Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹45,736.68 (0.18%)Admitted-Finance | ₹2.5 Cr+₹45,736.68 (0.18%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sree Ganesh Asphalts L1 | K REVATHI L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 3,816 | sqm | - | - |
| 2.00Construction of Granular Sub Base by provinding well graded material and spreading in uniform layers with tractor with grader on prepared suface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of th specification and thickness as per approved plans or as directed by the engineer as per Gr - I | |||||
| 3.00 | Km 0/0 - 1/00 | 825 | cum | - | - |
| 4.00 | Km 1/0- 2/0 | 825 | cum | - | - |
| 5.00 | Km 2/0 - 2/544 | 448.8 | cum | - | - |
| 6.00 | Providing & laying spreading & compacting graded stone aggeragate to Wet Mix Macadam specification including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by Tipper to site laying and in Uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired as per MOTH Specification 406 IV revision Km 0/0 - 2/544 | 3,498 | cum | - | - |
| 7.00 | Applying primer coat over the WMM suface using with Emulsion bitumen binder 7.0 Kg/10 sq.m including cost & conveyance of all materials and all labour charges Km 0/0 - 2/544 | 13,992 | sqm | - | - |
| 8.00 | Providing and laying 90MM consolidated thickness of Bituminous Macadam which work shall consist of construction, used crushed aggregates (table 500-10) premixed with VG 30 grade bitumen at the rate of minimum 4.50% by weight of the total mix confirming to the aggregates and binder as per the job mix foumula in the Hot mix plant, transporiting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in coorodance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for DBM Grade 2 as per MORTH No.111, 114, 505, 900 | 1,259.28 | cum | - | - |
| 9.00Providing and laying Gravel to 100mm compacted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading watering and compacting by power roller to achieve the required Proctor density at 100% compaction | |||||
| 10.00 | Km 0/0 - 1/00 | 150 | cum | - | - |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
26 Mar 2020, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Improvements to the road from Pinayur - Thirumukudal Road to Thirumukudal Village Road Km 0/0 - 2/544 in Pinayur Panchayat in Uthiramerur Block of Kancheepuram District under Pradhan Mantri Khanij Kshetra Kalyan Yojana (PMKKKY)
2020_RDTN_160894_1
DIPR/1320/Tenders/2020, dt.11.03.2020,
Open Tender
Civil Works - Roads
Item Rate
180 days
Uthiramerur Block
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹2.5 L
O/o The Project Director DRDA Kancheepuram
3 Apr 2020
20 Mar 2020
26 Mar 2020
20 Mar 2020
26 Mar 2020
20 Mar 2020
23 Mar 2020
Amount
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Construction of Granular Sub Base by provinding well graded material and spreading in uniform layers with tractor with grader on prepared suface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of th specification and thickness as per approved plans or as directed by the engineer as per Gr - I
Providing & laying spreading & compacting graded stone aggeragate to Wet Mix Macadam specification including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by Tipper to site laying and in Uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired as per MOTH Specification 406 IV revision Km 0/0 - 2/544
Applying primer coat over the WMM suface using with Emulsion bitumen binder 7.0 Kg/10 sq.m including cost & conveyance of all materials and all labour charges Km 0/0 - 2/544
Providing and laying 90MM consolidated thickness of Bituminous Macadam which work shall consist of construction, used crushed aggregates (table 500-10) premixed with VG 30 grade bitumen at the rate of minimum 4.50% by weight of the total mix confirming to the aggregates and binder as per the job mix foumula in the Hot mix plant, transporiting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in coorodance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for DBM Grade 2 as per MORTH No.111, 114, 505, 900
Providing and laying Gravel to 100mm compacted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading watering and compacting by power roller to achieve the required Proctor density at 100% compaction
Providing and laying Bituminous Concrete 40mm thick which work shall consist of construction using coarse aggegates ( Table 500-17) premixed with VG 30 Grade Bitumen at the rate of minimum 5.40 % by weight of the total mix confirming to the aggregates and binder as per the job mix foumula in the Hot mix plant transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directd by the Engineer for BC ( Grade-II) as per MORTH no. 11, 112, 507, 900.
Supplying and fixing of KM stone of size 1.65x0.45x0.15 m including cost and conveyance and all other labour charges etc., complete
Supplying and fixing of HM stone of size 0.75x0.23x0.10 m including cost and conveyance and all other labour charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K REVATHI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Price.pdf
Additional Documents • 0.49 MB
Tech_.pdf
Tender Documents • 0.50 MB
BOQ_192519.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .