| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC F IA 24 4210 CO JAYKRISHNAPUR P O BEGAMPUR DIST HOOGHLY | BEGAMPUR | HOOGHLY | WEST BENGAL | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹7.9 L+₹32,950 (4.34%)Rejected-Finance NABAJIBAN 1 NABAJIBAN COLONY BISHARPARA KOLKA 700158 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700158 | L2 | Rejected-Finance 2nd lowest bidder | |
| 3 | L3₹8.0 L+₹39,960 (5.27%)Rejected-Finance 19 LAKE TEMPLE ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | L3 | Rejected-Finance 3rd lowest bidder |
| Sl No | Description | Qty | Unit | ANIKET COOLING AND REFRIGERATION CO L2 | Shinryo Suvidha Engineers India Pvt. Ltd. L3 | P. M. COOLING AND ENGINEERING CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply , Installation Testing & Commissioning of Refrigeration Unit for WIC Refrigerant -- R-404A/407C 15000 BTU capacity for the 220V. 1Ph A.C Air Cool Condensing unit complete with Sealed Unit compressor, Air cooled heavy duty Copper Condenser coil, Blower Motor Accumulator, Condenser Fan Motor, Service Valve, cut out Switch, Condercer Housing and Complete Angle Iron Unit base.icluding making Iron base foundation. | 2 | Set | 1,40,250 ₹2,80,500 | 1,38,500 ₹2,77,000 | 1,35,500 ₹2,71,000 Lowest |
| 1.01Enclosed Safety Cage for ODU Supplying, fabrication & fixing 3 Nos. M.S U-channel of 6mm thick of size (75mm X 40 mm X 40mm) of 1m length for making platform for installation of outdoor unit incl. drilling 2 nos holes in each channel including cutting holes into the wall & grouting the same with cement concrete (1:1 1/2:3) etc. fabricated with 2 Nos. horizontal angle of 25mm X 25mm X 5mm of 1m. length incl. S&F of enclosed safety cage (for ODU) made of angle (25 X 25 X 5 mm) and flat (25 X 5 mm) iron with necessary painting with 02 coat of R.O. primer (Asianpaint / Shalimer / Berger) incl. shade arrangement with corogated PVC shade with proper clamping arrangement incl. Cu Pipe Line Safety Grill Enclosure. | ||||||
| 1.02Supply & Fixing of perforated GI Cable tray with perforation not more than 17.5% suspended from ceiling incl. S&F GI connector, 6mm dia MS suspender, bolts & nuts, steel fastener etc. as required of the following size. Incl. A1 painting of MS support with 25x25x3mm angle iron support 300x50x1.25mm (18SWG) (for the protection of copper pipe)" fixing of ODU as per sight requirement direction of EIC. (Make:- Bluestar/Emerson Copeland) | ||||||
| 2.00 | Supply , Installation Testing & Commissioning of Refrigeration Air Cooled Refrigeration Unit for WIC Refrigerant -- R-404A/407C 10000 BTU capacity for the 220V. 1Ph A.C Air Cool Condensing unit complete with Sealed Unit compressor, Air cooled heavy duty Copper Condenser coil, Blower Motor Accumulator, Condenser Fan Motor, Service Valve, cut out Switch, Condercer Housing and Complete Angle Iron Unit base.icluding making Iron base foundation. | 1 | Set | 1,16,280 ₹1,16,280 | 1,14,680 ₹1,14,680 | 1,12,000 ₹1,12,000 Lowest |
| 2.01Enclosed Safety Cage for ODU- Supplying, fabrication & fixing 3 Nos. M.S U-channel of 6mm thick of size (75mm X 40 mm X 40mm) of 1m length for making platform for installation of outdoor unit incl. drilling 2 nos holes in each channel including cutting holes into the wall & grouting the same with cement concrete (1:1 1/2:3) etc. fabricated with 2 Nos. horizontal angle of 25mm X 25mm X 5mm of 1m. length incl. S&F of enclosed safety cage (for ODU) made of angle (25 X 25 X 5 mm) and flat (25 X 5 mm) iron with necessary painting with 02 coat of R.O. primer (Asianpaint / Shalimer / Berger) incl. shade arrangement with corogated PVC shade with proper clamping arrangement incl. Cu Pipe Line Safety Grill Enclosure. | ||||||
| 2.02Supply & Fixing of perforated GI Cable tray with perforation not more than 17.5% suspended from ceiling incl. S&F GI connector, 6mm dia MS suspender, bolts & nuts, steel fastener etc. as required of the following size. Incl. A1 painting of MS support with 25x25x3mm angle iron support 300x50x1.25mm (18SWG) (for the protection of copper pipe)" fixing of ODU as per sight requirement direction of EIC. (Make-Bluestar/Emerson Copeland) | ||||||
| 3.00 | Supply,delivery and charging of Refrigerant Gas R-404A/R-407C | 20 | Kg. | 950 ₹19,000 Lowest | 965 ₹19,300 | 960 ₹19,200 |
| 4.00 | Cost of complete installation of the plant, including high-pressure dry nitrogen gas pressure testing and system vacuum testing, each for 48 hours, commissioning, and performance testing to ensure proper functionality and maintenance of the desired temperature, complete in all respects. | 1 | Job | 11,360 ₹11,360 Lowest | 14,680 ₹14,680 | 12,000 ₹12,000 |
| 5.00 | Cost of laying suction line, discharge line, and condenser-to-receiver pipeline using copper pipes of various sizes and types, including supply and installation of switches, expansion valve, solenoid valve, ball valve, hand shut-off valve, drier, and necessary brass flare nuts, along with insulation of the suction line all complete as per the direction of the Engineer-in-Charge. | 1 | Job | 52,350 ₹52,350 | 52,350 ₹52,350 | 48,000 ₹48,000 Lowest |
| 6.00 | Supply, providing and laying of 60 mm thick PUF insulation board within the chamber floor, including necessary wooden framework using 2” x 1½” wood sections fixed with thick cardio coat adhesive solution. The insulation shall be finished with ½” thick cement plaster reinforced with GI mesh wire net, bolts, ‘U’ hooks, stainless steel screws, and nails. After placement of the PUF insulation, the chamber floor shall be completed with thick cement concrete casting over a sand-cement base, finished with neat cement topping and proper drainage arrangement — all complete as per direction. | 510 | Sq.ft | 384 ₹1,95,840 | 390 ₹1,98,900 | 375 ₹1,91,250 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,406
Closing Date
25 Jul 2025, 2:30 pmClosed
SENIOR SUPERINTENDING ENGINEER
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound,Midnapore,Paschim Medinipur
S.I.T.C. of WIC refrigeration unit and centrifugal humidifier at cold storage room of Panskura Flower market, Panskura, Purba Medinipur.
2025_WBPWD_880626_1
WBPWD/SSE/SWEC/NIQ06/2025-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
25 days
PURBA MEDINIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,406
OFFICE OF THE SENIOR SUPERINTENDING ENGINEER
29 Sept 2026
18 Jul 2025
28 Jul 2025
18 Jul 2025
25 Jul 2025
21 Jul 2025
21 Jul 2025
Amount
Supply , Installation Testing & Commissioning of Refrigeration Unit for WIC Refrigerant -- R-404A/407C 15000 BTU capacity for the 220V. 1Ph A.C Air Cool Condensing unit complete with Sealed Unit compressor, Air cooled heavy duty Copper Condenser coil, Blower Motor Accumulator, Condenser Fan Motor, Service Valve, cut out Switch, Condercer Housing and Complete Angle Iron Unit base.icluding making Iron base foundation.
Enclosed Safety Cage for ODU Supplying, fabrication & fixing 3 Nos. M.S U-channel of 6mm thick of size (75mm X 40 mm X 40mm) of 1m length for making platform for installation of outdoor unit incl. drilling 2 nos holes in each channel including cutting holes into the wall & grouting the same with cement concrete (1:1 1/2:3) etc. fabricated with 2 Nos. horizontal angle of 25mm X 25mm X 5mm of 1m. length incl. S&F of enclosed safety cage (for ODU) made of angle (25 X 25 X 5 mm) and flat (25 X 5 mm) iron with necessary painting with 02 coat of R.O. primer (Asianpaint / Shalimer / Berger) incl. shade arrangement with corogated PVC shade with proper clamping arrangement incl. Cu Pipe Line Safety Grill Enclosure.
Supply & Fixing of perforated GI Cable tray with perforation not more than 17.5% suspended from ceiling incl. S&F GI connector, 6mm dia MS suspender, bolts & nuts, steel fastener etc. as required of the following size. Incl. A1 painting of MS support with 25x25x3mm angle iron support 300x50x1.25mm (18SWG) (for the protection of copper pipe)" fixing of ODU as per sight requirement direction of EIC. (Make:- Bluestar/Emerson Copeland)
Supply , Installation Testing & Commissioning of Refrigeration Air Cooled Refrigeration Unit for WIC Refrigerant -- R-404A/407C 10000 BTU capacity for the 220V. 1Ph A.C Air Cool Condensing unit complete with Sealed Unit compressor, Air cooled heavy duty Copper Condenser coil, Blower Motor Accumulator, Condenser Fan Motor, Service Valve, cut out Switch, Condercer Housing and Complete Angle Iron Unit base.icluding making Iron base foundation.
Enclosed Safety Cage for ODU- Supplying, fabrication & fixing 3 Nos. M.S U-channel of 6mm thick of size (75mm X 40 mm X 40mm) of 1m length for making platform for installation of outdoor unit incl. drilling 2 nos holes in each channel including cutting holes into the wall & grouting the same with cement concrete (1:1 1/2:3) etc. fabricated with 2 Nos. horizontal angle of 25mm X 25mm X 5mm of 1m. length incl. S&F of enclosed safety cage (for ODU) made of angle (25 X 25 X 5 mm) and flat (25 X 5 mm) iron with necessary painting with 02 coat of R.O. primer (Asianpaint / Shalimer / Berger) incl. shade arrangement with corogated PVC shade with proper clamping arrangement incl. Cu Pipe Line Safety Grill Enclosure.
Supply & Fixing of perforated GI Cable tray with perforation not more than 17.5% suspended from ceiling incl. S&F GI connector, 6mm dia MS suspender, bolts & nuts, steel fastener etc. as required of the following size. Incl. A1 painting of MS support with 25x25x3mm angle iron support 300x50x1.25mm (18SWG) (for the protection of copper pipe)" fixing of ODU as per sight requirement direction of EIC. (Make-Bluestar/Emerson Copeland)
Supply,delivery and charging of Refrigerant Gas R-404A/R-407C
Cost of complete installation of the plant, including high-pressure dry nitrogen gas pressure testing and system vacuum testing, each for 48 hours, commissioning, and performance testing to ensure proper functionality and maintenance of the desired temperature, complete in all respects.
Cost of laying suction line, discharge line, and condenser-to-receiver pipeline using copper pipes of various sizes and types, including supply and installation of switches, expansion valve, solenoid valve, ball valve, hand shut-off valve, drier, and necessary brass flare nuts, along with insulation of the suction line all complete as per the direction of the Engineer-in-Charge.
Supply, providing and laying of 60 mm thick PUF insulation board within the chamber floor, including necessary wooden framework using 2” x 1½” wood sections fixed with thick cardio coat adhesive solution. The insulation shall be finished with ½” thick cement plaster reinforced with GI mesh wire net, bolts, ‘U’ hooks, stainless steel screws, and nails. After placement of the PUF insulation, the chamber floor shall be completed with thick cement concrete casting over a sand-cement base, finished with neat cement topping and proper drainage arrangement — all complete as per direction.
Supply, Installation, Testing & Commissioning of Centrifugal Humidifier Technical Specification:- Working Principle: Centrifugal Particle Size: 5-10 Micron Power Supply: Single Phase, 220-240 VAC/50 Hz Operating Temp.: 5-45 °C. Humidification/Misting Capacity: 7-8 L/H Power Input: 70 Watts Water Connection: 0.5 Inch (<5 Kg/Cm2). Area Coverage: 600-800 Sq.ft. (Cold Storage application) (Make:- As per the choice of EIC)
ANIKET COOLING AND REFRIGERATION CO (BID ID -6767475)
Shinryo Suvidha Engineers India Pvt. Ltd. (BID ID -6765813)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .