All Bids
RequiredDuly filled and signed Format IIIA
RequiredTo quote minimum 20 percent quantity.
Required2% Bid Security paid in favour of Pay Officer TGNPDCL HNK in the form of DD OR in favour of CE,P&MM, TGNPDCL, HNK in the form of Bank Guarantee on Non judicial Stamp paper of value of Rs.200/- bond paper valid up to 6 months from the date of Opening of Technical Bid.
RequiredCopies of previous Purchase Orders invoices and other documents
RequiredList of past supplies and Performance Certificates attested by Gazetted Officer or Authorized Notary
RequiredGST returns and Income Tax Clearance Certificate for the latest Financial Year
RequiredSchedule A to H
RequiredAttested Copies of GST Reg. No and PAN No.
RequiredThe bidders financial turnover during any one year of the last five years should have been equal or more than 100% value of the material now quoted. The qualification requirements of principal manufacturer will be considered for evaluation.
RequiredSelf Declaration about black listing debarring of the firm by any utility
RequiredThe relationship with any TRANSCO/DISCOM employee must be disclosed by the bidders
RequiredGuaranteed Technical Particulars
Requireda) CRPs with IEDs/BCPUs for 33/11KV or above voltage class: (i) Must have designed, manufactured, tested and supplied at least 40% of the quoted CRPs with IEDs/BCPUs quantity in last 15 years as on the date of bid opening and at least 20% of the quoted quantity should be to power utilities and in successful operation for at least 12 months. The performance certificate from utility (DISCOM/Trans
Requireda) CRPs with IEDs/BCPUs for 33/11KV or above voltage class: (ii) The equipment shall be type tested in a NABL accredited lab/KEMA as per the relevant IS/IEC with latest amendments thereof. The type test certificate shall be submitted along with the bid and should not be more than 15 years old.
RequiredThe IEDs/BCPUs, and RTU shall be supplied from same manufacturer. The bidder shall submit the MAF (Manufacturers Authorization Form) mandatorily from manufacturer duly signed by concerned Power of Attorney. The bid is liable for rejection in absence of MAF.
RequiredThe protection relay shall be compliant to Security Assurance Level 1 (SL1) with the 3rd party certified for IEC 62443-4-1 for relays and IEC 62443-4-2 for RTU.(Compliancy certificate from 3rd party should be submitted).
Requiredv). The awarded bidder/ bidders should provide necessary product specific training to TGNPDCL team for installation, commissioning and integration to SCADA system
RequiredAll bids submitted will also include the following information: i. Copies of original documents defining the constitution or legal status, place of registration and principle place of business of the company or firm or partnership, etc.,
Requiredii. The bidder should furnish a brief write-up, backed with adequate data, explaining his available capacity and experience (both technical and commercial) for the manufacture and supply of the required equipment within the specified time of completion after meeting all their current commitments.
Requirediii. The bidder should clearly confirm that all the facilities exist in his factory for inspection and testing and these will be made available to the purchaser or his representative for inspection.
Requirediv. Reports on financial standing of the Bidder such as profit and loss statement, balance sheets and auditor?s report for the past five years, bankers certificates etc.
RequiredA sample CRPs with IEDs/BCPUs for 33/11KV voltage class shall be supplied by the firm along with Bid and shall demonstrate the functionally in field.The price bids of the bidders whose sample MCRPs with IED/BCPU for 33/11KV voltage class in the field is found suitable will only be opened.
RequiredThe bidder will furnish Type Test Results. The type tests must have been conducted on the material offered as per the relevant IS in KEMA/NABL laboratory, as per the latest revision of the Technical Specification and the date of Type tests will not be later than 15 years if there is no change in design criteria.
RequiredThe Bids received without type test reports will be treated as Non-Responsive. If any change in design was made latest type tests shall be furnished along with approved drawing.