Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.3 L
EMD Value
₹4,200
Closing Date
24 Feb 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Areae Engineer (EnM)
Sodepur Area
Electrical shifting of PnM Items to New Panel and Transportation and Installation of 02 Nos. Tugger Haulage and One No. of Endless Haulage from S1 Panel to S2 Panel at Bejdih Colliery under Sodepur Area
2024_ECL_300729_1
ECL/SDPA/EnM/24/Tender/494 Date.07.02.2024
Open Tender
Miscellaneous Works
Item Rate
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,200
26 Feb 2024
7 Feb 2024
26 Feb 2024
7 Feb 2024
24 Feb 2024
7 Feb 2024
7 Feb 2024 - 14 Feb 2024
Amount
Items Description
Electrical shifting of P&M Items to New Panel at Bejdih Colliery
Carrying and laying of 400 mrs. 70 sq mm power cable from S1 to S2 pannel
Loading, carrying, unloading and placing the 03 nos. 550 volts switch and 04 nos. drill panels from S1 to S2 pannel
Marching of 02 nos. SDL machine with GEB, trailing cable and power cable from S1 to S2 pannel
Transportation & Installation of 02 Nos. Tugger Haulage & One No. of Endless Haulage from S1 Panel to S2 Panel at Bejdih Colliery
Dismantling the one no. Tugger haulage complete with motor, drum, bedplate. Loading the same with starter, switch cable and L.S. Unit on tub
Carrying the above items to S2 panel and placed them properly and fitting
Dismantling the 19 mm rope and loading the same and carrying the rope to S2 panel and fitting the rope to start the tugger haulage
For second Tugger haulage, Loading the drum, motor, cable, bedplate, starter, switch LS Unit & 19 mm rope and placing the same to S2 panel
Fitting the 19 mm dia rope to drum and start the tugger haulage and set
For Endless haulage, Loading the drum, motor, cable, bedplate, starter, switch LS Unit, 02 nos. Return pulley & 19 mm rope and placing the same to S2 panel
Fitting the 19 mm dia rope from one return pulley to another through drum and start the Endless haulage and test
Overhead cost & Others
Add: CMPF @ 12%
Add: Bonus @ 8.33%
Add: Pension @ 7%
Total impact of GST for the purpose of CTC
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .