Tender Value
₹27.6 L
EMD Value
₹55,230
Closing Date
24 Aug 2026, 9:00 amDue today
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
Construction of Foot path from Bharari Auckland School Junction road to Hotel Ashirwad Shimla. (SH Demolishing work, steel work etc.)
2026_PWD_141296_3
SD-III-2026-8330-46dt.12-8-26
Open Tender
Civil Works - Buildings
Percentage
30 days
IGMC
As per SBD
11 documents required · 11 mandatory
₹2,000
₹55,230
15 Aug 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 11.44 | Per Cubic Meter | 975 | ₹11,151.56 |
| 2 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats | 1,321.12 | Per/kilogramme | 4 | ₹5,284.48 |
| 3 | Disposal of building rubish / mablba / simialr un servisble, dismentled and waste material by mechanical mean including loading, transporting, unloading to approved MC dumping ground or as approved by engineer in charge including manuall inital lead including all leads and lifts involved. | 30.34 | Per Cubic Meter | 636 | ₹19,294.65 |
| 4 | Excavation work by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | 18.9 | Per Cubic Meter | 212 | ₹4,006.8 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete complete including carriage of materials within all leads and lifts. | 42 | Per Square Meter | 229 | ₹9,618 |
| 6 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.complete including carriage of materials within all leads and lifts. | 14 | Per Square Meter | 297 | ₹4,158 |
| 7 | Columns, Pillars, Piers, Abutments, Posts and Struts complete including carriage of materials within all leads and lifts. | 7.44 | Per Square Meter | 297 | ₹2,209.68 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 2 | Per Cubic Meter | 2,924 | ₹5,861.89 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) | 18.9 | Per Cubic Meter | 4,661 | ₹88,092.9 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 9 | Per Cubic Meter | 5,508 | ₹49,572 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_209762.xls
BOQ • 0.40 MB
SBD2761315.pdf
Tender Documents • 5.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].