| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | ₹5.6 L | L1 | Accepted-AOC work |
| 2 | L2₹5.8 LRejected-Finance | ₹5.8 L | L2 | Rejected-Finance approved |
| Sl No | Description | Qty | Unit | Five Pillaars Association L2 | PAVITHRA CONSTRUCTIONS & CONSULTANCY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B. | 102 | M3 | 247 ₹25,194 | 246 ₹25,092 |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement,four sand and eight aggregate) mix using 40mm gauge hand broken hard granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm well rammed etc., complete complying with standard specifications. | 15 | M3 | 5,200 ₹78,000 | 5,188 ₹77,820 |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and srtutting upto 3.29mm height for plane surfaces in all floors with cross bracings using miled steel sheets of size 30cm x 60cm and 10 gauge stiffened welded with miled steel sheets of size 25mm x 25mm x 3mm for boarding and laid over silver oak (country wood).Joists of size 10cm x 6.5cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced 75cm centre to centre etc., complete complying with standard specification ans as directed for the following items as per MORTH Specification 1500. (For Drain,Deck slab & Retainingwall) SideWall | 298 | M2 | 460 ₹1.4 L | 459 ₹1.4 L |
| 3.10 | Slab | 6 | M2 | 1,100 ₹6,600 | 1,023 ₹6,138 |
| 4.00 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M- Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 46 | M3 | 6,200 ₹2.9 L | 5,918 ₹2.7 L |
| 5.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3. | 2 | M3 | 9,000 ₹18,000 | 8,185 ₹16,370 |
| 6.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3 | 150 | Kg | 90 ₹13,500 | 89 ₹13,350 |
| 7.00 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete | 75 | M2 | 170 ₹12,750 | 160 ₹12,000 |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
27 Feb 2025, 3:00 pmClosed
Executive officer
Executive officer Kunnathurtp
15th FC Tied Grant 2nd installment Construction of Drain at ward no 11 Karungalmedu 2nd Street
2025_DTP_527169_1
164/2025
Open Tender
Civil Works - Others
Kunnathur
15th FC Tied Grant 2nd installment Construction of Drain at ward no 11 Karungalmedu 2nd Street
2 documents required · 2 mandatory
₹0
₹14,000
19 Mar 2026
24 Feb 2025
27 Feb 2025
24 Feb 2025
27 Feb 2025
24 Feb 2025
24 Feb 2025 - 27 Feb 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid