Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-AOC NO 2 215 NEAR WATER TANK MELA STREET THUVAKUDI TRICHY 620 015 | TIRUCHIRAPPALLI | TAMIL NADU | 620015 | L1 | Accepted-AOC Lowest Rate tender | |
| 2 | L2₹22.3 L+₹10,472.38 (0.47%)Rejected-AOC LIG 11 997 | ERODE | TAMIL NADU | 638001 | L2 | Rejected-AOC Highest rate tender |
| Sl No | Description | Qty | Unit | M SHANMUGAM L1 | SUSHMANITICONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils to the required depth (Including Refilling)
a. 0 to 2m depth. | 8.4 | 1 Cum | 279 ₹2,343.6 Lowest | 283 ₹2,377.2 |
| 2.00 | Supplying and filling in foundation and basement with Stone dust in layers of 150 mm thickness | 55.2 | 1 Cum | 265 ₹14,628 Lowest | 270 ₹14,904 |
| 3.00 | Supplying and filling in foundation and basement with quarry rubbish in layers of 150 mm thickness | 432.8 | 1 Cum | 222 ₹96,081.6 Lowest | 225 ₹97,380 |
| 4.00 | Plain cement concrete 1:5:10 (One of cement, five of crushed stone sand and ten of hard broken stone Jelly) including Mortar Plasticizer (Liquid) for foundation and basement | 81.3 | 1 Cum | 5,240 ₹4,26,012 Lowest | 5,242 ₹4,26,174.6 |
| 5.00 | Plain cement concrete 1:3:6 (one of cement, three of crushed stone sand and six of hard broken stone jelly including Mortar Plasticizer (Liquid) for foundation using 20mm gauge HBSJ | 21.1 | 1 Cum | 6,175 ₹1,30,292.5 Lowest | 6,179 ₹1,30,376.9 |
| 6.00 | Plain cement concrete 1:2:4 (One of cement two of crushed stone sand and four of Hard Broken Stone jelly) (including Mortar Plasticizer (Liquid) using 20mm gauge HBSJ | 78.5 | 1 Cum | 6,750 ₹5,29,875 Lowest | 6,756 ₹5,30,346 |
| 7.00 | Brick work in CM 1:5 (One of cement and five of crushed stone sand including Mortar Plasticizer (Liquid) using chamber burnt bricks of size 23x11.4x7.5 cm in Foundation and Basement | 3.3 | 1 Sqm | 7,150 ₹23,595 Lowest | 7,151 ₹23,598.3 |
| 8.00 | Supplying, fabricating and placing in position of Mild steel Grills / Ribbed Tor Steels (without cement slurry) of all diameters | 2.18 | 1 MT | 91,000 ₹1,98,016 Lowest | 92,000 ₹2,00,192 |
| 9.00 | Providing Form work and centering for RCC works including supports and strutting up to 3.30m ht
a. For Column footings, plinth & Grade beam, Raft beam & slab | 3.3 | 1 Sqm | 975 ₹3,217.5 Lowest | 985 ₹3,250.5 |
| 10.00 | d. For Vertical walls | 138 | 1 Sqm | 1,190 ₹1,64,220 Lowest | 1,200 ₹1,65,600 |
Tender Value
Refer Docs
EMD Value
₹21,200
Closing Date
28 Aug 2026, 5:00 pmClosed
Executive Engineer
No.55/1, Inspector Quarters, TSP II Battalion, Avadi, Chennai-54
Providing Approach road, Drying yard and Rest room cupboard arrangement for the Construction of Fire and Rescue Service Station building with development works at Cheyyur in Chengalpattu District
2026_TNPHC_696222_1
EE/Ch.Dn-II/Db/1922/2026
Open Tender
Civil Works
Lump-sum
90 days
Cheyyur, Chengalpattu District
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹21,200
5 Sept 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub-soils to the required depth (Including Refilling)
a. 0 to 2m depth. | 8.4 | 1 Cum | 279.06 | ₹2,344.1 |
| 2 | Supplying and filling in foundation and basement with Stone dust in layers of 150 mm thickness | 55.2 | 1 Cum | 266.55 | ₹14,713.56 |
| 3 | Supplying and filling in foundation and basement with quarry rubbish in layers of 150 mm thickness | 432.8 | 1 Cum | 223.3 | ₹96,644.24 |
| 4 | Plain cement concrete 1:5:10 (One of cement, five of crushed stone sand and ten of hard broken stone Jelly) including Mortar Plasticizer (Liquid) for foundation and basement | 81.3 | 1 Cum | 5,240.62 | ₹4,26,062.41 |
| 5 | Plain cement concrete 1:3:6 (one of cement, three of crushed stone sand and six of hard broken stone jelly including Mortar Plasticizer (Liquid) for foundation using 20mm gauge HBSJ | 21.1 | 1 Cum | 6,179.66 | ₹1,30,390.83 |
| 6 | Plain cement concrete 1:2:4 (One of cement two of crushed stone sand and four of Hard Broken Stone jelly) (including Mortar Plasticizer (Liquid) using 20mm gauge HBSJ | 78.5 | 1 Cum | 6,752.06 | ₹5,30,036.71 |
| 7 | Brick work in CM 1:5 (One of cement and five of crushed stone sand including Mortar Plasticizer (Liquid) using chamber burnt bricks of size 23x11.4x7.5 cm in Foundation and Basement | 3.3 | 1 Sqm | 7,167.46 | ₹23,652.62 |
| 8 | Supplying, fabricating and placing in position of Mild steel Grills / Ribbed Tor Steels (without cement slurry) of all diameters | 2.18 | 1 MT | 92,009.29 | ₹2,00,212.22 |
| 9 | Providing Form work and centering for RCC works including supports and strutting up to 3.30m ht
a. For Column footings, plinth & Grade beam, Raft beam & slab | 3.3 | 1 Sqm | 981.94 | ₹3,240.4 |
| 10 | d. For Vertical walls | 138 | 1 Sqm | 1,198 | ₹1,65,324 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_837034.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
RoadDryingCheyyurFRS.pdf
Tender Documents • 4.99 MB
BOQ_837034.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .