Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance SOLAKKALIPALAYAM PERIYA VATTAM POST KODUMUDI VIA ERODE | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹14.7 L (10.0%)Admitted-Finance | ₹1.6 Cr+₹14.7 L (10.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K T R AND CO L1 | M/S PALANISAMY L2 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 682 | m2 | 19.87 ₹13,551.34 Lowest | 21.85 ₹14,901.7 |
| 2.00 | Providing and Laying Wet Mix Mecadam Using 0.396m3 of 45-22.40mm Graded metal, 0.528m3 of 22.40-2.36 mm graded metal and 0.396m 3 2.36 and below size graded metal premixing with water to a densemass on a prepared subgrade / base to temple in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406. | 1,919 | m3 | 1,833.44 ₹35,18,371.36 Lowest | 2,016.78 ₹38,70,200.82 |
| 3.00 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion
Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 12,788 | M2 | 75.11 ₹9,60,506.68 Lowest | 82.62 ₹10,56,544.56 |
| 4.00 | Providing and laying Tack Coat over Existing BT surface using 2.5 Kg of Bitumen
Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 12,788 | m2 | 16.85 ₹2,15,477.8 Lowest | 18.54 ₹2,37,089.52 |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading themix to uniform thickness of 50mm with paver to the specified grades and cross sections and compactedby Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks,Paver Finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 641 | M3 | 9,482.3 ₹60,78,154.3 Lowest | 10,430.53 ₹66,85,969.73 |
| 6.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30 kgs of VG 30 /VG 40 bitumen for premixing for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5. | 384.2 | m3 | 10,063.38 ₹38,66,350.6 Lowest | 11,069.72 ₹42,52,986.42 |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
4 Jul 2023, 3:00 pmClosed
Executive Officer, Chennasamudham Town Panchayat
50, Erode Karur Main Road, Salaipudhur
Strengthening of BT Road at Erode Karur Road to Solakalipalyam Palaiya solakalipalayam at Karungalmedu Harizana Colony pirivu to Periyavattam North Street 2 at Erode Karur Road to Periyavattam North street 8 Via Kuthirai in Chennasamudram Town Pan
2023_DTP_330572_1
55/2023
Open Tender
Civil Works - Roads
Works
180 days
Chennasamudhram Town Panchayat
Tender Documents
2 documents required · 2 mandatory
₹15,600
Executive Officer, Chennasamudhram Town Panchayat
₹1.8 L
Yes
Chennasamudhram Town Panchayat
6 Jul 2023
21 Jun 2023
4 Jul 2023
21 Jun 2023
4 Jul 2023
21 Jun 2023
21 Jun 2023 - 4 Jul 2023
23 Jun 2023
Amount
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and Laying Wet Mix Mecadam Using 0.396m3 of 45-22.40mm Graded metal, 0.528m3 of 22.40-2.36 mm graded metal and 0.396m 3 2.36 and below size graded metal premixing with water to a densemass on a prepared subgrade / base to temple in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5
Providing and laying Tack Coat over Existing BT surface using 2.5 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading themix to uniform thickness of 50mm with paver to the specified grades and cross sections and compactedby Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks,Paver Finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30 kgs of VG 30 /VG 40 bitumen for premixing for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5.
M/S PALANISAMY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_392263.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .