| 1 | L1₹33.7 LAccepted-AOC DEEDAR MARKET ROOM NO UB 12 POLICE BAZAR SHILLONG 793001 | EAST KHASI HILLS | MEGHALAYA | 793001 | ₹33.7 L Quoted ₹34.0 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹37.7 L+₹3.7 L (10.8%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹37.7 L+₹3.7 L (10.8%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹38.3 L+₹4.2 L (12.4%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹38.3 L+₹4.2 L (12.4%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹43.6 L+₹9.6 L (28.2%)Rejected-Finance C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | ₹43.6 L+₹9.6 L (28.2%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹48.9 L+₹14.9 L (43.7%)Rejected-Finance C O GIVEN GOD NONGTDAU ARBUTHNOT ROAD NONGRIMMAW LAITUMKHRAH SHILLONG PIN 793011 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793011 | ₹48.9 L+₹14.9 L (43.7%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S BISWA CONSTRUCTION L2 | Bhuiya Construction L4 | M/S RAGHU NATH SAH L6 | H K Enterprise L1 | M/s J. C. CONSTRUCTION L5 | MAHINDER ELECTRICALS L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Brickwork or stone/ boulder masonry, including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles built in cement mortar complete all as directed by Engineer-in-Charge. | 4 | Cubic Meter | 600 ₹2,400 | 1,000 ₹4,000 | 650 ₹2,600 | 350 ₹1,400 Lowest | 1,200 ₹4,800 | 1,000 ₹4,000 |
| 2.00 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 20 | Cubic Meter | 600 ₹12,000 | 1,100 ₹22,000 | 650 ₹13,000 | 300 ₹6,000 Lowest | 1,300 ₹26,000 | 1,000 ₹20,000 |
| 3.00 | Demolition of reinforced cement concrete of any description and in any position complete all as specified. | 3 | Cubic Meter | 900 ₹2,700 | 1,200 ₹3,600 | 650 ₹1,950 | 600 ₹1,800 Lowest | 1,400 ₹4,200 | 1,000 ₹3,000 |
| 4.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as directed by Engineer-In-Charge. | 8 | Quintal | 1,000 ₹8,000 | 700 ₹5,600 | 750 ₹6,000 | 580 ₹4,640 Lowest | 700 ₹5,600 | 1,000 ₹8,000 |
| 5.00 | Taking up or down water tubing 15 mm bore from trenches/wall, ceiling or floors including all fittings, segregated and stacking the pipe complete all as specified. | 150 | Running Meter | 20 ₹3,000 | 50 ₹7,500 | 20 ₹3,000 | 15 ₹2,250 Lowest | 60 ₹9,000 | 50 ₹7,500 |
| 6.00 | Taking up or down water tubing 20 mm bore from trenches/wall, ceiling or floors including all fittings, segregated and stacking the pipe complete all as specified. | 30 | Running Meter | 20 ₹600 Lowest | 50 ₹1,500 | 25 ₹750 | 20 ₹600 Lowest | 60 ₹1,800 | 50 ₹1,500 |
| 7.00 | Dismantling boarding, any description, fixed in any position with nails complete all as directed. | 113 | Square Meter | 50 ₹5,650 | 20 ₹2,260 | 45 ₹5,085 | 10 ₹1,130 Lowest | 30 ₹3,390 | 50 ₹5,650 |
| 8.00 | Taking down chowkhats with shutters (without taking off shutters from the frames) & removing from site area n.exc 1.5 Sqm each complete all as directed. | 30 | Each | 200 ₹6,000 | 200 ₹6,000 | 90 ₹2,700 Lowest | 90 ₹2,700 Lowest | 300 ₹9,000 | 100 ₹3,000 |
| 9.00 | Dismantling timber scantlings 40 sqcm and over in section for unframed work, in any position all as directed. | 1.5 | Cubic Meter | 5,000 ₹7,500 | 900 ₹1,350 | 900 ₹1,350 | 400 ₹600 Lowest | 1,000 ₹1,500 | 5,000 ₹7,500 |
| 10.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises all as directed by Engr- In- Charge. | 1,240 | Square Meter | 40 ₹49,600 | 50 ₹62,000 | 30 ₹37,200 | 20 ₹24,800 Lowest | 60 ₹74,400 | 50 ₹62,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
20 Jul 2026, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR OR REPLACEMENT TO KITCHEN SLABS, FLOOR OR WALL TILES WOODEN RAILINGS, KOTA STONE, GRANITE, WINDOWS AND VENTILATORS OF KITCHEN AND BATHROOMS AND ALLIED MAINTENANCE AT AF STATION LAITKOR PEAK UNDER GE (I) (AF) SHILLONG
2026_MES_772649_1
8057/26/E8
Open Tender
Civil Works
Item Rate
180 days
GE (I) (AF) Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (I) (AF) Shillong
₹90,000
Yes
26 Aug 2026
17 Jun 2026
22 Jul 2026
17 Jun 2026
20 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Brickwork or stone/ boulder masonry, including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles built in cement mortar complete all as directed by Engineer-in-Charge. | 4 | Cubic Meter | - | - |
| 2 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 20 | Cubic Meter | - | - |
| 3 | Demolition of reinforced cement concrete of any description and in any position complete all as specified. | 3 | Cubic Meter | - | - |
| 4 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as directed by Engineer-In-Charge. | 8 | Quintal | - | - |
| 5 | Taking up or down water tubing 15 mm bore from trenches/wall, ceiling or floors including all fittings, segregated and stacking the pipe complete all as specified. | 150 | Running Meter | - | - |
| 6 | Taking up or down water tubing 20 mm bore from trenches/wall, ceiling or floors including all fittings, segregated and stacking the pipe complete all as specified. | 30 | Running Meter | - | - |
| 7 | Dismantling boarding, any description, fixed in any position with nails complete all as directed. | 113 | Square Meter | - | - |
| 8 | Taking down chowkhats with shutters (without taking off shutters from the frames) & removing from site area n.exc 1.5 Sqm each complete all as directed. | 30 | Each | - | - |
| 9 | Dismantling timber scantlings 40 sqcm and over in section for unframed work, in any position all as directed. | 1.5 | Cubic Meter | - | - |
| 10 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises all as directed by Engr- In- Charge. | 1,240 | Square Meter | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tender8057.pdf
Tender Documents • 1.21 MB
BOQ_865186.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .