Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.3 LAccepted-AOC 1177 28 AJMER AJMER RAJASTHAN 305001 | AJMER | RAJASTHAN | 305001 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | Rejected-Technical 156 INDIRA COMMERCIAL COMPLEX TRANSPORT NAGAR KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | - | Rejected-Technical Rejected due to non-compliance of confirmatory documents |
| Sl No | Description | Qty | Unit | JEET ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00 | Repairing of Primary Crusher Gear Box, Model: K3-24HN-1-A-03-0200-11 LR, S. No.: H72570, Speed Ratio: 19.17:1, Make: Elecon at Departmental Semi-Mobile Crusher Scope of Work: 1). Dismounting/ dis-assembling of casing by removing of nut-bolt arragement 2). Dismounting/ dis-assembling of complete gear-train assemblies from input assembly to output assembly including couplings and hubs 3). Dis-assembling of damaged parts of the input assembly along with its matching wheel 4). Welding of its housing by suitable electrodes (L&T 680 and equivalent) 5). Grinding of welded area 6). Line boring of housing to required dimension adaptable for bearing 7). Buffing and polishing of the machined surface 8). Checking of bore for proper fitment 9). Rethreading of holes 10). Providing and fixing of distance pieces and labrynth cover of the input shaft assembly 11). Assembling of internal gear trains of the gear 12). Blue-matching of the gear teeths of the pinion and gears for proper alignment of each gear from input side to output side 13). Assembling of casing units 14). Providing and fixing of End covers of gear box unit 15). Providing and fixing of set of nut-bolts 16). Providing and fixing of oil seals 17). Assembling coupling units on both input and output ends 18). Cleaning and painting (inside and outside), re-assembling and no-load testing of complete gear-box after fitment of all the internals | 1 | Job | 12,15,000 ₹12,15,000 Lowest |
| 2.00Note: 1). Job shall be carried out at the contractor's workshop and the job shall be routed through Regional Stores, Dipka Area. 2). To and fro transportation is under the bidder's scope. | ||||
| 3.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹14.3 L
EMD Value
₹18,000
Closing Date
18 Jul 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Repairing of Primary Crusher Gear Box, Model K3-24HN-1-A-03-0200-11 LR, S. No. H72570, Speed Ratio 19.17/1, Make Elecon at Departmental Semi-Mobile Crusher of Dipka Expansion Project.
2025_SECL_338682_1
SECL/GM/DA/SO(EnM)/ e-tender/25-26/50 dtd-01/07/25
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
4 documents required · 4 mandatory
₹18,000
19 Sept 2025
2 Jul 2025
21 Jul 2025
2 Jul 2025
18 Jul 2025
3 Jul 2025
2 Jul 2025 - 9 Jul 2025
Amount
Repairing of Primary Crusher Gear Box, Model: K3-24HN-1-A-03-0200-11 LR, S. No.: H72570, Speed Ratio: 19.17:1, Make: Elecon at Departmental Semi-Mobile Crusher Scope of Work: 1). Dismounting/ dis-assembling of casing by removing of nut-bolt arragement 2). Dismounting/ dis-assembling of complete gear-train assemblies from input assembly to output assembly including couplings and hubs 3). Dis-assembling of damaged parts of the input assembly along with its matching wheel 4). Welding of its housing by suitable electrodes (L&T 680 and equivalent) 5). Grinding of welded area 6). Line boring of housing to required dimension adaptable for bearing 7). Buffing and polishing of the machined surface 8). Checking of bore for proper fitment 9). Rethreading of holes 10). Providing and fixing of distance pieces and labrynth cover of the input shaft assembly 11). Assembling of internal gear trains of the gear 12). Blue-matching of the gear teeths of the pinion and gears for proper alignment of each gear from input side to output side 13). Assembling of casing units 14). Providing and fixing of End covers of gear box unit 15). Providing and fixing of set of nut-bolts 16). Providing and fixing of oil seals 17). Assembling coupling units on both input and output ends 18). Cleaning and painting (inside and outside), re-assembling and no-load testing of complete gear-box after fitment of all the internals
Note: 1). Job shall be carried out at the contractor's workshop and the job shall be routed through Regional Stores, Dipka Area. 2). To and fro transportation is under the bidder's scope.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .