Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -0.15% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 LAdmitted-Finance | -0.09% | ₹4.9 L | L2 | Admitted-Finance |
| 3 | L3₹4.9 LAdmitted-Finance | -0.03% | ₹4.9 L | L3 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹9,902
Closing Date
28 Feb 2026, 5:00 pmClosed
BDO, MATIGARA BLOCK
shivmandir
Construction of CC Drain from H/o. Parbati Munda to H/o. Ajay Das at Factory Line, Sukna T.G within Champasari G.P. Under Matigara Panchayat Samity.
2026_DMD_1013820_1
16/15thCFC/Tied/MPS/25-26/1st, 24.02.26
Open Tender
CIVIL WORKS
30 days
BDO OFFICE, SHIVMANDIR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,902
6 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
28 Feb 2026
24 Feb 2026
Earthwork in excavation for foundation of structures as per drawing and technical specification i/c setting out, removing, spreading or stacking of spoils within a lead of 75m as directed and i/c trimming the sides of the trenches, leveling, dressing and ramming the bottom, boiling out water as required complete. Depth of excavation not exceeding 1.5m
Labour for laying 150mm to 200mm boulder soling i/c rough dressing hand packing and ramming down small pieces in the inter stices i/c rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth without rolling but i/c ramming.
Ordinary Cement Concrete (mix 1:2:4) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant is codes.with rtiver bazree
Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant is codes.with rtiver bazree
Reinforcement for Reinforced Concrete work in all sorts of structures i/c distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooting and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete etc .a) For works in foundation,basement and upto roof of Gr.Fl./upto 4m Tor Steel
Hire and labour charges for shuttering with centering and necessary staging upto 4m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels, curved or straight i/c fitting, fixing and striking out after completion of works upto roof of ground floor. without staging -(25mm to 30mm shuttering)
Hire and labour charges for shuttering with centering and necessary staging upto 4m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels, curved or straight i/c fitting, fixing and striking out after completion of works upto roof of ground floor. with staging -(25mm to 30mm shuttering)
Plaster to (wall , floor, ceiling etc.) with sand and cement mortar i/c rounding off corners or chamfering corners as directed and raking out joints i/c throating,nosing and drip course, scaffolding/staging where necessary .with (1:6) cement mortar -15mm thick plaster.
Neat cement punning about 1.5mm thick in wall,dado ,window,sill,floor etc.
Adding GST @ 18% on total amount upto item no.8
Adding cess@ 1% on total upto item no 9
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_2490129.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid