Loading…
Loading…
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
27 Jul 2026, 11:00 am
MS-VM section :Manufacture and Supply of welding portions for 52/60 kg rails for various track works in Sr.DEN/South/MAS Jurisdiction. 1) MS-VM Section: TRR(P)- 1.472 km; 2) MS-VM Section: TSR(P)-11.755 km; 3) MS-VM Section: TRR (S)-3.260 km; 4) MS-VM Section: TSR(S)-5.334 km; 5) MS-VM Section: TTR-115 sets; 6) MS- VM Section: TTR- 87 sets; 7) MS-VM Section: TWR-12.50 km; 8) MS-VM Section: Renewal of SEJs- 16 sets, Glued Joints - 4 sets & Improved SEJ - 52kg- 6 set; 9) MS- VM Section: TFR - 29.200 Km (Plain Track) & T/O and TBR (Plain Track) - 0.981 km; 10) MS-VM Section: Conversion of FP track to LWR; 11) MS-VM Section: Casual Renewal of 60 kg Rails , CMS Crossings & Curved Switches; 12) MS-VM Section: Improvements to PEI Ballast Depot.
MAS20OF26093S
MAS20OF26093S
Open
8 Months
Unknown (Unspecified Location)
₹0
₹6.0 L
3 Jul 2026
3 Jul 2026
13 Jul 2026
Schedule of Rates 2021 (SRUSSOR - 2021) for Chennai Division.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
MS-VM section :Manufacture and Supply of welding portions for 52/60 kg rails for various track
works in Sr.DEN/South/MAS Jurisdiction. 1) MS-VM Section: TRR(P)-1.472 km; 2) MS-VM Section:
TSR(P)-11.755 km; 3) MS-VM Section: TRR (S)-3.260 km; 4) MS-VM Section: TSR(S)-5.334 km; 5)
MS-VM Section: TTR-115 sets; 6) MS-VM Section: TTR- 87 sets; 7) MS-VM Section: TWR-12.50 km; 8)
MS-VM Section: Renewal of SEJs- 16 sets, Glued Joints - 4 sets & Improved SEJ - 52kg- 6 set; 9) MS-
VM Section: TFR - 29.200 Km (Plain Track) & T/O and TBR (Plain Track) - 0.981 km; 10) MS-VM
Section: Conversion of FP track to LWR; 11) MS-VM Section: Casual Renewal of 60 kg Rails , CMS
Crossings & Curved Switches; 12) MS-VM Section: Improvements to PEI Ballast Depot.
S No. Item Description of Item Unit Qty Rate Amount
Manufacturing and Supply of Alumino thermic
welding portions of 52Kg/60 Kg/60EI-R260 as
approved by RDSO for welding of rails
52Kg/60Kg/60EI-R260 kg for 25mm gap by the
process of AT welding along with complete
accessories confirming to the specification laid
down in Indian Railway Standard specification
No.IRST-19-2020 up to date correction slips with
Single shot crucible fitted with Automatic Tapping
Thimble, 3 pieces pre fabricated mould (Zircon
washed) manually pressed using compressed air
petrol/LPG pre heating for execution of welding of
rail joint as directed by the engineer in charge at
site. Note: 1. The accessories along with welding
portion shall be supplied as per Annexure-I of the
IRUSSOR - 2021. 2. Rate is inclusive of
transportation of above to SSE/P.Way stores.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NEFTForm.pdf
ATTACHMENT
ProcedureforLCModeofPayment.pdf
ATTACHMENT
GCCApril2022_compressed.pdf
ATTACHMENT
eTenderformApril2022.pdf
ATTACHMENT
SNWmasterlistason09012026.pdf
ATTACHMENT
specialconditionsofcontractfortrackworksDEC2025.pdf
ATTACHMENT
IRGCCACS1to11_compressed.pdf
ATTACHMENT
WELDINGPORTIONSANDWELDINGOFRAILJOINTSFINAL.pdf
ATTACHMENT
FORMATIONBUILDINGBRIDGEPWAYWORKSJULY2024_1.pdf
ATTACHMENT
MOVEMENTOFVEHICLESNEARRAILWAYTRACK.pdf
ATTACHMENT
Safetyinstructionformachineries-merged.pdf
ATTACHMENT
Download all tender documents and submit your bid