| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.3 LAccepted-AOC 121004 | 1 | Accepted-AOC lower | |
| 2 | 2₹16.3 L+₹2.0 L (14.3%)Rejected-AOC NA | NA | NA | 121004 | 2 | Rejected-AOC higher |
| Sl No | Description | Qty | Unit | PANKAJ KUMAR CONTRACTOR L1 | AARIV ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. upto 1.5 mtr depth | 1 | Cum | 110 ₹110 Lowest | 112 ₹112 |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 1.5 to 2.25 mtr depth | 1 | Cum | 150 ₹150 Lowest | 152 ₹152 |
| 3.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 2.25 to 3.00 mtr depth | 1 | Cum | 210 ₹210 Lowest | 212 ₹212 |
| 4.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 210 ₹210 Lowest | 225 ₹225 |
| 5.00 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 1 | Cum | 7,000 ₹7,000 Lowest | 7,100 ₹7,100 |
| 6.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1 | Sqm | 180 ₹180 Lowest | 185 ₹185 |
| 7.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | Sqm | 150 ₹150 Lowest | 152 ₹152 |
| 8.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | Cum | 5,000 ₹5,000 Lowest | 5,200 ₹5,200 |
| 9.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 2,500 ₹2,500 Lowest | 2,600 ₹2,600 |
| 10.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | 2,000 ₹2,000 Lowest | 2,100 ₹2,100 |
Tender Value
₹48 L
EMD Value
₹26,955
Closing Date
9 Sept 2025, 9:00 amClosed
Divisional Engineer
Divisional Engineer, Devigarh PWRMDC Division, Sangrur
Lining/Re-Lining of w/c of O/L RD 14329-L of Sular Br. Of Lad Banjara Disty Village Dirba, Gujjran by Laying of U/G Pipeline
2025_WR_144083_3
06 of 2025
Open Tender
Civil Works
Item Rate
180 days
Ladd Banjara
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹26,955
Yes
Sangrur
14 Oct 2025
1 Aug 2025
9 Sept 2025
1 Aug 2025
9 Sept 2025
1 Aug 2025
4 Aug 2025
Amount
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. upto 1.5 mtr depth
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 1.5 to 2.25 mtr depth
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 2.25 to 3.00 mtr depth
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Providing Lowering, jointing and cutting of DWC pipes 400 mm dia
Providing Lowering, jointing and cutting of DWC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in manholes complete with cement concrete 1:2:4
T-coupler with 3 rubber ring seal for riser
T-coupler with 3 rubber ring seal for vent pipe
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D-Regulators)
Centreing &shuttering for Concerte faces
Providing & Fixing of steel shutter gates assembly in main pipeline complete in all respect
Dismantling of Brick work in cement
AARIV ENTERPRISES (BID ID -680338)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .