| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | ₹11.6 L Quoted ₹10.1 L | L1 | Accepted-AOC ok |
| 2 | L2₹10.2 L+₹3,170.39 (0.31%)Rejected-Finance | ₹10.2 L+₹3,170.39 (0.31%) | L2 | Rejected-Finance L2 |
Tender Value
₹12.3 L
EMD Value
₹24,600
Closing Date
1 Jun 2026, 12:00 pmClosed
Executive Engineer
EE red saharanpur vikas bhawan delhi road saharanpur delhi road
GRAM NAVADA ME LIYAKAT KI DUKAAN SE NISAAR KE MAKAAN TAK C.C.ROAD VAI NALI NIRMAAN KARYA.
2026_REDUP_1153057_5
230/RED/cashier/26-27 dt 08-05-2026
Open Tender
Civil Works
Percentage
90 days
EE red saharanpur
GRAM NAVADA ME LIYAKAT KI DUKAAN SE NISAAR KE MAKAAN TAK C.C.ROAD VAI NALI NIRMAAN KARYA.
3 documents required · 3 mandatory
₹766
₹24,600
EE red saharanpur vikas bhawan delhi road saharanp
28 Jul 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 3000 m as per Technical Specification Clause 202. including Disposal of refused Dismenteled material
As Per S.E. (R.E.D.), Saharanpur Sanction Also including Cartage As Per SOR | 127.65 | Cum | 597.55 | ₹76,277.26 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 3000 m
As Per S.E. (R.E.D.), Saharanpur Sanction Also including Cartage As Per SOR | 382.95 | Cum | 192.85 | ₹73,851.91 |
| 3 | Providing concrete for plain/reinforced concrete (P.C.C grade M 10, Nonimal Mix 1:3:6) (Cement : Coarse Sand: Stone Ballast) in open foundations complete as per drawings
As Per S.E. (R.E.D.), Saharanpur Sanction | 6.08 | Cum | 5,453.95 | ₹33,160.02 |
| 4 | Brick masonry work in cement mortar 1:4 (Cement : Coarse Sand) in substructure complete excepting pointing and plastering, as per drawing
As Per S.E. (R.E.D.), Saharanpur Sanction | 8.08 | Cum | 5,559.4 | ₹44,919.95 |
| 5 | Plastering with cement mortar (1:4) (Cement : Coarse Sand), 12 mm thick on brick work in substructure
As Per S.E. (R.E.D.), Saharanpur Sanction | 51.75 | Sqm | 167.2 | ₹8,652.6 |
| 6 | Providing concrete for plain/reinforced concrete P.C.C. grade M-20 Nominal mix (1:2:4) (Cement : Coarse Sand: Stone Ballast) in open foundations complete as per drawings
As Per S.E. (R.E.D.), Saharanpur Sanction | 3.35 | Cum | 5,718.05 | ₹19,155.47 |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
As Per S.E. (R.E.D.), Saharanpur Sanction | 77.05 | Cum | 2,028.25 | ₹1,56,276.66 |
| 8 | Cement Concrete (Thickness as Design) in proportion 1:1.5:3 with 43 grade cement or any other type as per Clause 1501.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved, curing of concrete slabs for 14-days,
As Per S.E. (R.E.D.), Saharanpur Sanction | 115.58 | Cum | 6,487.55 | ₹7,49,831.03 |
| 9 | Supply and fixing of a sign board including necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the work
As Per S.E. (R.E.D.), Saharanpur Sanction | 1 | No. | 4,085 | ₹4,085 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_2160732.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .