounting - MS
03 04 212-11kV 200 Amps Single Break GOS
02 84 108-Rabbit ACSR Conductor
Guy set with No.15 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CP/7/Dt; 24.10.07
5 02 81 683-Spiral Earth Electrode
02 83 008-11kV, 5KN Composite/Polymeric Pin Insulator(24mm dia FP Rod)
02 79 750-Special Clamps (Mild Steel)
Guarding Materials Upto 40 mtrs span
02 83 320-Silcon rubber composite disk insulator/11kV 45 kN Polymeric insulator
Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole asas per approved Drawing - Ordinary Soil
Erection of Poles Erection of 11mtr long Concrete spun pole in a pit of2.5 mtr depth.- Ordinary Soil
Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil
Erection of PSC poles ples 9 to 10 mtr long but in a pit of 1.8 mtr depth.- Ordinary Soil
Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil
Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth.- Ordinary Soil
Fixing of 3 pin special cross arms with clamps, bolts, nuts and washers - Ordinary
Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators
fixing. (Without Single Top Support) - Ordinary Soil
Fixing of HT/LT single top support Ordinary Soil
Erection of 2 pole structure formed out of SM rails or I -Beam of sizes 200x100 175 X90 mm, 225x100mm of using RCC poles 9 mtr to 10 mtr long in pits of 1.8 mtr depth for line deviation with necessary...
Erection of H Frame. - Ordinary Soil
Fixing of GOS including wiring g (11kV SB 200A) - Ordinary Soil
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and
dead ending on strain or disc/strain insulator by means of clamps. - Ordinary Soil
Digging of Pit for GUY SET - Ordinary Soil
Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG)
galvanised steel wire with turn buckle and anchoring arrangement as per approved
drawing. (Excluding excavation of PIT) Ordi...
Providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,)- Ordinary Soil
Fixing guarding including fixing of necessary cross arms between HT and LT line up to a span of 40 mtrs for - Anticlimbing Device - Ordinary Soil
Transporting one pole - Head Load - Not payable for distance less than 25 Mtrs-RCC
Pole-9.0M Long 145 kg WL - Ordinary Soil
Transporting one pole - Head Load - Not payable for distance less than 25 Mtrs-PSC
Pole-9.0M Longg 200 kg WL - Ordinary Soil
Transporting one pole - Head Load - Not payable for distance less than 25 Mtrs-Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg WL - Ordinary Soil
Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 9 mtr RCC/PSC poles -RCC Pole-9.0M Long 145 kg WL - Ordinary Soil
Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 9 mtr RCC/PSC poles -PSC Pole-9.0M Long 200 kg WL - Ordinary Soil
Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 9 mtr RCC/PSC polesa -Pre - Stressed Tubular Spun Pole 11 Mtr
Long - 500Kg WL - Ordinary Soil
Releasing and Refixing-LT 2 Pin X Arms - MS - Ordinary Soil
Releasing and Refixing-LT 4 Pin X Arms - MS -Ordinary Soil
Releasing and Refixing-LT ST Support 50x6mm Flat - MS - Ordinary Soil
Releasing and Refixing-HT ST Support - MS - Ordinary Soil
Releasing and Refixing-Rabbit ACSR Conductor - Ordinary Soil
Releasing and Refixing-11kV Horizontal X Arms - Mild Steel (MS) - Ordinary Soil
Releasing & Refixing of over head service mains(single phase/ three phase) for
consumer installation and street lighting and similar work (While replacing existing
pole)-Piercing connector to suitable...
Construction of new line including Trimming of Trees, if Jungle/Tree/Plant/ Shrubs Exists Malnad/Hill Area
Pole concreting with CC 1:2:4 (without coping), 11 mtrs Spun pole (1000x1000x2500mm)
02 00 105-RCC Pole-9.0M Long 145 kg WL
02 79 112-Double Pole TC sets for erection of 25/63/100kVA 4/5 Star Rated
Transformers using 9 mtr RCC Pole 145Kg WL - MS
03 21 438-63kVA. Aluminium Wdg, BEE 4 Star Rated Open Bushing Type
Distribution Transformers -3 Phase,11kV/433V- Stacked Core with Oil
Earthing Material Set
Guy set with No.15 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CP/7/Dt; 24.10.07
02 79 092-HT ST Support -MS
02 83 007-11kV Pin Insulator 7 (Both Shell and G.I. Pin) - Polymeric
Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil
Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil
Erection of Transformer structure Upto 25/63 KVA - Ordinary Soil
Erection of 63 kVA Transformer on Transformer structure - Ordinary Soil
Digging of pit. For providing GI Pipey type Earthing - Hard Soil
Providing GI Pipe Earthing for lightning arresters Transformer Neutral and
Transformer Metal parts (Excluding digging of pits) - Ordinary Soil
Digging of Pit for GUY SET - Ordinary Soil
Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG)
galvanised steel wire with turn buckle and anchoring arrangement as per approved
drawing. (Excluding excavation of PIT) - Or...
Fixing of HT/LT single top support Ordinary Soil
Transporting one pole - Head Load - Not payable for distance less than 25 Mtrs-RCC
Pole-9.0M Long 145 kg WL - Ordinary Soil
Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 9 mtr RCC/PSC poles -RCC Pole-9.0M Long 145 kg WL - Ordinary Soil
03 03 202-10 kv, 5 kA 1 lightning Arrester Polymeric type with Ground
Fixing of lightning arrestors including wiring. - Ordinary Soil
03 04 212-11kV 200Amps Single Break GOS
02 79 149-H - Frame Set for 11kV, 200Amps Single Break GOS Mounting - MS
03 01 107-LT Protection kit
63 KVA LT Wiring Kit Single Circuit
03 02 011-11 kV DOLO Cutouts
Fixing of GOS including wiring g (11kV SB 200A) - Ordinary Soil
Erection of H Frame. - Ordinary Soil
Fixing of LT Protection Kit - Ordinary Soil
Wiring of One circuit of LT Wiring Kit for for25/63/100 KVA DTC to the existing LT
protection KitKit /Distribution Box via metering box. - Ordinary Soil
Fixing DOLO cutouts / Horn Gap Fuses including fixing of cross arms and wiring -
02 00 103-RCC Pole-8.0M Long 115 kg WL
4 Pin Cross Arm with pole clamp, bolt & nuts & washers for PSC Pole - MS
02 83 158-No8 Strain Insulator
Guy set with No. 8 strain insulator & Concreting materials as per Drwg No.
BESCOM/GM/CP/7/Dt; 24.10.07
02 84 108-Rabbit ACSR Conductor
Digging of Pits 1.5 mtr depth for errection of 7.5/8 mtr Long Steel/RCC/PSC/PCC supports as per approved Drawing - Ordinary Soil
Erection of RCC poles of 7.5 to 8 mtr long in pit of 1.5 mtr depth - Ordinary Soil
Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil
Digging of Pit for GUY SET - Ordinary Soil
Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG)
galvanised steel wire with turn buckle and anchoring arrangement as per approved
drawing. (Excluding excavation of PIT) Ordi...
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and
dead ending on strain or disc/strain insulator by means of clamps. - Ordinary Soil
Transporting one pole - Head Load - Not payable for distance less than 25 Mtrs-RCC
Pole-8.0M Long 115 kg WL - Ordinary Soil
Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 8 mtr RCC/PSC poles -RCC Pole-8.0M Long 115 kg WL - Ordinary Soil
03 57 515-LT Three phase Four Wire 5-30A Thread through type composite
Meter Housing Box 1 consisting of ETV Meter with AMR comply and LTCT
with built in GSM/GPRS modem upto 100kVA Distribution Transf...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-1 15 04 Epress Line 53472.doc
Tender Document • 1.60 MB
TP Jog-Kargal Express Line Estimation 15 04 lakhs.pdf
Others - Detail Estimation • 2.86 MB
2025-26 15TH FINANCE Action Plan.pdf
Others - Action Plan • 2.09 MB
Download all tender documents and submit your bid