Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 28 7 CHITABARANATHAPURAM 1ST STREET DEVAKOTTAI SIVAGANGAI DISTT | DEVAKOTTAI | SIVAGANGAI | TAMIL NADU | Admitted-Finance |
| 2 | Admitted-Finance RAMANATHAPURAM | RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | TIRUCHIRAPPALLI | TAMIL NADU | 621308 | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
Refer Docs
EMD Value
₹97,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector(Dev),DRDA,Ramanathapuram
District Rural Development Agency,Ramanathapuram
Rejuvenation of Water Bodies in Package No.RSM-1/AGAMT 2021-22 of Rsmangalam Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242185_1
R7/5593/2021/dated 05.07.2022 RSM-1
Open Tender
Civil Works
Item Rate
180 days
District Rural Development Agency
Refer to Tender Document
6 documents required · 6 mandatory
₹0
₹97,000
District Rural Development Agency,Ramanathapuram
9 Sept 2022
19 Jul 2022
8 Aug 2022
19 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
90 days
Amount
Part I: Rathanur Habitation, Deepening of Rathanur oorani with construction of bathing ghat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. Complete
Part II: Chithalur Habitation, Deepening of Chithalur oorani with construction of bathing ghat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. Complete
Part III: Sengudi Habitation, Deepening of Sengudi Manthai oorani with construction of bathing ghat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. Complete
Part IV: Kalakudi Habitation, Deepening of Kaliamman kovil oorani with construction of bathing ghat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. Complete
Part V: Pannakottai Habitation, Deepening of Pannakottai oorani with construction of bathing ghat in Thumbadaikakottai panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part VI: Panikottai Habitation, Deepening of Panikottai oorani with construction of bathing ghat in Thumbadaikakottai panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part VII: Silugavayal Habitation, Deepening of Kuliyal oorani with construction of bathing ghat in Pullamadai panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part VIII: Sengamadai Habitation, Sengamadai Drinking oorani with construction of bathing ghat in Pullamadai panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part IX: Sappaniyendal Habitation, Sappaniyendal Drinking oorani with construction of bathing ghat in Pullamadai panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part X: Manthankudi Habitation, Manthangudi oorani with construction of bathing ghat in Ayingudi panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part XI: Ayingudi Habitation, Ayingudi oorani with construction of bathing ghat in Ayingudi panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part XII: Kanakkanendal Habitation, Kannakkanendal oorani with construction of bathing ghat in Thiruthervalai panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Part XIII: Thiruthervalai Habitation, Kali kovil oorani with construction of bathing ghat in Thiruthervalai panchayat
Clearing the Scrub jungle without uprooting in Water spread area
Clearing the Light jungle without uprooting along the bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
Construction of Bhathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Retaining wall
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed fair sized boulders and hard gravelly soil
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. Complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KOP & CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .