Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance Qualified. |
| 2 | L2₹1.1 CrAccepted-Finance BENGALURU KARNATAKA | BENGALURU | KARNATAKA | ₹1.1 Cr | L2 | Accepted-Finance Qualified. |
| 3 | L3₹1.1 CrAccepted-Finance 233 PLATINUM PLAZA OPP IOCL PUMP NR JUDGES BUNGLOW CROSS ROAD BODAKDEV AHMEDABAD GUJARAT 380054 | AHMADABAD | GUJARAT | 380054 | ₹1.1 Cr | L3 | Accepted-Finance Qualified. |
| Sl No | Description | Qty | Unit | Dubas Engineering Pvt Ltd L2 | EVERCREST PROJECTS PVT LTD. L3 | ASIAN CONTROL SYSTEM L1 |
|---|---|---|---|---|---|---|
| 1.00Design, fabrication, assembly, inspection, factory testing, packing, delivery, site installation & testing and commissioning of 2 X 20 kVA Inverters (Master & Hot standby) of 110 VDC input and 415 VAC 3 phase output as per tender specifications. | ||||||
| 1.10 | Supply | 2 | Nos | 73,20,000 ₹86.4 L | 76,97,000 ₹90.8 L | 74,43,650 ₹87.8 L |
| 1.20 | Installation | 2 | Nos | 3,28,000 ₹3.9 L | 2,86,000 ₹3.4 L | 2,76,000 ₹3.3 L |
| 2.00Supply, installation, testing and laying of 4C, 16 sq. mm, copper conductor, XLPE insulated, galvanised steel strip armoured, FRLS cable. | ||||||
| 2.10 | supply | 500 | M | 6,47,000 ₹7.6 L | 5,93,500 ₹7.0 L | 5,85,000 ₹6.9 L |
| 2.20 | Installation | 500 | M | 67,500 ₹79,650 | 47,000 ₹55,460 | 45,000 ₹53,100 |
| 3.00Supply, installation, testing and laying of 4C, 6 sq. mm, copper conductor, XLPE insulated, galvanised steel strip armoured, FRLS cable. | ||||||
| 3.10 | supply | 500 | M | 2,85,000 ₹3.4 L | 2,32,000 ₹2.7 L | 2,30,000 ₹2.7 L |
| 3.20 | Installation | 500 | M | 48,000 ₹56,640 | 37,500 ₹44,250 | 40,000 ₹47,200 |
| 4.00Supply,installation 1 pole MCBs (2A/4A/6A) as per tender specifications. | ||||||
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
6 Dec 2025, 3:00 pmClosed
AD RG CE
Dhruva Complex
Supply, installation, testing and commissioning of two sets of 2 x 20 kVA Inverters as per technical specifications in RG facility trombay
2025_BARC_880699_1
BARC/RRMD/ET/7/2025-2026 Date 10/11/2025
Open Tender
Electrical Works
270 days
Apsara-U
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.0 L
Yes
Dhruva Complex
23 Jan 2026
18 Nov 2025
10 Dec 2025
18 Nov 2025
6 Dec 2025
27 Nov 2025
24 Nov 2025
Design, fabrication, assembly, inspection, factory testing, packing, delivery, site installation & testing and commissioning of 2 X 20 kVA Inverters (Master & Hot standby) of 110 VDC input and 415 VAC 3 phase output as per tender specifications.
Supply
Installation
Supply, installation, testing and laying of 4C, 16 sq. mm, copper conductor, XLPE insulated, galvanised steel strip armoured, FRLS cable.
supply
Installation
Supply, installation, testing and laying of 4C, 6 sq. mm, copper conductor, XLPE insulated, galvanised steel strip armoured, FRLS cable.
supply
Installation
Supply,installation 1 pole MCBs (2A/4A/6A) as per tender specifications.
Supply
Installation
Supply,installation 4 pole MCBs (16 A) as per tender specifications.
Supply
Installation
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tendernotice_2.pdf
PDF • 1.43 MB
TechnicalBid.xls
Additional Documents • 0.10 MB
TenderDocument.pdf
Tender Documents • 3.22 MB
BOQ_931279.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid