| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC AT ROAD BOKAKHAT ASSAM | ₹2.5 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹2.5 Cr+₹0.01 (<0.01%)Rejected-Finance | ₹2.5 Cr+₹0.01 (<0.01%) | L2 | Rejected-Finance Not Admitted |
| 3 | L2₹2.5 Cr+₹0.01 (<0.01%)Rejected-Finance | ₹2.5 Cr+₹0.01 (<0.01%) | L2 | Rejected-Finance Not Admitted |
| 4 | L2₹2.5 Cr+₹0.01 (<0.01%)Rejected-Finance | ₹2.5 Cr+₹0.01 (<0.01%) | L2 | Rejected-Finance Not Admitted |
| 5 | L2₹2.5 Cr+₹0.01 (<0.01%)Rejected-Finance | ₹2.5 Cr+₹0.01 (<0.01%) | L2 | Rejected-Finance Not Admitted |
Tender Value
₹2.8 Cr
EMD Value
₹5.7 L
Closing Date
21 Oct 2021, 2:00 pmClosed
Chief Engineer(MI),Assam
O/o Chief Engineer(I),Assam,Ghy-03
INSTALLATION OF SOLAR POWERED TUBE WELL SCHEMES UNDER PRADHAN MANTRI KRISHI SINCHAI YOJANA_PMKSY_ HAR KHET KO PANI_HKKP_ACCESS TO GROUND WATER _PH-I_FOR THE YEAR 2019-20_BALANCE 65 PTS.
2021_ID_23091_1
06(PMKSY-HKKP) 2021-22 Dt. 29.09.2021
Open Tender
Civil Works
Item Rate
90 days
Jorhat
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,000
₹5.7 L
Yes
12 Nov 2021
30 Sept 2021
21 Oct 2021
30 Sept 2021
21 Oct 2021
1 Oct 2021
Amount
INSTALLATION OF TUBE WELL :
Preparation of site for placement of the drilling rig including excavation of mud pit, circulation drain, collection chamber etc. all complete as directed.
Movement of Rig from the Divisional Head Quarter to the drilling site including cost of P.O.L. all complete as directed.
Transportation of all ancillary equipments, camp materials, welding set, rig accessories etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of all store materials like pipes, strainer, cone, socket, clamp, bentonite etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of air compressor from the Divisional Head Quarter to the drilling site with all accessories including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of P.O.L. all complete as directed.
Construction of temporary accommodation and low cost sanitary facility for drilling staff including cost of camp materials viz. cots, tables, chairs, utensils, dresses, safety helmets etc. and dismantling the accommodation after completion of the work all complete as directed.
Providing water supply facilities at drilling site by tractor mounted water tank all complete as directed.(As per Approved Analysis)Maximum water required per boring =6000Ltr
Boring in soft soil / normal clay / sandy soil by bit of size either 5 5/8" or 6 7/8" or 7 7/8" and collecting sample of soil at every 3.0 m depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools / bentonite etc. and withdrawing the drill pipe for lowering well assembly etc all complete as directed.
Boring in hard soil / pebble / gravel by bit of size either 5 5/8"or 6 7/8" or 7 7/8" and collecting sample of soil at every 3.0 m depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools / bentonite etc. and withdrawing the drill pipe for lowering well assembly etc all complete as directed.
Reboring in soft soil / normal clay / sandy soil by bit of size either 8 1/2" or 9 5/8" or 12" from either 5 5/8" or 6 7/8" or 7 7/8" all complete as directed.
Reboring in hard soil / pebble / gravel by bit of size either 8 1/2" or 9 5/8" or 12" from either 5 5/8" or 6 7/8" or 7 7/8" all complete as directed.
Developing of the D.T.W. with air compressor, Make- Kirloskar / Cumins all complete as directed.
Supplying and packing pea gravel around the periphery of casing including screening, washing etc. all complete as directed.
Supply of Materials
150mm dia UPVC Casing Pipes (IS : 12818/1992)
100mm dia UPVC Casing Pipes (IS : 12818/1992)
100 mm dia UPVC Ribbed Screen Pipe
65mm Sluice Valve
100mm PVC Cone
100mm PVC End Cap
150 x 100 PVC Reducer
PVC Solvent Cement (500ml container)
PVC Solvent Cement (1000ml container)
Labour charge for sinking, lowering, fitting, fixing in position of 100 mm dia U.P.V.C. pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc. and supplying necessary jointing materials including carriage of materials and cleaning and priming the tube well all complete as directed. (a) For 0 to 50 m depth
Labour charge for sinking, lowering, fitting, fixing in position of 150 mm dia U.P.V.C. pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc. and supplying necessary jointing materials including carriage of materials and cleaning and priming the tube well all complete as directed. (a) For 0 to 50 m depth
Labour charge for providing bentonite clay packing (including the cost of bentonite clay) arround 150/200 mm dia tube well upto a depth of 6 m from top with 250 mm dia boring including supplying the bentonite clay and carriage of materials all complete as directed and specified.
Labour charge for installation of Submersible pump set including supplying, carrying, fitting and fixing suction pipes of required length with G.I. Specials such as socket, bend, G.I. flange, M.S. Clamps and necessary jointing materials including commissioning and testing the pump but excluding only the cost of column pipe all complete as required as directed (upto 30.00m depth) (b) (i) 65 mm dia column pipe upto 30 m depth
Supplying, fitting, fixing MS clamp of size 15 mm thick and 150 mm width having projection of 300 mm and three holes of 20 mm dia for clamping the plates by 16 mm dia hexagonal bolts of length 75 mm and nuts on both sides encircling the column pipe including two coat of enamel paint over one priming coat of different dia all complete as directed and specified. (b) 150 mm dia
Estimate for Installation and Commissioning of Electrical Power Plant
Supply & Installattion of 3 HP Submersible Electrical Pumpset working with Single phase Power Supply with 230 V ± 10% variation and Dynamic Head range 10 Metres to 20 Metres with minimum discharge capacity 400 LPM (0.0085 Cumec), efficiency 70% (Minimum) of repute make conforming to IS:8034-2002 suitable for 150mm dia Tubewell including all accessories like Motor Cable (2 ´ 4mm2) upto 50 Metre length, Column pipe of dia 100mm upto 18 Metres alongwith Cable Clamps/ Clip 10 Nos, Delivery Bend 1 No of 100 mm dia, Tubewell assembly support MS Clamp 100 mm dia-2 pairs etc. in complete as directed (Rates are as per Market price)
LT Electrical Power Connection:- LT Electrical Power connection to the Control Panel from the nearest point of LT overhead line owned by APDCL including supply and erection of service cable alongwith necessary supports like Poles, Insulators, Cross-arms etc. as required by the department under supervision of APDCl. The payment to APDCL for connection of 2.5 kW power shall be in the scope of the work (i) Supply and erection of 7.5 metre long PSC pole of standard dimension for 230 Volt overhead line including digging of Earth pit (0.75 m ´ 0.5 m) having a depth of 1/5th of the pole length with PCC Base Plate of size 60 cm ´ 60 cm ´ 12 cm at the bottom, refilling with boulder packing (size 150mm to 200 mm), refilling the voids with soil and hard ramming as directed.
(ii) Supply and erection GI Angle Cross Arm of size 50mm ´ 50mm ´ 6 mm ´ 600mm
(iii) Supply and erection of LT Pin Insulator 5 kN on existing GI Cross Arm with GI Pin, Nuts & Bolts with washer including drilling of holes as directed.
(iv) Supply, laying and erection of AAA Squirrel conductor for overhead line, binding to insulators and tensioning with uniform standard sag including jumpering, connection as directed.
(v) Supply, fitting & fixing of 2 Core ´ 6 mm2 for service connection from PSC Pole to Energy Meter and upto Control Panel
(vi) Supply, fitting & fixing of 2 Core ´ 6 mm2 for service connection from PSC Pole to Energy Meter and upto Control Panel
(vii) Supply, fitting & fixing of 2 Core ´ 6 mm2 for service connection from PSC Pole to Energy Meter and upto Control Panel
Supplying, erection, testing and commissioning Havells or equivalent make custom-built Control Panel, stand mounted, dust and vermin proof starter cum switching panel for operation of 3 HP, 230V, 1-Ph, 50 Hz Submersible Pump made up of CRCA steel sheet 1mm thick, having Iron Angle Stand made of 4 nos of 32mm ´ 32mm ´ 5 mm ´ 1 metre long iron angle, having provision for fitting the cubicle with proper size nuts & bolts and having a welded rain protecting canopy at the top and to be erected firmly with necessary CC grouting as directed. The cubicle size shall be 288mm ´ 242mm ´ 144mm and shall contain the following electrical accessories neatly wires with proper size single core HRFR unsheathed copper wire.[Rate as per departmentally approved] (All items shall conform to latest ISS/BIS) 1. 4 pole, 25 Amp, AC 3, Air break contactor 2. Thermal overload relay 3. Double pole MCB, C curve, 10 kA 4. Capacitor 50 mfd 5. Capacitor 36 mfd 6. Ampere + Volt analog meter 7. Heavy duty 25 Amp, ON push button switch 8. OFF push button switch 9. pilot indicating lamp
ESTIMATE FOR CONTROL PANEL Unit ( CE approved rate)
ESTIMATE FOR SOLAR POWERED TUBE WELL INSTALLATION OF TUBE WELL :
Preparation of site for placement of the drilling rig including excavation of mud pit, circulation drain, collection chamber etc. all complete as directed.
Movement of Rig from the Divisional Head Quarter to the drilling site including cost of P.O.L. all complete as directed.
Transportation of all ancillary equipments, camp materials, welding set, rig accessories etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of all store materials like pipes, strainer, cone, socket, clamp, bentonite etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of air compressor from the Divisional Head Quarter to the drilling site with all accessories including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of P.O.L. all complete as directed.
Construction of temporary accommodation and low cost sanitary facility for drilling staff including cost of camp materials viz. cots, tables, chairs, utensils, dresses, safety helmets etc. and dismantling the accommodation after completion of the work all complete as directed.
Providing water supply facilities at drilling site by tractor mounted water tank all complete as directed.(As per Approved Analysis)Maximum water required per boring =6000Ltr
Boring in soft soil / normal clay / sandy soil by bit of size either 5 5/8" or 6 7/8" or 7 7/8" and collecting sample of soil at every 3.0 m depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools / bentonite etc. and withdrawing the drill pipe for lowering well assembly etc all complete as directed.
Boring in hard soil / pebble / gravel by bit of size either 5 5/8"or 6 7/8" or 7 7/8" and collecting sample of soil at every 3.0 m depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools / bentonite etc. and withdrawing the drill pipe for lowering well assembly etc all complete as directed.
Reboring in soft soil / normal clay / sandy soil by bit of size either 8 1/2" or 9 5/8" or 12" from either 5 5/8" or 6 7/8" or 7 7/8" all complete as directed.
Reboring in hard soil / pebble / gravel by bit of size either 8 1/2" or 9 5/8" or 12" from either 5 5/8" or 6 7/8" or 7 7/8" all complete as directed.
Developing of the D.T.W. with air compressor, Make- Kirloskar / Cumins all complete as directed.
Supplying and packing pea gravel around the periphery of casing including screening, washing etc. all complete as directed.
Supply of Materials
150mm dia UPVC Casing Pipes (IS : 12818/1992)
100mm dia UPVC Casing Pipes (IS : 12818/1992)
100 mm dia UPVC Ribbed Screen Pipe
65mm Sluice Valve
100mm PVC Cone
100mm PVC End Cap
150 x 100 PVC Reducer
PVC Solvent Cement (500ml container)
PVC Solvent Cement (1000ml container)
Labour charge for sinking, lowering, fitting, fixing in position of 100 mm dia U.P.V.C. pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc. and supplying necessary jointing materials including carriage of materials and cleaning and priming the tube well all complete as directed. (a) For 0 to 50 m depth
Labour charge for sinking, lowering, fitting, fixing in position of 150 mm dia U.P.V.C. pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc. and supplying necessary jointing materials including carriage of materials and cleaning and priming the tube well all complete as directed. (a) For 0 to 50 m depth
Labour charge for providing bentonite clay packing (including the cost of bentonite clay) arround 150/200 mm dia tube well upto a depth of 6 m from top with 250 mm dia boring including supplying the bentonite clay and carriage of materials all complete as directed and specified.
Labour charge for installation of Submersible pump set including supplying, carrying, fitting and fixing suction pipes of required length with G.I. Specials such as socket, bend, G.I. flange, M.S. Clamps and necessary jointing materials including commissioning and testing the pump but excluding only the cost of column pipe all complete as required as directed (upto 30.00m depth) (b) (i) 65 mm dia column pipe upto 30 m depth
Supplying, fitting, fixing MS clamp of size 15 mm thick and 150 mm width having projection of 300 mm and three holes of 20 mm dia for clamping the plates by 16 mm dia hexagonal bolts of length 75 mm and nuts on both sides encircling the column pipe including two coat of enamel paint over one priming coat of different dia all complete as directed and specified. (b) 150 mm dia
Estimate for Installation and Commissioning of Solar Power Plant
Cost for Supply, Installation & commissioning of Solar Photovoltaic Power Plant for energizing the 3HP submersible pump set with solar pump, panel mounting structures etc. SPV Module 3 KW, Solar Pump Controller Unit, cables, including LT panel, earthing and lighting arrestor etc. 3.0 HP SPV Module for 3 HP Pump As per MNRE benchmark cost ( MNRE Notification No. 30/11/2012-13/NSM )Work as per the MNRE norms and with following instructions as per direction of the department : (1) Supply, installation and commissioning of Solar PV for water pumping system consisting of solar panels framed in anodized aluminium frame mounted on stable hot dipped galvanized ( min 80 micron thickness) mild steel structure of rectangular hollow sections, angles, heavy duty pipes (all materials duly IS marked ) for providing sufficient strength with dual axis manual tracking arrangement which can withstand load of modules and high wind velocities upto 150 Km/hr, having RCC foundation designed against all possible loads (Dead, Live and imposed load). Modules supplied with the SPV system should have certificate as per IEC 61215 specification or equivalent National or International standards and must be interconnected with cables of required specification routed in PVC conduits properly fitted along the G.I structure to provide a good aesthetic view. Modules must qualify to IEC 61730 part I and part II for safety qualification testing. The power output of individual PV modules used in the PV array, under STC, should be of minimum 250 Watts peak, with adequate provision for measurement tolerances. Solar cells should be crystalline silicon cell with min. efficiency of 15% and fill factor more than 70%, should be laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2mm tempered glass including appropriate DC to AC inverter and power controlling unit with MPPT technology to run at low sunshine and minimum 6 hours a day run with all necessary accessories suitable for solar + grid operation and including all protections of AC induction motor pump. (SPV panel should be of reputed make of MNRE and carry at least 20 years warrenty & comprehensive maintenance for 1 year and should preferably above HFL ) (2) Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. Below the ground level as below: (a) By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connectionto equipments incl.drilling holes, withbolts,nuts, washers etc. (3) Lightning protection (Arrestor)(pole mounted)(: Lightning protection with 3" X 1.5" G.I pipe of 4 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc including supply & fixing GI (Hot Dip) strips 20 mm x 3 mm thick for horizontal run on the /Roof with GI Saddles 1100 mm apart. (4) Supply, installation and commissioning of BIS marked submersible pump set of 3 HP with 100mm outlet as per specification using necessary requisite, tools and plants by lowering the same within the tubewell housing pipe upto the following depth as per direction by fitting, fixing column pipes and other accessories, fixtures with necessary nuts, bolts and washers and suspending the entire assembly of pump set vertically by fixing the same supported by M.S. clamps over the top of housing pipe, binding the motor cable with each column pipes and drawing cable upto pump controller/starter point including opening out of the top cap of housing pipe of the tubewell and testing of motor both in loading as well as in unloaded condition before and after installation of the same. (Solar Pumpset and cables should be of reputed make and carry 5 years warrenty). Solar submersible pumpset with 3 HP DC induction motor suitable for 150 mm borewell and minimum discharge capacity approximately 400 LPM at 10 m head working with 3000W of Solar Power array alongwith cables etc. in complete as per MNRE norms & as per IS.(5) Controller : Controller should be of the approved make; as per BIS/IS/MNRE specifications and it should be in accordance with the electrical parameters of the 3HP D.C. Motor/Pump. Controllers should be fixed in suitable IP 54 Box with the provision of SPD as per norms of SNA. Controller must have Remote Monitoring Arrangement as per MNRE guidelines. Some of the requirements of the Controller are : Controller capacity is minimum 3000W, operating freq. 50Hz± 10%, MMPT, IP65 enclosure, DC circuit breaker disconnect switch, GSM/GPRS, LCD display etc.
ESTIMATE FOR CONTROL PANEL Unit ( CE approved rate)
SSK INDUSTRIES
MRIGEN BORUAH
Sri Jiban Chutia
Versha Technotrade JV
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .