| 1.01 | Dismantling the coil from core | 1 | AU | 3,300 ₹3,300 |
| 1.02 | Charges for de-tanking and assembling | 1 | AU | 4,400 ₹4,400 |
| 1.03 | cleaning of cooling tubes and tanks | 1 | AU | 1,900 ₹1,900 |
| 1.04 | wooden formation for coil making | 1 | AU | 4,000 ₹4,000 |
| 1.05 | all cooling pipe dismantling and refitting | 1 | AU | 4,400 ₹4,400 |
| 1.06 | cooling pipe welding according requirement | 1 | AU | 6,050 ₹6,050 |
| 1.07 | ms channel fitted at tank | 1 | AU | 6,100 ₹6,100 |
| 1.08 | fitting of reformed coils in limbs | 1 | AU | 1,620 ₹1,620 |
| 1.09 | gasket, nuts, bolts, etc | 1 | AU | 4,750 ₹4,750 |
| 1.10 | copper jumper | 11.9 | AU | 1,200 ₹14,280 |
Tender Value
₹3.5 L
EMD Value
₹4,400
Closing Date
28 Feb 2026, 4:00 pmClosed
General Manager SSA
Office of the General Manager, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Repairing/rewinding of 667 kVA, 11 /3.3 kV Power transformer installed at 7/8 substation at Girmint colliery under SSA
2026_ECL_353541_1
ECL/SSA/GM/E M/E-NIT/2025-26/131 Dt 16.02.2026
Open Tender
Electrical and Maintenance Works
15 days
Girmint Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,400
10 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
19 Feb 2026 - 23 Feb 2026
Dismantling the coil from core
Charges for de-tanking and assembling
cleaning of cooling tubes and tanks
wooden formation for coil making
all cooling pipe dismantling and refitting
cooling pipe welding according requirement
ms channel fitted at tank
fitting of reformed coils in limbs
gasket, nuts, bolts, etc
copper jumper
drying of transformer
replacement of studs with insulator
Spray painting
cleaning and decarbonization
replacement of damaged primary conductor
reinsulation of primary conductor
replacement of damaged secondary conductor
reinsulation of secondary conductor
thinner and varnish
oil filtration
Profit
transportation charges
Less Old Unused Scrap Value
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_366344.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid