Loading…
Loading…
Updated dates
Tender Value
₹4.4 Cr
EMD Value
₹5.2 L
Closing Date
26 Jun 2026, 6:00 pm
CHIEF ENGINEER RND SECUNDERABAD
Chief Engineer RnD Secunderabad Opp Jubilee Bus Station Picket Secunderabad 500003
PROVISION OF DG SETS AND ELECTRICAL ACCESSORIES FOR DATA CENTRE FACILITY AT CABS BANGALORE
2026_MES_765544_1
82678
Open Tender
Electrical and Maintenance Works
300 days
EAST BANGALORE
Class A
category b(i) and b(ii)
8 documents required · 8 mandatory
₹2,000
GARRISON ENGINEER I RND EAST BANGALORE
₹5.2 L
Yes
15 May 2026
15 May 2026
29 Jun 2026
15 May 2026
26 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part-I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl item No. 1.01 & 1.02) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | |||||
| 1.01 | Construction of RCC operator cum storage room alongwith attached toilet new STIR building including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | EACH BLOCK | - | - |
| 1.02 | Construction of RCC operator cum storage room alongwith attached toilet new Admin building including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | EACH BLOCK | - | - |
Lump sum price worked out by the Contractor for “B/R WORK SERVICES FOR DATA CENTRE FACILITY" as listed in Schedule ‘A’ Part - II representing __________ % __________________ percent Above / Below the lump sum price of `16,19,282.95 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 16,19,282.95 | ₹16,19,282.95 | |
| 3 | Lump sum price worked out by the Contractor for “B/R PORTION (02 Nos COVER SHEDS) SITE" as listed in Schedule ‘A’ Part - III representing __________ % __________________ percent Above / Below the lump sum price of `20,87,349.10 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 20,87,349.1 | ₹20,87,349.1 |
| 4 | Lump sum price worked out by the Contractor for “EXCAVATION AND EARTHWORK" as listed in Schedule ‘A’ Part - IV representing __________ % __________________ percent Above / Below the lump sum price of `42,173.13 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 42,173.13 | ₹42,173.13 |
| 5 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - V representing __________ % ____________ percent Above / Below the lump sum price of `10,74,723.00 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 10,74,723 | ₹10,74,723 |
| 6 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VII representing __________ % ____________ percent Above / Below the lump sum price of ₹33,783.45 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 33,783.45 | ₹33,783.45 |
| 7 | Lump sum price worked out by the Contractor for “ROAD / PATH / CULVERT / HARDSTANDING” as listed in Schedule ‘A’ Part - VII representing ________ % ____________ percent Above / Below the lump sum price of ₹5,00,073.51 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 5,00,073.51 | ₹5,00,073.51 |
| 8 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VIII representing _______ % _________________ percent Above / Below the lump sum price of `1,38,506.42 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | LUMPSUM | 1,38,506.42 | ₹1,38,506.42 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_857400.xls
BOQ • 0.69 MB
82678Pre_Priced_Schedules.pdf
Additional Documents • 0.43 MB
82678Tender.pdf
Tender Documents • 1.89 MB
Drawings_01 LD_BAN_58_2026 Sht No 01 OF 01.pdf
Additional Documents • 0.14 MB
Drawings_02 WD_BAN_AR_553_01_ 2026 Sht No 01 OF 02.pdf
Additional Documents • 0.14 MB
Drawings_03 WD_BAN_AR_553_01_ 2026 Sht No 02 OF 02.pdf
Additional Documents • 0.18 MB
Drawings_04 WD_BAN_STR_553_01_ 2026 Sht No 01 OF 02.pdf
Additional Documents • 0.18 MB
Drawings_05 WD_BAN_STR_553_01_ 2026 Sht No 02 OF 02.pdf
Additional Documents • 0.13 MB
Drawings_06 WD_BAN_AR_553_02_ 2026 Sht No 01 OF 02.pdf
Additional Documents • 0.13 MB
Drawings_07 WD_BAN_AR_553_02_ 2026 Sht No 02 OF 02.pdf
Additional Documents • 0.18 MB
Drawings_08 WD_BAN_STR_553_02_ 2026 Sht No 01 OF 02.pdf
Additional Documents • 0.18 MB
Drawings_09 WD_BAN_STR_553_02_ 2026 Sht No 02 OF 02.pdf
Additional Documents • 0.13 MB
Download all tender documents and submit your bid