| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC AT OLD B D O OFFICE MAIN ROAD PHUSRO DIST BOKARO JHARKHAND | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC L1 bidder is techno commercially qualified. | |
| 2 | Rejected-Technical 71 BALU BANKER COLONY P O DHORI 825102 JHARKHAND | BOKARO | JHARKHAND | 825102 | - | Rejected-Technical Bid not be opened as per NIT terms | |
| 3 | Rejected-Technical | - | Rejected-Technical Bid not be opened as per NIT terms. |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
11 Jan 2023, 9:00 amClosed
Staff Officer (EnM)
Office of the General Manager, Dhori Area
Repair of 05 nos. transformer installed at CCD, Dhori area
2022_CCL_266247_1
GM(D)/SO(EnM)/DA/2022-23/155
Open Tender
Electrical and Maintenance Works
Item Wise
20 days
Dhori Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,000
17 Dec 2023
29 Dec 2022
12 Jan 2023
30 Dec 2022
11 Jan 2023
30 Dec 2022
30 Dec 2022 - 5 Jan 2023
Amount
PART A (Do not enter basic rate for this row or put 'zero' as basic rate for this row)
Replacement of drain valve.
Replacement of nuts, bolts, washer, and tio rods.
Supply & Providing of spout bushing insulator with stud set primary side 11KVgrade.
Complete cleaning and Double coat painting of Lighting transformer 100 KVA,11KV/440V including cost of all material & labour cost.
Testing commissioning of transformer
PART B (Do not enter basic rate for this row or put 'zero' as basic rate for this row)
Changing of all gaskit 10mm thickness
Replacement of drain valve.
Supply & Providing of spout bushing insulator with stud set primary side 11KVgrade.
Complete cleaning and Double coat painting of Lighting transformer 500KVA,11KV/440V including cost of all material & labour cost.
Testing commissioning of transformer
PART C (Do not enter basic rate for this row or put 'zero' as basic rate for this row)
Replacement of nuts, bolts, washer, and tio rods.
Changing of all gaskit 10mm thickness
Replacement of drain valve.
Complete cleaning and Double coat painting of Lighting transformer 250 kVA,11KV/440V including cost of all material & labour cost.
Testing commissioning of transformer
PART D (Do not enter basic rate for this row or put 'zero' as basic rate for this row)
Replacement of nuts, bolts, washer, and tio rods.
Replacement of dran valve.
Changing of all gaskit 10mm thickness
Supply & Providing of spout bushing insulator with stud set primary side 11KVgrade.
Complete cleaning and Double coat painting of Lighting transformer 630KVA,11KV/440V including cost of all material & labour cost.
Testing commissioning of transformer
PART E (Do not enter basic rate for this row or put 'zero' as basic rate for this row)
Supply & Providing of spout bushing insulator with stud set primary side 11KVgrade.
Changing of all gaskit 10mm thickness
Replacement of nuts, bolts, washer, and tio rods.
Testing commissioning of transformer
Supervision, incidental & overhead expenses
Total impact of GST for the purpose of CTC
M/S NATIONAL ELECTRICAL WORKS
M/S SHREE TIRUPATI TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .