Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 CrAdmitted-Finance | ₹39.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹42.7 Cr+₹3.7 Cr (9.43%)Admitted-Finance PLOT NO B1 INFOCITY 122004 | REWARI | REWARI | HARYANA | 122004 | ₹42.7 Cr+₹3.7 Cr (9.43%) | L2 | Admitted-Finance |
| 3 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical EMD not valid |
| Sl No | Description | Qty | Unit | J.P. Associates L1 | Subhash Infraengineers Private Limited L2 |
|---|---|---|---|---|---|
| 10.00Excavation in cutting to all depths with | |||||
| 10.00 | Excavation in cutting to all depths with | 3,75,022 | M3 | 245 ₹10,84,18,860.2 Lowest | 306 ₹13,54,12,943.76 |
| 20.00Providing and constructing rock toe | |||||
| 20.00 | Providing and constructing rock toe in e | 1,450 | M | 2,080 ₹35,58,880 Lowest | 2,200 ₹37,64,200 |
| 30.00Providing and filling in cut-off trench | |||||
| 30.00 | Providing and filling in cut-off trench | 8,575 | M3 | 650 ₹65,77,025 | 500 ₹50,59,250 Lowest |
| 40.00Earth work for embankments in hearting o | |||||
| 40.00 | Earth work for embankments in hearting | 1,30,438 | M3 | 350 ₹5,38,70,894 Lowest | 450 ₹6,92,62,578 |
| 50.00Preparing foundation bed for cut-off tre | |||||
| 50.00 | Preparing foundation bed for cut-off tre | 3,73,332 | M3 | 20 ₹88,10,635.2 Lowest | 30 ₹1,32,15,952.8 |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
11 Jun 2026, 3:00 pmClosed
Neeta Baranwal
Neeta Baranwal
CIVIL WORKS OF INSTALLATION OF 25 MWh SURFACE HYDRO-KINETIC PUMP STORAGE PLANT AT NTPC RAMAGUNDAM
2026_NTPCR_107110_1
RE-CS-9900323739
Open Tender
Civil Works
Works
365 days
Ramagundam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20 L
19 Aug 2026
13 Apr 2026
12 Jun 2026
13 Apr 2026
11 Jun 2026
13 Apr 2026
13 Apr 2026 - 20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 10Excavation in cutting to all depths with | |||||
| 10.0001 | Excavation in cutting to all depths with | 0.58 | M3 | - | - |
| 20Providing and constructing rock toe | |||||
| 20.0001 | Providing and constructing rock toe in e | - | M | - | - |
| 30Providing and filling in cut-off trench | |||||
| 30.0001 | Providing and filling in cut-off trench | - | M3 | - | - |
| 40Earth work for embankments in hearting o | |||||
| 40.0001 | Earth work for embankments in hearting | 0.29 | M3 | - | - |
| 50Preparing foundation bed for cut-off tre | |||||
| 50.0001 | Preparing foundation bed for cut-off tre | 0.58 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Technicalspecifications.pdf
Tender Documents • 3.11 MB
Biddocument.pdf
Tender Documents • 16.94 MB
TechnicalDrawingsn.pdf
Tender Documents • 17.57 MB
BOQ_110348.xls
BOQ • 0.31 MB
SOQ.pdf
Additional Documents • 0.58 MB
TechnicalAmdt02.pdf
PDF • 2.40 MB
Techicalclr02.pdf
PDF • 2.47 MB
GePNICupload.pdf
PDF • 0.03 MB
GePNICupload.pdf
PDF • 0.03 MB
Clr01biddingdocument.pdf
PDF • 0.37 MB
TechnicalAmdt.pdf
PDF • 6.01 MB
GePNICupload.pdf
PDF • 0.03 MB
GePNICupload.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .