| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.9 LAccepted-AOC NEW NO 5A OLD NO 80 53RD STREET ASHOK NAGAR CHENNAI TAMIL NADU 600083 | CHENNAI | TAMIL NADU | 600083 | 1 | Accepted-AOC L1 offerer | |
| 2 | Rejected-Technical | - | Rejected-Technical They have not furnished eligiblity criteria clause 1.5,1.6,1.7,1.8 and certain evidences | |
| 3 | Rejected-Technical | - | Rejected-Technical They have not furnished eligiblity criteria clause 1.5,1.6,1.7,1.8 and certain evidences |
Tender Value
₹38.8 L
EMD Value
₹38,500
Closing Date
9 May 2023, 3:00 pmClosed
The DGM (CIVIL)
TCMPF Limited ,Aavin illam,Nandanam-35
Setting up of Pathogenic lab in the existing state central laboratory building at Madavaram Milk Colony , Chennai
2023_TCMPF_301050_1
204/Engg.3/2021
Open Tender
Civil Works - Others
Lump-sum
90 days
Madavaram
Refer tender document eligiblity criteria .All documents should be upload reputed firms
8 documents required · 8 mandatory
₹0
₹38,500
Yes
TCMPF Limited ,Aavin illam,Nandanam-35
25 Aug 2023
11 Apr 2023
10 May 2023
11 Apr 2023
9 May 2023
20 Apr 2023
11 Apr 2023 - 9 May 2023
19 Apr 2023
Amount
SYSTEM I: HVAC System with HEPA filtration Data Available: Clean Room Area: 360 Sqft Height: 8’ Clean Room Volume: 2880Cu.ft Cleanliness: Class 10000 No. of persons: 5 Temperature: 23 to 25°C Rel. Humidity: 60%±5% (Heat Addition from your process Equipments: 5kW) Air Handling Unit: Double skin, 25mm PUF panels made of pre-coated sheets with rigid aluminum sectional frames, 6-Row copper cooling coil of capacity 8.5TR, fresh air arrangement etc. to achieve Class 10000 cleanliness, Capacity: 3000cfm Motor-Blower: High Static blower with forward curved, balanced, impeller of Kruger make (Imported), with heavy duty Motor, drive package etc
Air Conditioner: 1 X 8.5 TR Air Cooled AC DX condensing Unit with scroll compressor duly commissioned with gas charging etc. BLUESTAR / VOLTAS Make
Copper Refrigerant Piping (upto 8mtrs) between AHU and Condensing Unit including fittings & accessories such as Expansion valve, Hand shut off valve, Dryer, support & clamps and Nitrogen pressure testing for leaks & vacuum holding
Terminal HEPA filters to filter 0.3 Micron and larger particles at >99.97% efficiency, installed in specially designed insulated Plenum made of GI, powder coated, installed in false ceiling; total capacity >3000cfm Size: 2' X 2'
Size: 2' X 1'
Size: 1' X 1'
Prefilters: for particles in the range of 10 microns & 5 microns – non-woven fabric, cleanable media with aluminium support mesh; to match AHU capacity
Ducting & Insulation: Factory fabricated rectangular duct, GI, duly insulated with XLPE foam with metalized foil of 13mm thick for Supply Air & 9mm thick for Return Air (RA) 24G
Volume control (GI - 18G) duct Dampers - manual with handle with gradation markings and lock
Fire Dampers (GI - 18G) with a melting fuse link to shut air supply through duct in case of fire and limit switch to switch Off AHU in case of fire
Return Air Risers embedded within wall panels with extruded aluminium Grill for low level pickup
Magnehelic Gauge for room pressure including tubing, probe & fixture
Room Temperature & Relative Humidity Display - Wall mounted (Subzero)
Electrical Work: from our Control Panel to the AHU & Condensing Units including control wiring, Thermostat, Heaters(1.5kW), Humidistat wiring (Incoming wiring with Earthing up to our Control Panel, Client's scope)
Installation, Integration & Commissioning Validation including DQ-IQ-OQ documentation
SYSTEM II: Ventilation System ( Washing, Incubation and Decontamination) Data Available: Clean Room Area: 210 Sqft Height: 8’ Clean Room Volume: 1680Cu.ft Cleanliness: Unclassified No. of persons: 5 No temperature control- No AC Fresh Air Handling Unit: Single skin, with blower and filter sections Capacity 1000cfm
Exhaust Blower: 1000CFM
Ducting Factory fabricated rectangular duct, GI, 24G
Volume control (GI - 18G) duct Dampers - manual with handle with gradation markings and lock
Filters: 20 micron & 5 micron
Electrical Work: Starter for the Blowers with wiring
Installation, Commissioning
SYSTEM III: Clean Room Interior Work Modular, EPS-TF Insulated Clean Room Wall Panels (80mm thick) with both sides 0.5mm thick PPGI with provision for Return Air Risers wherever required
Modular, EPS-TF Insulated Clean Room Ceiling Panels (50mm thick) with both sides PPGI 0.5mm thick PPGI
Coving: Aluminium sections to round off 90° joints between wall- ceiling-floor duly powder coated
Corner Coving: Die cast aluminium coving for corners
Clean Room Hinged Doors: Metallic powder coated with double glazed, SS ball bearing hinges, View panel, door closer, SS handle etc Size: 1.0 X 2.1m
Emergency Exit Door: Size: 1.2 X 2.1m
View Panels: Double glazed, with flush mounting; Size: 900 X 900mm
Lighting fixtures: Clean Room light fittings with LED lamps 40W Size: 2’ X 2’
Lighting fixtures: Clean Room light fittings with LED lamps 40W Size: 2’ X 1’
Epoxy flooring: Self leveling, seamless floor with suitable preparation, 3mm total thickness
Modular power Sockets: 15/5A in the Wall Panels / Partitions
Anti fungal Painting
Wiring: for lighting, sockets & switches complete within the Clean Room area, including cutouts, FRLS wires, PVC conduits etc (Cable tray not considered). Incoming power with earthing to DB by Client
SYSTEM IV: Clean Room Equipments Garment Storage Cabinet with HEPA filtration & UV lamp, GI powder coated Inner Size: 18" X 18" X 54"
Air Shower for one person usage at a time in GI powder coated construction, complete with shower enclosure, doors for entry & exit, HEPA filter, Blower, Nozzles, Electrical controls, Auto control panel with sensors, status indicators, timer & interlock, Electromagnetic lock, Emergency stop, fluorescent lighting Inner size: 700 X 900 X 1850mm; Outer size: 1400 X 1000 X 2300mm
Biological Safety Cabinet: Class II Type A of size 4 X 2 X 2ft in GI Powder Coated construction, complete with Downflor HEPA filter, Exhaust HEPA filter, Prefilter, Blower, Minihelic Gauge, SS workarea with table & drain tray, Sliding front door with counter weight arrangement, UV lamp, Fluorescent lamp etc (exhaust within Lab)
Cross over Bench: Fully SS304 construction with shoe rack beneath the bench Approx Size: 54" X 15" X 21" (to suit Change Room width)
Shoe Rack : Size 36' X 14" X 16" - GI powder coated, 3 tier
Loop Incinerator - IR
SYSTEM V: Utilities Smoke Detection and Alarm System: Conventional sensors (8Nos), Conventional control panel, MCP, RI, Audio-visual alarm, wiring/cabling with alarm
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .