Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC LOHAR GALLI JUNA MONDHA NANDED 431604 | NANDED | NANDED | MAHARASHTRA | 431604 | ₹9.6 L | L1 | Accepted-AOC Work order issued |
| 2 | L2₹9.7 LRejected-AOC | ₹9.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹10.1 LRejected-AOC | ₹10.1 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Anush Electricals Aurangabad L3 | M/S ROHIT ELECTRICALS L1 | Seva Electricals L2 |
|---|---|---|---|---|---|---|
| 1.00M and R to Nanded and Krushnoor W.S.S. Supply of spares for raw water pumping machinery installed at Jackwell Asarjan | ||||||
| 1.01 | Supply of SS410 Sleeves for 100 HP VT Pump | 15 | Number | 15,000 ₹2.3 L | 14,700 ₹2.2 L | 15,000 ₹2.3 L |
| 2.00 | Supply of SS410 coupling for 100 HP VT pump | 15 | Number | 17,500 ₹2.6 L | 11,950 ₹1.8 L | 12,070 ₹1.8 L |
| 3.00 | Supply of rubber bearing retainer(spider) for 100 HP VT Pump | 15 | Number | 26,800 ₹4.0 L | 27,300 ₹4.1 L | 7,500 ₹1.1 L |
| 4.00Change Over Switch, SDF (SW-SWR) | ||||||
| 4.10 | Supplying and erecting ON LOAD automatic transfer switch 4 pole, 415V, 160A, 50 Hz with enclosure, flexibility of neutral connection, line and load reversibility, changeover with phase barriers, source separator, terminal covers along with staggered termination for cable connection and ATS controller with provision of time delay protection of OV, UV, phase sequence changing, single phasing and event logging, connected with provided leads complete complying to IS/IEC 60947-3 Part-1/6 as per specification no. SW-SWR/ATS. | 3 | each | 41,000 ₹1.2 L | 50,800 ₹1.5 L | 1,50,000 ₹4.5 L |
Tender Value
₹9.7 L
EMD Value
₹9,700
Closing Date
16 Apr 2026, 11:00 amClosed
Superintending Engineer
Superintending Engineer, MIDC Zone, Chhatrapati Sambhajinagar
MIDC has developed 13.5 MLD water supply scheme to cater water in Nanded and Krushnoor industrial area. Under water supply scheme to lift the raw water 100 HP VT Pumps are installed at Jackwell
2026_MIDC_1293999_1
EENND/selected/2026-27/03
Limited
Civil Works - Water Works
45 days
Jackwell Asarjan
Reg. electrical contractors experience of any electrical work costing not less than Rs. 4.84 lakhs in any Govt. Semi Govt. signed by an officer not below the rank of Ex. Eng.
2 documents required · 2 mandatory
₹4,720
₹9,700
29 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
16 Apr 2026
11 Apr 2026
10 Apr 2026 - 11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1M and R to Nanded and Krushnoor W.S.S. Supply of spares for raw water pumping machinery installed at Jackwell Asarjan | ||||||
| 1.01 | Supply of SS410 Sleeves for 100 HP VT Pump | - | Number | - | - | itemH1Code1 |
| 2Supply of SS410 coupling for 100 HP VT pump | ||||||
| 3Supply of rubber bearing retainer(spider) for 100 HP VT Pump | ||||||
| 4Change Over Switch, SDF (SW-SWR) | ||||||
| 4.1 | Supplying and erecting ON LOAD automatic transfer switch 4 pole, 415V, 160A, 50 Hz with enclosure, flexibility of neutral connection, line and load reversibility, changeover with phase barriers, source separator, terminal covers along with staggered termination for cable connection and ATS controller with provision of time delay protection of OV, UV, phase sequence changing, single phasing and event logging, connected with provided leads complete complying to IS/IEC 60947-3 Part-1/6 as per specification no. SW-SWR/ATS. | - | each | - | - | itemH2Code1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
ItemSpecification.pdf
Other Document • 0.00 MB
TenderDocument.pdf
Tender Documents • 0.24 MB
BOQ_2223534.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid