Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 501 TEJAS APARTMENT MILITARY ROAD ANDHERI E MUMBAI MAHARASHTRA 400072 | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PLOT NO 107 BINAGA NH 66 OPP SYNDICATE BANK BINAGA BINAGA UTTARA KANNADA KARNATAKA 581307 UDYAM KR 27 0002087 29BIOPS1325R1ZC R S M | UTTARA KANNADA | KARNATAKA | 581307 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹37,879
Closing Date
22 Nov 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
Naval Ship Repair Yard Naval Base Karwar 581308
OVERHAULING OF CUPOLA VALVE ONBOARD INS KALVARI
2023_NAVY_628568_1
REG-KALVARI-CUPOLA-VALVE
Limited
Miscellaneous Goods
Item Rate
90 days
Naval Ship Repair Yard Naval Base Karwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹37,879
Yes
23 Nov 2023
16 Nov 2023
23 Nov 2023
16 Nov 2023
22 Nov 2023
17 Nov 2023
Amount
General Inspection:- (a) Before this overhaul inspection, the fresh air obturator operating ram must be disembarked and removed in the shop.
Disassembly in the shop :- (a) Remove the contact switch brackets (17) from the guide tube (15); discard the lock washers (M13 and the screws (M4). (b) Unscrew and discard the screws (M3), the lock washers (M9). (c) Remove and store the cam (d) Unscrew and discard the screws (M1), the lock washers (M10). (e) Remove and store the guide tube (15). (f) Remove and discard the spring pin (M15), unscrew the cam gasket stop (12) from the ram rod (8). Store the adjusting shim (11). (g) Remove and discard the screw (M7), remove the plate (9), the leak screw (10) and discard the gasket BS (M14) from the cam bracket stop (12). (h) Using a pin wrench, unscrew the bottom lower ram (2) and discard the O-ring seals (M18) and (M19). (j) Remove and discard the screw (M6) and the break pad (22).Unscrew the upper ram head (6) from the ram body (1). (k) Remove the ram rod (8) from the ram body (1). (l) Discard the O-ring seals (M21). (m) Remove the piston (7) from the ram body (1) and discard the O-ring seals (M18). (n) Remove the upper ram head (6) from the ram rod (8). (p) Remove the socket (4) and the bearing block (5) from the ram rod (8) (q) Remove the socket (4) from the bearing block (5). (r) Remove and discard the screw (M2) and the lock tab washers (M12). (s) Remove and discard the nuts (M8), the lock washers (M10) and (M11), remove the fitted screws (18) and separate the bearing block (5) from the brackets (19). (t) Remove the socket (4) and the bearing block (5) from the ram rod (8). (u) Remove and discard the screws (M5).Remove the upper cap (21) and the ball-joint lower bearing block (3) of the ram rod (8), and store the adjustment block (20).
Cleaning :- (a) Degrease and clean all the parts using SDS in an ultrasonic bath and dry them with oil-free compressed air.
Inspection:- (a) check the general condition of parts which should show no signs of corrosion, shock, caulking, abnormal wear or metal pickup (Cracs,scores,seizing,etc) (b) if necessary, do the repair operations: (i) finish-machine all the damaged threads. (ii) With carbide abrasive paper remove all the marks no the locating parts and contact faces of the seals. (c) Make sure that the surface condition is satisfactory and that the parts are not twisted. (d) Check the welds for condition. (e) Check the surface state of all seals grooves and check the seals contact surface. No sharp edge, burr or score are permissible, because they likely damage the O-ring seals and the scraper ring during the reassembly. (f) Examine in particular: (i) The ram rod (8). (1) It must not be deformed (buckling) (2) The contact surfaces of the sphere must be free from superficial and surface defect: no sign of seizing (slot, crack, etc.) (3) Make sure that the ǿ4, ǿ5, ǿ8 pipes are not blocked. (ii) The piston (7). (1) The contact surfaces must be free from mark, score or superficial defect. (2) Make sure that the ǿ4 pipe is not blocked. (iii) The upper cap (21). (1) The contact surfaces of the sphere must be free from superficial and surface defect: no sign of seizing (slot, crack, etc.) (iv) The ball-joint lower bearing block (3) (1) The contact surfaces of the sphere must be free from superficial and surface defect: no sign of seizing (slot, crack, etc.) (v) The press body (1) (1) Make sure that the ǿ8 pipes are not blocked. (vi) Perform a dimensional check (Figure 2 and table 4) For general condition of paint, call manufacturer. Write the results on table 4 (g) Operation before reassembly (i) The complete painting must be performed before the assembly of the parts. Contact the manufacturer in order to allow him to realize the complete painting. (h) Reassembly in the shop (i) Fit the new ‘O’ ring seal (M 20) (M 21) onto the ram rod (8) (ii) Coat the thread of the screws (M 5) with normal thread locker. Lock the assembly with the screws (M5). (iii) Fit the arm rod (8) with the ball joint lower bearing (3), the adjustment block (20) and the upper cap (21) (iv) Fit the bearing (5) onto the socket (4) with the new screws (M2) and new lock tab washers (M12). (v) Engage the bearing block (5) on the arm rod (8). (vi) Fit the new ‘O’ ring seal (M18) and the new scraper ring (M22) onto the upper ram head (6) (vii) Engage the equipped upper ram head (6) on the ram rod (8) (viii) Fit the new ‘O’ ring seal (M18) on the piston (7) (ix) Engage the equipped piston (7) on the ram rod (8) (x) Fit the bottom lower ram (2) with new ‘O’ ring seals (M18) (M19) (xi) Coat the thread of the bottom lower ram (2) with “ threaded locker compound 242” and screw it into the ram body (1) (xii) Block in rotation of the upper ram head (6) from the ram body (1) with new screws (M6) and the new brake pad (22) (j) Tests : Perform a leak tightness test of the ram chamber connected to the airt system (i) Test conditions: (1)Test duration: 30 Minute (ii) Means: (1) Test fluid: Air, (2) Test pressure: 49.5 bar, (3) Max pressure build-up rate: 5 bar/s (iii) Procedure: Subject the fully assembled fresh air obturator operating ram to a leak tightness test at the test pressure (1) Test fluid: Air (2) Test pressure: 49.5 bar (3) Duration: 30 min (4) Test assessment: No leakage is permissible. (iv) Increase the pressure in 5 bar steps, holding the pressure for 10 min at each step and for 30 min at the maximum pressure
Re-assembly onboard
AIROWELD CORPORATION
ROYAL MARINE ENGINEERING WORKS
M/s shiva Marine Service
MALLIKARJUN ENGG. WORKS
ULTRA MARINE
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .