Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 CrRejected-Finance 03 09 SHUSANT GOLF CITY SULTANPUR REST YUSUF NAGAR BAGIYA LUCKNOW | ₹1.6 Cr | L2 | Rejected-Finance Rejected due to higher rate |
| 3 | L3₹1.8 CrRejected-Finance 964 RAJENDRA NAGAR ORAI JALAUN | ORAI | JALAUN | UTTAR PRADESH | ₹1.8 Cr | L3 | Rejected-Finance Rejected due to higher rate |
Updated dates
Tender Value
₹1.8 Cr
EMD Value
₹11.1 L
Closing Date
14 Mar 2026, 6:00 pmClosed
SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO
SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO
Construction work of missing link between Barauna to Bhawankheda via Teria Bhawanipur with Five Year Mentinance
2026_CEUCZ_1120217_11
911 M /1MT/ E-Tender/ U.C/2026 Dated 23.02.2026
Open Tender
Civil Works
360 days
SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹11.1 L
Yes
9 Apr 2026
5 Mar 2026
14 Mar 2026
5 Mar 2026
14 Mar 2026
5 Mar 2026
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including all taxes and labour cess but excluding GST
Construction of Subgrade with Material Obtained from Borrow Pits (For Local Earth Work) Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all taxes and labour cess but excluding GST
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method and compacting with smooth wheel roller at OMC to achieve the desired density, complete as per Technical Specification Clause 401. Including all taxes and labour cess but excluding GST
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including all taxes and labour cess but excluding GST
Cement Treated Base (W.M.M.) Providing, laying and spreading material on a prepared sub base,adding Cement at site @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Base (By Manual) Including all taxes and labour cess but excluding GST
Construction of Shoulder (Parti) with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all taxes and labour cess but excluding GST
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including Biumen, all taxes and labour cess but excluding GST
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Including Biumen, all taxes and labour cess but excluding GST
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 A.By Manual Means Including Biumen, all taxes and labour cess but excluding GST
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixture as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including all taxes and labour cess but excluding GST
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 ,including setting out,construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavted suitable material. Including all taxes and labour cess but excluding GST
Plain cement concrete 1:3:6 norminal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed placed in foundation and compected by vibration including curing for 14 days complete Including all taxes and labour cess but excluding GST
Brick masonry work in 1:3 cement and coarse sand mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203. Including all taxes and labour cess but excluding GST
Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 Including all taxes and labour cess but excluding GST
Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/superstracutre as per technical specification clauses 613.4 & 1204 Including all taxes and labour cess but excluding GST
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3 Including all taxes and labour cess but excluding GST
Laying 350 mm dia (NP-3) reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets Including all taxes and labour cess but excluding GST
Laying 1000 mm dia (NP-3) Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets Including all taxes and labour cess but excluding GST
KM Stone, Hectometer Stone Sign Board etc Complete.Including all taxes and labour cess but excluding GST
Maintenance of Road Work constructed road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including all taxes and labour cess but excluding GST) (i) From completion of 1 Year to 2nd year 0.75%
(ii) 2nd year to 3rd year 1.50%
(iii) 3rd year to 4th year 2.25%
(iv) 4th year to 5th year 3.00%
Maintenance of C.C. Work constructed road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including all taxes and labour cess but excluding GST) (i) From completion of 1 Year to 2nd year 0.25%
(ii) 2nd year to 3rd year 0.50%
(iii) 3rd year to 4th year 0.75%
(iv) 4th year to 5th year 1.00%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2083752.pdf
techsummary_2083752.pdf
finance_2083752.pdf
BOQ Comparative Chart
xlsx
finsummary_2083752.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 0.65 MB
BOQ_2083752.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid