Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC | ₹5.9 L | 1 | Accepted-AOC L1 bidder hence awarded |
| 2 | 2₹6.1 L+₹19,533.15 (3.33%)Rejected-AOC | ₹6.1 L+₹19,533.15 (3.33%) | 2 | Rejected-AOC L2 bidder hence not awarded |
| 3 | 3₹8.9 L+₹3.1 L (52.6%)Rejected-AOC C O PRAKRAM SINGH VPO GEHRA TEH AND DISTT CHAMBA HP 176324 | GEHRA | CHAMBA | HIMACHAL PRADESH | 176324 | ₹8.9 L+₹3.1 L (52.6%) | 3 | Rejected-AOC L3 bidder hence not awarded |
| Sl No | Description | Qty | Unit | Tilak Raj L1 | VIKASJEET INFRASTRUCTURE PVT. LTD. L3 | Kartikswami Construction Work (OPC) L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 1,550 | Cum | 1,81,350 ₹2,13,993 Lowest | 6,02,950 ₹6,02,950 | 1,86,000 ₹2,19,480 |
| 2.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments,
pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1
Cement : 23coarse sand) : 6 graded stone aggregate 20 mm nominal size | 45.6 | Cum | 2,55,405.6 ₹3,01,378.61 | 2,37,120 ₹2,37,120 Lowest | 2,64,480 ₹3,12,086.4 |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc | 72 | Sqm | 27,792 ₹32,794.56 | 19,368 ₹19,368 Lowest | 28,800 ₹33,984 |
| 4.00 | Providing and fixingrock anchor 25 mm dia 3 to 5 m long into rock/ concrete including drilling the holes and grouting complete as per direction of EIC | 24 | RM | 19,320 ₹22,797.6 | 18,960 ₹18,960 Lowest | 20,400 ₹24,072 |
| 5.00 | Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 185.28 | Kg | 13,154.88 ₹15,522.76 Lowest | 16,304.64 ₹16,304.64 | 13,896 ₹16,397.28 |
Tender Value
₹5.9 L
EMD Value
₹12,000
Closing Date
30 Oct 2025, 4:00 pmClosed
Gr.Sr.Manager (E)
Group Senior Manager (Electrical) Procurement and Contracts Division, NHPC Office Complex Chamera III Power Station, Karian, Chamba (HP) 176310
Removal of boulders from TRT outlet and its front and other repairs and miscellaneous works (E-office no 111753)
2025_NHPC_881342_1
NH/CPS- III/ Pand C/ 111753 /2025-26/201dated 20/10 /2025
Open Tender
Civil Works
Works
10 days
Chamera-III PS
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
NHPC ltd
₹12,000
Yes
21 Aug 2026
15 Oct 2025
3 Nov 2025
15 Oct 2025
30 Oct 2025
15 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.68 MB
Tender.pdf
Tender Documents • 4.62 MB
BOQ_926364.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .