Tender Value
₹18.5 L
EMD Value
₹1.9 L
Closing Date
6 Jul 2026, 3:00 pmDue tomorrow
G.M (Jal), Nagar Nigam Saharanpur
G.M (Jal), Nagar Nigam Saharanpur
Laying of 300mm dai NP-3 Sewer line from Riti Ashram Road per Panchal Niwas to Naresh house at Gali No 6 Vijay Colony Ward 2
2026_NNSAH_1165270_1
WW/796/CFC/2026-27
Open Tender
Civil Works - Water Works
60 days
Ward No 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹1.9 L
1 Jul 2026
1 Jul 2026
6 Jul 2026
1 Jul 2026
6 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Diamantling cement concrete or brick or granolithie floors including base concrete and including stacking of dismantled materials as directed by the Engineer in charge within a stance of 60 metre (200 feet) SOR NO-697 | 289.2 | sqm | 38 | ₹10,989.6 |
| 2 | Disposal of wests malba from site upto 5.0km i/c all complete of work ANALYSIS RATE | 23.14 | cum | 130 | ₹3,008.2 |
| 3 | (a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) SOR NO.251 | 347.04 | cum | 90 | ₹31,233.6 |
| 4 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.SOR SI NO. 273 | 29.92 | cum | 2,985 | ₹89,311.2 |
| 5 | Cement Concrete with 4cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour,Tools & plantsetc. required for proper completion of the work (a)Same as above item no.279 but with 2cm. gauge stone grit instead of 4 cm. gauge. SOR SI NO.279A | 29.92 | cum | 5,750 | ₹1,72,040 |
| 6 | Cement Concrete with 4cm gaug eapproved stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour,Tools & plantsetc.required for proper completion of the work.As in item279abovebut inproportions of stone Ballast, Coarse sand and cement.
FOR CHAMBER | 34.7 | cum | 4,850 | ₹1,68,295 |
| 7 | Cement Concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 1:1.5:3 including supply of all materials, labour, Tools&plants etc.required for proper completion of the work. As in item 283 above but in proportions of stone Ballast, Coarse sand and cement. SOR CHP 20, NEW ITEM NO. 09. | 28.92 | cum | 7,300 | ₹2,11,116 |
| 8 | Supply of ISI marked following sizes of NP-3 300mm dis RCC spigotted and socketed non pressure pipes (dia inmm) as per IS 498 including confirming . | 241 | Rmt. | 640 | ₹1,54,240 |
| 9 | Laying and Jointing ISI marked following sizes of 300mm dia RCC pipe NP-3 or NP-4 pipe socket/ spigot including rubber ring and lowering the same into the trenches true to alignment and gradient upto depth as specified bek w G.L as per is 783. is 12288 | 241 | Rmt. | 421.51 | ₹1,01,583.91 |
| 10 | M-150 class Brick in 1:4 (One cement & four fine sand of 1.25 F.M.) mortar.SOR NO.-305 | 15.46 | cum | 4,520 | ₹69,856.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.85 MB
BOQ_2185554.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid