| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAccepted-Finance | ₹8.4 Cr | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹8.4 Cr+₹2,590.20 (<0.01%)Accepted-Finance | ₹8.4 Cr+₹2,590.20 (<0.01%) | L2 | Accepted-Finance Higher Bidder |
| Sl No | Description | Qty | Unit | Ms Yana Enterprises L1 | M/S OMEGA ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00SH: Jungle Clearance | |||||
| 1.01 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
By Manual Means:- In area of thorny jungle
B. In area of thorny jungle | 10.5 | Hectare | 1,32,556 ₹13,91,838 Lowest | 1,32,556 ₹13,91,838 Lowest |
| 2.00SH:- Formation Cutting | |||||
| 2.01 | Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth on the Barren Valley side. | 1,36,715 | Cum | 255 ₹3,48,62,325 Lowest | 255 ₹3,48,62,325 Lowest |
| 2.02 | Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of excavated earth on the barren valley side. | 91,143.33 | Cum | 373 ₹3,39,96,462.09 Lowest | 373 ₹3,39,96,462.09 Lowest |
| 3.00SH: Kutcha Drain | |||||
| 3.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extend required and utilising the remainingearth locally for road work.)
(I) B Mechanical means (Depth upto 3m) Ordinary soil | 4,704 | Cum | 78 ₹3,66,912 Lowest | 78 ₹3,66,912 Lowest |
| 3.02 | (II) B Mechanical means (Depth upto 3m) ordinary rock | 2,016 | Cum | 102 ₹2,05,632 Lowest | 102 ₹2,05,632 Lowest |
| 4.00SH: RCC SLAB CULVERTS (1.5 M Span) | |||||
| 4.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
I. Ordinary soil.
A. Manual Means
(i). upto 3 m depth | 1,145.1 | Cum | 250 ₹2,86,275 Lowest | 250 ₹2,86,275 Lowest |
Tender Value
Refer Docs
EMD Value
₹8.4 L
Closing Date
20 Mar 2026, 11:00 amClosed
Executive Engineer, Chayangtajo Division, PWD
Office of the Executive Engineer, Chayangtajo Division, PWD
C/o Road from Seppa Chayang Tajo Road to Namchar Bagang.
2026_PWDAP_3085_1
CD/DRG-II/RIDF/2025-26/1
Open Tender
Civil Works
Item Wise
365 days
East Kameng
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Executive Engineer, Chayangtajo, PWD
₹8.4 L
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH: Jungle Clearance | |||||
| 1.01 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
By Manual Means:- In area of thorny jungle
B. In area of thorny jungle | - | Hectare | 1.25 | - |
| 2SH:- Formation Cutting | |||||
| 2.01 | Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth on the Barren Valley side. | 0.29 | Cum | - | - |
| 2.02 | Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of excavated earth on the barren valley side. | - | Cum | 100 | - |
| 3SH: Kutcha Drain | |||||
| 3.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extend required and utilising the remainingearth locally for road work.)
(I) B Mechanical means (Depth upto 3m) Ordinary soil | - | Cum | 53 | - |
| 3.02 | (II) B Mechanical means (Depth upto 3m) ordinary rock | - | Cum | 10 | - |
| 4SH: RCC SLAB CULVERTS (1.5 M Span) | |||||
| 4.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
I. Ordinary soil.
A. Manual Means
(i). upto 3 m depth | 1 | Cum | 11 | ₹10.99 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
TenderDocument.pdf
Tender Documents • 3.18 MB
BOQ_3285.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .