Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
18 Sept 2026, 6:00 pm6d left
EXECUTIVE ENGINEER RandB LOLAB
EXECUTIVE ENGINEER RandB LOLAB
CONSTRUCTION OF FOOTBRIDGE AT YARIBEHEK ON NALLAH DUDI RING.
2026_PWDJK_324185_1
NIT 34
Open Tender
Civil Works
Item Rate
120 days
Lolab
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive enginner RnB Lolab
₹50,000
10 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary Rock | 49.5 | Cum | 493.5 | ₹24,428.25 |
| 2 | Dewatering of Trenches all complete Job as per directions of EIC | 2 | no | 7,000 | ₹14,000 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 34.65 | Cum | 218.4 | ₹7,567.56 |
| 4 | Providing and laying of stone soling/boulders(Hand Packed) including ramming, dressing and watering all complete.(Incl. all sorts of carriage) | 2.7 | Cum | 1,000 | ₹2,700 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate
40mm nominal) crushed aggregate. Incl all carriage | 1.44 | Cum | 5,500 | ₹7,920 |
| 6 | Centring and shuttering including strutting, propping etc and removal of form work Foundations, footings, bases of columns etc. for mass concrete. | 8.75 | Sqm | 286.35 | ₹2,505.56 |
| 7 | Centring and shuttering including strutting, propping etc and removal of form work Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 112.68 | Sqm | 628.95 | ₹70,870.09 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl all carriage upto site of work | 5.31 | Cum | 8,400 | ₹44,604 |
| 9 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl all carriage upto site of work | 22.74 | Cum | 9,800 | ₹2,22,852 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Hot rolled deformed bars | 26.09 | qtl | 12,320 | ₹3,21,428.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_1093177.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .